Activity
From 11 Sep 2024 to 20 Sep 2024
20 Sep 2024
- 19:17 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Setup demo kit for presentation Copeland
- 19:16 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #641 (Closed): [Requirement and support] MOC Line IoT Project)
- Meeting about update schedule installation
- 17:31 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 3.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Fixed check condition of shipping function.
- 17:30 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Refactor code all function.
- 17:29 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Created document for users training 1/2.
- 17:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed and completed import master plan production schedule csv and gen schedule production inbound.
- 17:11 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed import master plan production schedule csv.
- 17:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
- Modify PC Software.
- 16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #725 (Closed): Infrastructure IoT dashboard / Backend)
- database design
- 16:34 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create i-Reporter form
- 16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Adjust Module Daily check
- 16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Adjust Module Daily check
- 08:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Meeting about update specification and site survey
19 Sep 2024
- 19:41 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed the modification of the delivery function for SDI and remotely updated the code on the client...
- 19:39 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Meet with the development team and the client to modify the delivery type for SDI.
- 17:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create i-Reporter form
- 16:54 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
- Modify PC Software.
- 16:43 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Test and fixed all function with ASUTO.
- 16:42 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Meeting upgrade SDI function.
- 16:41 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Adjust Daily check process.
- 16:41 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Adjust Daily check process.
- 16:41 HAMADEN MEXICO S.A.DE C.V 5.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Add config element form to csv file of history page.
18 Sep 2024
- 22:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Make specification
- 17:41 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Add config element form to csv file of pokayoke page.
- 17:37 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Testing all page on A400 after change library.
- 17:37 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Testing and fixed outbound SDI Function.
- 16:52 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Move Inspector, MC Scan to first page
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Move Inspector, MC Scan to first page
- 16:48 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
- Modify PC Software.
- 16:42 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
- Meeting and make concept
- 14:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create i-Reporter form
- 12:00 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- create page inbound rework, create template label html
- 11:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- function label print
- 11:58 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- Adjust the user interface to be compatible with each other. [Schedule, inbound]
- 11:55 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- Inbound Detail
- 11:44 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Customers encounter problems with damaged barcodes and cannot be scanned and test the printer settings with the custo...
- 11:42 TOMAS TECH CO., LTD. 6.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- meeting about Asprova at NTPT
- 11:39 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #674 (Closed): [Installation]Process Control System phase2)
- 11:37 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Sick Leave
17 Sep 2024
- 17:51 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Test send data to PLC.
- 16:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
- Modify PC Software.
- 16:20 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Test and Deploy to server
- 16:20 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Deploy to server
- 14:35 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed and completed Page Inbound Schedule Material in Function Purchase Order (Table Main and Details)
- 14:26 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed and completed import delivery schedule csv.
- 14:32 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed Modify Database Outbound delivery Sdi and Website Function Outbound Delivery Web Pegasus.
- 14:30 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Meeting Requirement Outbound SDI with Client.
- 14:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- create i-Reporter form
- 09:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- Installation&On-site support
- 09:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- Installation&On-site support
- 09:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- Installation&On-site support
- 09:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- Installation&On-site support
- 09:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- Installation&On-site support
- 09:34 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:34 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:34 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:30 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- install OCR matching and check label master & app menu(Clear, MainMenu)
- 09:28 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:27 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:27 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:25 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
- Modify Handy terminal app
- 09:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Installation&On-site support
- 09:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #459 (Closed): support user for process control system)
- install RAM and Harddisk on Server process control & Check label printer @PLCC room
- 09:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus)
- Meeting & Survey on-site
- 08:43 TOMAS TECH CO., LTD. 8.00 hours (Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus)
- Meeting & Survey on-site
- 08:28 TOMAS TECH CO., LTD. 8.00 hours (Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus)
- Meeting & Survey on-site
- 09:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
- Support Conmas i-Reporter demo
- 08:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
- Create demo form Topre i-reporter and user on Conmas Manager
- 08:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
- Create demo form Topre i-reporter and user on Conmas Manager
- 08:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
- Create demo form Topre i-reporter and user on Conmas Manager
- 08:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
- Create demo form Topre i-reporter and user on Conmas Manager
- 09:17 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
- Installation&On-site support about Access point in Chip room
- 08:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
- Installation of access points in mold rooms
- 08:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
- Installation of access points in mold rooms
- 09:15 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
- Installation&On-site support
- 09:15 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
- Installation&On-site support
- 08:38 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
- On-site support
- 08:38 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
- On-site support
- 09:13 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Parent project #660 (Closed): [PJ240034] Pokayoke matching system for AIKAI)
- Installation&On-site support
- 09:13 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Parent project #660 (Closed): [PJ240034] Pokayoke matching system for AIKAI)
- Installation&On-site support
- 08:32 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Parent project #660 (Closed): [PJ240034] Pokayoke matching system for AIKAI)
- Installation&On-site support
- 08:21 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 08:19 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Parent project #543 (In Progress): [PJ230053]Handy terminal stock management system for Finished product)
- Support to start using WMS the system for handy terminal & pegasus system
16 Sep 2024
- 17:48 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Meeting with TMC Customer and develop Outbound SDI(Change).
- 16:54 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
- Make concept and internal meeting
- 16:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
- Make concept
- 16:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
- Make concept
- 16:53 TOMAS TECH CO., LTD. 8.00 hours (Sales support #444 (In Progress): For internal meeting and other)
- sick leave
- 16:48 TOMAS TECH CO., LTD. 8.00 hours (Sales support #444 (In Progress): For internal meeting and other)
- sick leave
- 16:53 TOMAS TECH CO., LTD. 8.00 hours (Sales support #722 (In Progress): MCCT Make concept and summary cost)
- Meeting
- 16:50 TAKEBE (THAILAND) CO., LTD. 8.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
- Test pulling data CKD Equipment
- 16:49 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
- Meeting
- 16:37 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
- Test pulling data for Pararall concept
- 16:33 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
- Site survey and meeting
- 16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
- Modify PC Software.
- 16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
- Update proposal
- 16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
- Meeting about present proposal
- 16:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
- Site survey
- 16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
- Meeting
- 16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Meeting and Site survey
- 16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Check part list
- 16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Include rate to function for calculate in system.
- 16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Include rate to function for calculate in system.
- 16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Meeting about update progress work
- 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Specification design
- 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Specification design
- 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Specification design
- 16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Specification design
- 16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
- Specification design
- 16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
- Install and debug program
- 16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
- Installation
- 16:30 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
- Program developer
- 16:30 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
- Program developer
- 16:25 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
- Program developer
- 16:25 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
- Program developer
- 16:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
- Site survey
- 14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create an i-Reporter form
- 01:01 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- 00:58 NTPT COMPANY LIMITED. 7.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- 00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- 00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
15 Sep 2024
- 17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 32/37
- 17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 33/37
- 17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 34/37
- 17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 35/37
- 17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 36/37
- 17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 37/37
- 17:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 80.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- 17:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 10/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 9/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 8/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 7/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 6/10
13 Sep 2024
- 17:20 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Meeting tomas pokayoke flow.
- 17:19 HAMADEN MEXICO S.A.DE C.V 7.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Develop save PLC and edit send data.
- 16:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #524 (New): Konlawat Saechee Taking Day off January-December 2024)
- Sick
- 16:54 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:52 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #717 (Closed): Air Conditioner Installation)
- 16:50 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #716 (Closed): PLC data clear error)
- debug
- 16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:36 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Create a form for setting rates.
- 16:36 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Create a form for setting rates.
- 15:12 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create document forms
- 10:15 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed import delivery schedule csv.
- 10:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed and completed Page Tag Generator (Label Status)
- 10:12 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed Page Master Management Crusher Ratio Master
12 Sep 2024
- 17:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create a document form
- 17:34 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Develop save data history to SQLite.
- 17:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Change the function cost bar chart to an energy cost bar chart
- 16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Change the function cost bar chart to an energy cost bar chart
11 Sep 2024
- 21:10 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Add send data to PCL(Simulate by hercules software).
- 16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- -Training end user
- 16:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Training end user
- 15:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation
- 14:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- i-Reporter form
- 13:45 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 10:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
- Fix slow data loading issues, fix API, test the system with customers.
- 10:27 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Internal meeting with K.Pai about ASI slow handy problem. Internal meeting with K.Nueng about YAMATO project
Also available in: Atom