19:17 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
Setup demo kit for presentation Copeland Nattapol Poeam
19:16 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #641 (Closed): [Requirement and support] MOC Line IoT Project)
Meeting about update schedule installation Nattapol Poeam
17:31 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 3.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Fixed check condition of shipping function. Taweesak Prumvised
17:30 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Refactor code all function. Taweesak Prumvised
17:29 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Created document for users training 1/2. Taweesak Prumvised
17:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed import master plan production schedule csv and gen schedule production inbound. Ronnagon Kongsuwan
17:11 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed import master plan production schedule csv. Ronnagon Kongsuwan
17:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Modify PC Software. Kamol Anekchatnuntakool
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #725 (Closed): Infrastructure IoT dashboard / Backend)
database design Thiraporn Amornsirinukorh
16:34 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust Module Daily check Priroj Neamjarn
16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust Module Daily check Priroj Neamjarn
08:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Meeting about update specification and site survey Nattapol Poeam

19 Sep 2024

19:41 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed the modification of the delivery function for SDI and remotely updated the code on the client... Ronnagon Kongsuwan
19:39 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meet with the development team and the client to modify the delivery type for SDI. Ronnagon Kongsuwan
17:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:54 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Modify PC Software. Kamol Anekchatnuntakool
16:43 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Test and fixed all function with ASUTO. Taweesak Prumvised
16:42 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting upgrade SDI function. Taweesak Prumvised
16:41 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust Daily check process. Priroj Neamjarn
16:41 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust Daily check process. Priroj Neamjarn
16:41 HAMADEN MEXICO S.A.DE C.V 5.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add config element form to csv file of history page. Taweesak Prumvised

18 Sep 2024

22:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Make specification Nattapol Poeam
17:41 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add config element form to csv file of pokayoke page. Taweesak Prumvised
17:37 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Testing all page on A400 after change library. Taweesak Prumvised
17:37 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Testing and fixed outbound SDI Function. Taweesak Prumvised
16:52 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Move Inspector, MC Scan to first page Priroj Neamjarn
16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Move Inspector, MC Scan to first page Priroj Neamjarn
16:48 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Modify PC Software. Kamol Anekchatnuntakool
16:42 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Meeting and make concept Nattapol Poeam
14:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
12:00 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
create page inbound rework, create template label html Soraya Norasing
11:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
function label print Soraya Norasing
11:58 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Adjust the user interface to be compatible with each other. [Schedule, inbound] Soraya Norasing
11:55 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound Detail Soraya Norasing
11:44 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Customers encounter problems with damaged barcodes and cannot be scanned and test the printer settings with the custo... Soraya Norasing
11:42 TOMAS TECH CO., LTD. 6.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting about Asprova at NTPT Soraya Norasing
11:39 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Soraya Norasing
11:37 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Sick Leave Soraya Norasing

17 Sep 2024

17:51 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Test send data to PLC. Taweesak Prumvised
16:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Modify PC Software. Kamol Anekchatnuntakool
16:20 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Test and Deploy to server Priroj Neamjarn
16:20 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Deploy to server Priroj Neamjarn
14:35 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Inbound Schedule Material in Function Purchase Order (Table Main and Details) Ronnagon Kongsuwan
14:26 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed import delivery schedule csv. Ronnagon Kongsuwan
14:32 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Modify Database Outbound delivery Sdi and Website Function Outbound Delivery Web Pegasus. Ronnagon Kongsuwan
14:30 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting Requirement Outbound SDI with Client. Ronnagon Kongsuwan
14:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
create i-Reporter form Panthita Roekdee
09:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Installation&On-site support Arunwit Isarapongporn
09:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Installation&On-site support Arunwit Isarapongporn
09:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Installation&On-site support Arunwit Isarapongporn
09:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Installation&On-site support Arunwit Isarapongporn
09:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Installation&On-site support Arunwit Isarapongporn
09:34 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:34 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:34 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:30 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
install OCR matching and check label master & app menu(Clear, MainMenu) Arunwit Isarapongporn
09:28 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:27 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:27 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:25 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify Handy terminal app Arunwit Isarapongporn
09:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Installation&On-site support Arunwit Isarapongporn
09:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #459 (Closed): support user for process control system)
install RAM and Harddisk on Server process control & Check label printer @PLCC room Arunwit Isarapongporn
09:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus)
Meeting & Survey on-site Arunwit Isarapongporn
08:43 TOMAS TECH CO., LTD. 8.00 hours (Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus)
Meeting & Survey on-site Arunwit Isarapongporn
08:28 TOMAS TECH CO., LTD. 8.00 hours (Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus)
Meeting & Survey on-site Arunwit Isarapongporn
09:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Support Conmas i-Reporter demo Arunwit Isarapongporn
08:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter and user on Conmas Manager Arunwit Isarapongporn
08:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter and user on Conmas Manager Arunwit Isarapongporn
08:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter and user on Conmas Manager Arunwit Isarapongporn
08:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter and user on Conmas Manager Arunwit Isarapongporn
09:17 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
Installation&On-site support about Access point in Chip room Arunwit Isarapongporn
08:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
Installation of access points in mold rooms Arunwit Isarapongporn
08:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
Installation of access points in mold rooms Arunwit Isarapongporn
09:15 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
Installation&On-site support Arunwit Isarapongporn
09:15 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
Installation&On-site support Arunwit Isarapongporn
08:38 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
On-site support Arunwit Isarapongporn
08:38 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
On-site support Arunwit Isarapongporn
09:13 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Parent project #660 (Closed): [PJ240034] Pokayoke matching system for AIKAI)
Installation&On-site support Arunwit Isarapongporn
09:13 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Parent project #660 (Closed): [PJ240034] Pokayoke matching system for AIKAI)
Installation&On-site support Arunwit Isarapongporn
08:32 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Parent project #660 (Closed): [PJ240034] Pokayoke matching system for AIKAI)
Installation&On-site support Arunwit Isarapongporn
08:21 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
08:19 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Parent project #543 (In Progress): [PJ230053]Handy terminal stock management system for Finished product)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn

16 Sep 2024

17:48 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting with TMC Customer and develop Outbound SDI(Change). Taweesak Prumvised
16:54 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Make concept and internal meeting Nattapol Poeam
16:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Make concept Nattapol Poeam
16:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Make concept Nattapol Poeam
16:53 TOMAS TECH CO., LTD. 8.00 hours (Sales support #444 (In Progress): For internal meeting and other)
sick leave Nattapol Poeam
16:48 TOMAS TECH CO., LTD. 8.00 hours (Sales support #444 (In Progress): For internal meeting and other)
sick leave Nattapol Poeam
16:53 TOMAS TECH CO., LTD. 8.00 hours (Sales support #722 (In Progress): MCCT Make concept and summary cost)
Meeting Nattapol Poeam
16:50 TAKEBE (THAILAND) CO., LTD. 8.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
Test pulling data CKD Equipment Nattapol Poeam
16:49 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Meeting Nattapol Poeam
16:37 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Test pulling data for Pararall concept Nattapol Poeam
16:33 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Site survey and meeting Nattapol Poeam
16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Modify PC Software. Kamol Anekchatnuntakool
16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
Update proposal Nattapol Poeam
16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
Meeting about present proposal Nattapol Poeam
16:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
Site survey Nattapol Poeam
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Meeting Nattapol Poeam
16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Meeting and Site survey Nattapol Poeam
16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
Check part list Nattapol Poeam
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Include rate to function for calculate in system. Priroj Neamjarn
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Include rate to function for calculate in system. Priroj Neamjarn
16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Meeting about update progress work Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Install and debug program Nattapol Poeam
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Installation Nattapol Poeam
16:30 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:30 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:25 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:25 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
Site survey Nattapol Poeam
14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create an i-Reporter form Panthita Roekdee
01:01 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 7.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn

15 Sep 2024

17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 32/37 Thanthima Phaengkham
17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 33/37 Thanthima Phaengkham
17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 34/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 35/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 36/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 37/37 Thanthima Phaengkham
17:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 80.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Thanthima Phaengkham
17:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 10/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 9/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 8/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 7/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 6/10 Thanthima Phaengkham

13 Sep 2024

17:20 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting tomas pokayoke flow. Taweesak Prumvised
17:19 HAMADEN MEXICO S.A.DE C.V 7.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop save PLC and edit send data. Taweesak Prumvised
16:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #524 (New): Konlawat Saechee Taking Day off January-December 2024)
Sick Konlawat Saechee
16:54 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:52 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #717 (Closed): Air Conditioner Installation)
Teeradon Yuensakul
16:50 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #716 (Closed): PLC data clear error)
debug Teeradon Yuensakul
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:36 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Create a form for setting rates. Priroj Neamjarn
16:36 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Create a form for setting rates. Priroj Neamjarn
15:12 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create document forms Panthita Roekdee
10:15 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed import delivery schedule csv. Ronnagon Kongsuwan
10:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Tag Generator (Label Status) Ronnagon Kongsuwan
10:12 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed Page Master Management Crusher Ratio Master Ronnagon Kongsuwan

12 Sep 2024

17:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create a document form Panthita Roekdee
17:34 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop save data history to SQLite. Taweesak Prumvised
17:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Change the function cost bar chart to an energy cost bar chart Priroj Neamjarn
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Change the function cost bar chart to an energy cost bar chart Priroj Neamjarn

11 Sep 2024

21:10 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add send data to PCL(Simulate by hercules software). Taweesak Prumvised
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Training end user Priroj Neamjarn
16:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Training end user Priroj Neamjarn
15:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation Thanthima Phaengkham
14:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
i-Reporter form Panthita Roekdee
13:45 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
10:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Fix slow data loading issues, fix API, test the system with customers. Soraya Norasing
10:27 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal meeting with K.Pai about ASI slow handy problem. Internal meeting with K.Nueng about YAMATO project Soraya Norasing
 