16 Sep 2024

17:48 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting with TMC Customer and develop Outbound SDI(Change). Taweesak Prumvised
16:54 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Make concept and internal meeting Nattapol Poeam
16:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Make concept Nattapol Poeam
16:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #719 (In Progress): Traceability new line for ADVICS)
Make concept Nattapol Poeam
16:53 TOMAS TECH CO., LTD. 8.00 hours (Sales support #444 (In Progress): For internal meeting and other)
sick leave Nattapol Poeam
16:48 TOMAS TECH CO., LTD. 8.00 hours (Sales support #444 (In Progress): For internal meeting and other)
sick leave Nattapol Poeam
16:53 TOMAS TECH CO., LTD. 8.00 hours (Sales support #722 (In Progress): MCCT Make concept and summary cost)
Meeting Nattapol Poeam
16:50 TAKEBE (THAILAND) CO., LTD. 8.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
Test pulling data CKD Equipment Nattapol Poeam
16:49 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Meeting Nattapol Poeam
16:37 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Test pulling data for Pararall concept Nattapol Poeam
16:33 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Site survey and meeting Nattapol Poeam
16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Modify PC Software. Kamol Anekchatnuntakool
16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
Update proposal Nattapol Poeam
16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
Meeting about present proposal Nattapol Poeam
16:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
Site survey Nattapol Poeam
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Meeting Nattapol Poeam
16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Meeting and Site survey Nattapol Poeam
16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
Check part list Nattapol Poeam
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Include rate to function for calculate in system. Priroj Neamjarn
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Include rate to function for calculate in system. Priroj Neamjarn
16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Meeting about update progress work Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #720 (Closed): Specification and system design)
Specification design Nattapol Poeam
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Install and debug program Nattapol Poeam
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Installation Nattapol Poeam
16:30 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:30 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:25 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:25 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
Program developer Nattapol Poeam
16:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
Site survey Nattapol Poeam
14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create an i-Reporter form Panthita Roekdee
01:01 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
01:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 7.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:58 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn

15 Sep 2024

17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 32/37 Thanthima Phaengkham
17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 33/37 Thanthima Phaengkham
17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 34/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 35/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 36/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 37/37 Thanthima Phaengkham
17:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 80.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Thanthima Phaengkham
17:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 10/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 9/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 8/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 7/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 6/10 Thanthima Phaengkham

13 Sep 2024

17:20 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting tomas pokayoke flow. Taweesak Prumvised
17:19 HAMADEN MEXICO S.A.DE C.V 7.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop save PLC and edit send data. Taweesak Prumvised
16:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #524 (New): Konlawat Saechee Taking Day off January-December 2024)
Sick Konlawat Saechee
16:54 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:52 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #717 (Closed): Air Conditioner Installation)
Teeradon Yuensakul
16:50 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #716 (Closed): PLC data clear error)
debug Teeradon Yuensakul
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:36 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Create a form for setting rates. Priroj Neamjarn
16:36 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Create a form for setting rates. Priroj Neamjarn
15:12 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create document forms Panthita Roekdee
10:15 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed import delivery schedule csv. Ronnagon Kongsuwan
10:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Tag Generator (Label Status) Ronnagon Kongsuwan
10:12 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed Page Master Management Crusher Ratio Master Ronnagon Kongsuwan

12 Sep 2024

17:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create a document form Panthita Roekdee
17:34 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop save data history to SQLite. Taweesak Prumvised
17:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Change the function cost bar chart to an energy cost bar chart Priroj Neamjarn
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Change the function cost bar chart to an energy cost bar chart Priroj Neamjarn

11 Sep 2024

21:10 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add send data to PCL(Simulate by hercules software). Taweesak Prumvised
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Training end user Priroj Neamjarn
16:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Training end user Priroj Neamjarn
15:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation Thanthima Phaengkham
14:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
i-Reporter form Panthita Roekdee
13:45 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
10:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Fix slow data loading issues, fix API, test the system with customers. Soraya Norasing
10:27 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal meeting with K.Pai about ASI slow handy problem. Internal meeting with K.Nueng about YAMATO project Soraya Norasing

10 Sep 2024

17:03 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop setting PCL Host. Taweesak Prumvised
17:03 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Develop pokayoke function. Taweesak Prumvised
16:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Create package and log file to edit table. It have for update application Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Crate package and log file to edit table. It have for update application Priroj Neamjarn
13:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
create an i-Reporter form Panthita Roekdee
11:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed import remain po and gen schedule inbound item. Ronnagon Kongsuwan
11:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Develop import remain po and gen schedule inbound item Ronnagon Kongsuwan
10:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 5/10 Thanthima Phaengkham
10:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 4/10 Thanthima Phaengkham
10:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 3/10 Thanthima Phaengkham
10:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 2/10 Thanthima Phaengkham
10:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 1/10 Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
10:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
10:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 8/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 3/29 Thanthima Phaengkham
10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
10:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
10:04 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
09:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
09:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
09:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
09:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
09:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
STEP - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Parent project #542 (Closed): [PJ240019] CKD system for Logistics Alliance (Thailand) CO.,LTD CYLC)
[Task] LAT - STEP - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
09:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
09:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
09:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
09:32 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
09:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
09:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 8/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 3/29 Thanthima Phaengkham
09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
09:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 192.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 24/24 Thanthima Phaengkham
09:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 23/24 Thanthima Phaengkham
09:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 22/24 Thanthima Phaengkham
09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24 Thanthima Phaengkham
09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24 Thanthima Phaengkham
09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 20/24 Thanthima Phaengkham
09:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 19/24 Thanthima Phaengkham
09:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 18/24 Thanthima Phaengkham
09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 17/24 Thanthima Phaengkham
09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 16/24 Thanthima Phaengkham
09:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 15/24 Thanthima Phaengkham
09:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 14/24 Thanthima Phaengkham
09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 13/24 Thanthima Phaengkham
09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 12/24 Thanthima Phaengkham
09:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 11/24 Thanthima Phaengkham
09:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 10/24 Thanthima Phaengkham
09:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 9/24 Thanthima Phaengkham
09:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 8/24 Thanthima Phaengkham
09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 7/24 Thanthima Phaengkham
09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 6/24 Thanthima Phaengkham
09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 5/24 Thanthima Phaengkham
09:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 4/24 Thanthima Phaengkham
09:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 3/24 Thanthima Phaengkham
09:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 2/24 Thanthima Phaengkham
09:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 1/24 Thanthima Phaengkham

09 Sep 2024

18:17 HAMADEN MEXICO S.A.DE C.V 5.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop setting PCL Host. Taweesak Prumvised
18:17 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 3.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Testing and fixed change location. Taweesak Prumvised
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound Detail Soraya Norasing
16:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound schedule & Inbound Detail Soraya Norasing
16:40 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound schedule Soraya Norasing
16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Add function show color after user is confirm message. Priroj Neamjarn
16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Add function show color after user is confirm message. Priroj Neamjarn
15:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
First day of work Panthita Roekdee

08 Sep 2024

09:06 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add PLC Setting host function. Taweesak Prumvised
09:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Testing change location and fixed stocktaking. Taweesak Prumvised
09:03 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Develop pokayoke function 1/1 Taweesak Prumvised

07 Sep 2024

16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Add Table Database HT Software. Kamol Anekchatnuntakool
16:50 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
Make Document specifications Konlawat Saechee
16:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #524 (New): Konlawat Saechee Taking Day off January-December 2024)
- Konlawat Saechee
16:49 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Edit according to the comments after user training Teeradon Yuensakul
16:48 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Edit according to the comments after training Teeradon Yuensakul
16:48 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
User training Teeradon Yuensakul
16:47 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:47 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:47 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Data Monitor and Debug Teeradon Yuensakul
16:46 TOMAS TECH CO., LTD. 4.00 hours (Sales support #691 (Closed): JTAP Inspection camera(CKD))
Testing the object detection and OCR function Konlawat Saechee
16:46 TOMAS TECH CO., LTD. 4.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
Meeting about demo kit Konlawat Saechee
16:39 TOMAS TECH CO., LTD. 4.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
Keyence Demo kit (Drawing) Konlawat Saechee
16:37 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:37 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:35 TOMAS TECH CO., LTD. 4.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:34 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
Weighting machine communication test Konlawat Saechee
16:40 TOMAS TECH CO., LTD. 4.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
3D Drawing and Estimate cost Konlawat Saechee
16:35 TOMAS TECH CO., LTD. 4.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
Keyence Meeting about LAZADA project Konlawat Saechee
16:30 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
LAZADA Aluminum frame design Konlawat Saechee
16:30 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
LAZADA Aluminum frame design Konlawat Saechee
16:29 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
LAZADA Aluminum frame design Konlawat Saechee
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast and receive real-time log power Priroj Neamjarn
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast and receive real-time log power Priroj Neamjarn
15:01 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Fix date errors in production lot sizes and adjust the display of quotation PDFs (requiment with user). Ronnagon Kongsuwan
14:55 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Fixed and testing outbound delivery with haddy. Ronnagon Kongsuwan
14:52 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting and testing and fix requiemnt client. Ronnagon Kongsuwan
15:00 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Inbound Inquiry, Stock, Outbound Inquiry Ronnagon Kongsuwan
14:57 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed Design and Data in Page Inbound Inquiry, Stock, Outbound Inquiry Ronnagon Kongsuwan
14:53 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Master Management Design and data. Ronnagon Kongsuwan
 