From 30 Aug 2024 to 08 Sep 2024

08 Sep 2024

09:06 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add PLC Setting host function. Taweesak Prumvised
09:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Testing change location and fixed stocktaking. Taweesak Prumvised
09:03 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Develop pokayoke function 1/1 Taweesak Prumvised

07 Sep 2024

16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Add Table Database HT Software. Kamol Anekchatnuntakool
16:50 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
Make Document specifications Konlawat Saechee
16:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #524 (New): Konlawat Saechee Taking Day off January-December 2024)
- Konlawat Saechee
16:49 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Edit according to the comments after user training Teeradon Yuensakul
16:48 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Edit according to the comments after training Teeradon Yuensakul
16:48 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
User training Teeradon Yuensakul
16:47 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:47 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:47 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Data Monitor and Debug Teeradon Yuensakul
16:46 TOMAS TECH CO., LTD. 4.00 hours (Sales support #691 (Closed): JTAP Inspection camera(CKD))
Testing the object detection and OCR function Konlawat Saechee
16:46 TOMAS TECH CO., LTD. 4.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
Meeting about demo kit Konlawat Saechee
16:39 TOMAS TECH CO., LTD. 4.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
Keyence Demo kit (Drawing) Konlawat Saechee
16:37 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:37 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:35 TOMAS TECH CO., LTD. 4.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:34 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3d Drawing and Estimate cost Konlawat Saechee
16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
Weighting machine communication test Konlawat Saechee
16:40 TOMAS TECH CO., LTD. 4.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
3D Drawing and Estimate cost Konlawat Saechee
16:35 TOMAS TECH CO., LTD. 4.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
Keyence Meeting about LAZADA project Konlawat Saechee
16:30 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
LAZADA Aluminum frame design Konlawat Saechee
16:30 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
LAZADA Aluminum frame design Konlawat Saechee
16:29 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
LAZADA Aluminum frame design Konlawat Saechee
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast and receive real-time log power Priroj Neamjarn
16:31 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast and receive real-time log power Priroj Neamjarn
15:01 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Fix date errors in production lot sizes and adjust the display of quotation PDFs (requiment with user). Ronnagon Kongsuwan
14:55 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Fixed and testing outbound delivery with haddy. Ronnagon Kongsuwan
14:52 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting and testing and fix requiemnt client. Ronnagon Kongsuwan
15:00 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Inbound Inquiry, Stock, Outbound Inquiry Ronnagon Kongsuwan
14:57 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed Design and Data in Page Inbound Inquiry, Stock, Outbound Inquiry Ronnagon Kongsuwan
14:53 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Master Management Design and data. Ronnagon Kongsuwan

06 Sep 2024

16:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Add Table Database HT Software. Kamol Anekchatnuntakool
16:43 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #706 (Closed): Demo Develop HT Software for Scan data and Receive weight data.)
Test and Revise DEMO Develop HT Scan Check Weight Software. Kamol Anekchatnuntakool
16:35 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kickoff meeting at online Kittisak Isarapongporn
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast Priroj Neamjarn
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast Priroj Neamjarn

05 Sep 2024

17:45 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add UI Screen. Taweesak Prumvised
17:44 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Testing outbound picking function. Taweesak Prumvised
17:41 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Fixed and testing outbound delivery. Taweesak Prumvised
17:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #706 (Closed): Demo Develop HT Software for Scan data and Receive weight data.)
Develop HT Software for Scan data and Receive weight data. Kamol Anekchatnuntakool
16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast Priroj Neamjarn
16:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix function forecast Priroj Neamjarn
10:58 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Soraya Norasing
10:57 TOMAS TECH CO., LTD. 3.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal meeting with K.Ann about ASI project Soraya Norasing
10:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound schedule Soraya Norasing
10:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
bacis function & menu Soraya Norasing
10:55 YAMATO ELECTRIC (THAILAND) CO., LTD. 5.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
bacis function & menu Soraya Norasing

04 Sep 2024

20:27 A.N.I. LOGISTICS, LTD. 8.00 hours (Parent project #708 (Closed): IKD System - Migrate AS400 to Pegasus at PCB site)
Meeting at on-site Kittisak Isarapongporn
20:00 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Develop UI Interface. Taweesak Prumvised
20:00 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.50 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Fixed and testing. Taweesak Prumvised
19:59 THAI METALTECH CO., LTD. 1.50 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
18:45 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Installation at Thai Stanley Electric Public Company Limited Priroj Neamjarn
18:45 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Installation at Thai Stanley Electric Public Company Limited Priroj Neamjarn
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #706 (Closed): Demo Develop HT Software for Scan data and Receive weight data.)
Develop HT Software for Scan data and Receive weight data. Kamol Anekchatnuntakool
08:13 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
ASI site survey about table stand label printer Konlawat Saechee
08:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
MATTO Weighting machine communication test Konlawat Saechee

03 Sep 2024

17:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #707 (Closed): Modify Webpegasus.)
Fix Inbound inquiry,Outbound Inquiry And Fix data show in Outbound History And Search Outbound History Ronnagon Kongsuwan
17:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #707 (Closed): Modify Webpegasus.)
Developed Page Production Inbound,Production Outbound In menu Inbound and Outbound Ronnagon Kongsuwan
17:26 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Develop Install Web and Mastermanagement Location, Supplier Department Import export add manual. Ronnagon Kongsuwan
17:23 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Develop And Testing Production with client and fix bug, . Ronnagon Kongsuwan
17:21 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Fix bug import bom no location and fix bug location master Ronnagon Kongsuwan
17:19 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Internal Meeting pegasus web permission. Ronnagon Kongsuwan
17:05 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Internal Meeting pegasus web permission. Taweesak Prumvised
17:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 7.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop outbound shipping. Taweesak Prumvised
16:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #706 (Closed): Demo Develop HT Software for Scan data and Receive weight data.)
Develop HT Software for Scan data and Receive weight data. Kamol Anekchatnuntakool
16:46 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Create manual Priroj Neamjarn
16:46 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Create manual Priroj Neamjarn

02 Sep 2024

19:00 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Support and fixed after user test function. Taweesak Prumvised
18:59 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Meeting and learning hercules software. Taweesak Prumvised
18:57 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop outbound function. Taweesak Prumvised
17:30 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 5.00 hours (Project progress work #658 (Closed): Documents and design)
Update spec document to version3 Kittisak Isarapongporn
17:29 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 1.00 hour (Project progress work #658 (Closed): Documents and design)
Preparing punchlist report rev1 Kittisak Isarapongporn
00:50 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 2.00 hours (Project progress work #658 (Closed): Documents and design)
Meeting with ERP at online #3 Kittisak Isarapongporn
17:27 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Check and fix the incorrect data from racing condition problem on OUTER PACKING STEP3 of Handy Kittisak Isarapongporn
00:44 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Support and check the problem from user Kittisak Isarapongporn
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:36 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create report pdf file Priroj Neamjarn
16:35 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create report pdf file Priroj Neamjarn
09:30 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
site survey (table stand label printer) Konlawat Saechee
09:29 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
09:29 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
09:28 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
Weighting machine communication test at site Konlawat Saechee
00:56 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Check more details regarding to new requirements from user Kittisak Isarapongporn
00:46 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:46 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Check master data Kittisak Isarapongporn
00:44 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
00:48 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Internal meeting about HT spec Kittisak Isarapongporn
00:41 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #671 (In Progress): [Meeting] Interview and other)
Interview Kittisak Isarapongporn
00:39 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #671 (In Progress): [Meeting] Interview and other)
Meeting about work handover of K.Pam Kittisak Isarapongporn
00:34 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
take photo and meeting at office Kittisak Isarapongporn
00:36 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Internal meeting about assign web Kittisak Isarapongporn

01 Sep 2024

14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
estimate time for this project and start create new project on android studio Soraya Norasing
14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Review the report details with customer and myself and meet with K. Pam to make corrections. Soraya Norasing
14:23 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Check and fix the problem. Tablet does not show the latest updated magic card file. Soraya Norasing
14:18 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Check the staging function. meiji card can't show. The problem is caused by using the wrong model data table. Change ... Soraya Norasing
14:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting about Asprova at NTPT. and modify form give to user Soraya Norasing
14:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Modify Asprova system Specifications Documentation Soraya Norasing
14:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Soraya Norasing

30 Aug 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
Modify HT Stock Software. Kamol Anekchatnuntakool
16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Install the system for users to test, create report Priroj Neamjarn
16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Install the system for users to test, create report Priroj Neamjarn
 