Activity
From 25 Aug 2024 to 03 Sep 2024
03 Sep 2024
- 17:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #707 (Closed): Modify Webpegasus.)
- Fix Inbound inquiry,Outbound Inquiry And Fix data show in Outbound History And Search Outbound History
- 17:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #707 (Closed): Modify Webpegasus.)
- Developed Page Production Inbound,Production Outbound In menu Inbound and Outbound
- 17:26 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Develop Install Web and Mastermanagement Location, Supplier Department Import export add manual.
- 17:23 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Develop And Testing Production with client and fix bug, .
- 17:21 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Fix bug import bom no location and fix bug location master
- 17:19 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Internal Meeting pegasus web permission.
- 17:05 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Internal Meeting pegasus web permission.
- 17:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 7.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Develop outbound shipping.
- 16:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #706 (Closed): Demo Develop HT Software for Scan data and Receive weight data.)
- Develop HT Software for Scan data and Receive weight data.
- 16:46 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Create manual
- 16:46 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Create manual
02 Sep 2024
- 19:00 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Support and fixed after user test function.
- 18:59 HAMADEN MEXICO S.A.DE C.V 2.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Meeting and learning hercules software.
- 18:57 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Develop outbound function.
- 17:30 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 5.00 hours (Project progress work #658 (Closed): Documents and design)
- Update spec document to version3
- 17:29 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 1.00 hour (Project progress work #658 (Closed): Documents and design)
- Preparing punchlist report rev1
- 00:50 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 2.00 hours (Project progress work #658 (Closed): Documents and design)
- Meeting with ERP at online #3
- 17:27 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Check and fix the incorrect data from racing condition problem on OUTER PACKING STEP3 of Handy
- 00:44 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Support and check the problem from user
- 16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:36 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- create report pdf file
- 16:35 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- create report pdf file
- 09:30 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
- site survey (table stand label printer)
- 09:29 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 09:29 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 09:28 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
- Weighting machine communication test at site
- 00:56 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- Check more details regarding to new requirements from user
- 00:46 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- 00:46 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- Check master data
- 00:44 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- 00:48 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
- Internal meeting about HT spec
- 00:41 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #671 (In Progress): [Meeting] Interview and other)
- Interview
- 00:39 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #671 (In Progress): [Meeting] Interview and other)
- Meeting about work handover of K.Pam
- 00:34 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
- take photo and meeting at office
- 00:36 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Internal meeting about assign web
01 Sep 2024
- 14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- estimate time for this project and start create new project on android studio
- 14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Review the report details with customer and myself and meet with K. Pam to make corrections.
- 14:23 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- Check and fix the problem. Tablet does not show the latest updated magic card file.
- 14:18 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- Check the staging function. meiji card can't show. The problem is caused by using the wrong model data table. Change ...
- 14:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- meeting about Asprova at NTPT. and modify form give to user
- 14:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Modify Asprova system Specifications Documentation
- 14:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #674 (Closed): [Installation]Process Control System phase2)
30 Aug 2024
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
- Modify HT Stock Software.
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Install the system for users to test, create report
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Install the system for users to test, create report
29 Aug 2024
- 17:14 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 7.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Add inboung function of api and handy.
- 07:38 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Add web api of inbound.
- 17:13 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Testing outbound fglotsize and delivery.
- 07:38 THAI METALTECH CO., LTD. 6.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Testing and fixed outbound delivery.
- 16:58 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
- Modify HT Stock Software.
- 16:53 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- create report
- 16:53 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- create report
- 14:09 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #703 (Closed): Make The User Manual)
- 14:09 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #703 (Closed): Make The User Manual)
- 14:02 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 14:02 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 12:48 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Install Setting Web pegasus version 2.
- 12:47 THAI METALTECH CO., LTD. 6.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Testing and fixing outbound delivery with HT and presenting to the customer.
28 Aug 2024
- 16:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:44 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
- Meeting whit customer for new request
- 14:39 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
- Meeting whit customer for new request & test report
- 14:36 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
- Installation&On-site support
- 16:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- 1.coding xr chart 2.Adjust UI of tablet
- 16:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- 1.coding xr chart 2.Adjust UI of tablet
- 14:49 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- check data outer packing (The customer reported that the status color did not change.)
- 14:47 TOMAS TECH CO., LTD. 6.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- take photo at office
- 14:38 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Internal meeting with K.Nack about YAMATO Project
- 14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 14:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 14:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 14:42 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- 14:09 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify DB trigger about user name and report
- 14:06 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #652 (Closed): System support and maintenance)
- Modify repack label function (cont.)
- 14:04 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 3.00 hours (Project progress work #658 (Closed): Documents and design)
- Meeting on-line #2
- 13:54 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- Try to generate the production schedule and check the item master
27 Aug 2024
- 18:21 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Edit condition FGLotsize, SDI, Outbound delivery.
- 08:04 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Edit condition of outbound delivery function.
- 18:20 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Design inbound schedule data.
- 17:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 1.00 hour (Project progress work #470 (Closed): Packing List System)
- 17:02 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Outbound delivery for Pegasus 1, added functionality to Pegasus 2, and fixed a bug in the supplier master p...
- 16:52 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
- Modify HT Stock Software.
- 16:51 OTICS (THAILAND) CO., LTD. 16.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Setup a remote dashboard
- 09:30 YAMATO ELECTRIC (THAILAND) CO., LTD. 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Update spec and punchlist report
- 09:28 YAMATO ELECTRIC (THAILAND) CO., LTD. 3.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 09:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
26 Aug 2024
- 20:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and tested the outbound delivery process for real manufacturing operations.
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:57 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:57 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
Also available in: Atom