From 20 Aug 2024 to 29 Aug 2024

29 Aug 2024

17:14 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 7.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Add inboung function of api and handy. Taweesak Prumvised
07:38 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Add web api of inbound. Taweesak Prumvised
17:13 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Testing outbound fglotsize and delivery. Taweesak Prumvised
07:38 THAI METALTECH CO., LTD. 6.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Testing and fixed outbound delivery. Taweesak Prumvised
16:58 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
Modify HT Stock Software. Kamol Anekchatnuntakool
16:53 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create report Priroj Neamjarn
16:53 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create report Priroj Neamjarn
14:09 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #703 (Closed): Make The User Manual)
Teeradon Yuensakul
14:09 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #703 (Closed): Make The User Manual)
Teeradon Yuensakul
14:02 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
14:02 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
12:48 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Install Setting Web pegasus version 2. Ronnagon Kongsuwan
12:47 THAI METALTECH CO., LTD. 6.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Testing and fixing outbound delivery with HT and presenting to the customer. Ronnagon Kongsuwan

28 Aug 2024

16:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:44 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Meeting whit customer for new request Soraya Norasing
14:39 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Meeting whit customer for new request & test report Soraya Norasing
14:36 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Installation&On-site support Soraya Norasing
16:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
1.coding xr chart 2.Adjust UI of tablet Priroj Neamjarn
16:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
1.coding xr chart 2.Adjust UI of tablet Priroj Neamjarn
14:49 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
check data outer packing (The customer reported that the status color did not change.) Soraya Norasing
14:47 TOMAS TECH CO., LTD. 6.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
take photo at office Soraya Norasing
14:38 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal meeting with K.Nack about YAMATO Project Soraya Norasing
14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
14:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
14:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
14:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
14:42 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Jidapha Mangkhachot
14:09 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify DB trigger about user name and report Kittisak Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #652 (Closed): System support and maintenance)
Modify repack label function (cont.) Kittisak Isarapongporn
14:04 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 3.00 hours (Project progress work #658 (Closed): Documents and design)
Meeting on-line #2 Kittisak Isarapongporn
13:54 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Try to generate the production schedule and check the item master Kittisak Isarapongporn

27 Aug 2024

18:21 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Edit condition FGLotsize, SDI, Outbound delivery. Taweesak Prumvised
08:04 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Edit condition of outbound delivery function. Taweesak Prumvised
18:20 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Design inbound schedule data. Taweesak Prumvised
17:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 1.00 hour (Project progress work #470 (Closed): Packing List System)
Jidapha Mangkhachot
17:02 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Outbound delivery for Pegasus 1, added functionality to Pegasus 2, and fixed a bug in the supplier master p... Ronnagon Kongsuwan
16:52 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn
16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
Modify HT Stock Software. Kamol Anekchatnuntakool
16:51 OTICS (THAILAND) CO., LTD. 16.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Setup a remote dashboard Worawit Khantamool
09:30 YAMATO ELECTRIC (THAILAND) CO., LTD. 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Update spec and punchlist report Kittisak Isarapongporn
09:28 YAMATO ELECTRIC (THAILAND) CO., LTD. 3.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
09:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Kittisak Isarapongporn
08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul

26 Aug 2024

20:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and tested the outbound delivery process for real manufacturing operations. Ronnagon Kongsuwan
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:57 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:57 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn
16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn

24 Aug 2024

23:22 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
add detail filter in Inbound Schedule Production Worawit Khantamool
17:40 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Edit flow of outbound delivery. Taweesak Prumvised
15:37 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Fixed after installation software on site day 3. Taweesak Prumvised
15:37 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Fixed after installation software on site. Taweesak Prumvised
15:36 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Installation software on site. Taweesak Prumvised
17:27 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Modify the outbound delivery code to include item production verification before releasing from the production line. Ronnagon Kongsuwan
17:25 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Consult with the client and test to adjust certain functions to align with real-world requirements. Ronnagon Kongsuwan
17:24 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Test the designed function and fix bugs related to CSV import and export on the local server. Ronnagon Kongsuwan
17:21 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Install Web Server Pegasus Phase1 Ronnagon Kongsuwan
17:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:30 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #701 (Closed): [Area3] Site survey)
Survey area install camera Phatthadon Inthachot
16:30 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #701 (Closed): [Area3] Site survey)
test camera Phatthadon Inthachot
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Import master data to database -coding xr chart Priroj Neamjarn
16:25 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Priroj Neamjarn
16:24 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
installation Phatthadon Inthachot
16:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #700 (Closed): PR Electrical part )
PR Electrical part list Phatthadon Inthachot
16:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
12:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT-STEP-Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
11:22 TOMAS TECH CO., LTD. 8.00 hours (Sales support #684 (Closed): HAMASHO AMR Concept)
Survey area for AMR Phatthadon Inthachot

23 Aug 2024

17:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 2.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs order no save to database Jidapha Mangkhachot
17:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:25 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
17:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Zen not conneting database Jidapha Mangkhachot
17:06 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Edit data retrieval Worawit Khantamool
17:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:51 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
PR Electrical part list Phatthadon Inthachot
16:51 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
PR Electrical part list Phatthadon Inthachot
16:51 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
PR Electrical part list Phatthadon Inthachot
16:50 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
PR Electrical part list Phatthadon Inthachot
16:37 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Support installation Phatthadon Inthachot
16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
Drawing EE Phatthadon Inthachot
16:14 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn
16:14 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
coding xr chart Priroj Neamjarn

22 Aug 2024

17:03 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
Remote troubleshoot error codes Worawit Khantamool
16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix bug receive log data Priroj Neamjarn
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Fix bug receive log data Priroj Neamjarn

21 Aug 2024

23:48 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #652 (Closed): System support and maintenance)
Modify repack label function Kittisak Isarapongporn
23:47 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Check and fix the missing order no from DAYUNIT Kittisak Isarapongporn
23:45 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Problem-Bug #638 (Closed): Support fix the data)
Fix the double return qty problem when cancel the outbound and cancel the duplicated outbound Kittisak Isarapongporn
23:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Modify spec rev5 Kittisak Isarapongporn
23:43 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Describe the handy function spec Kittisak Isarapongporn
16:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Yearly monthly bar chart display (100%), - Monthly daily bar chart display (100%),... Worawit Khantamool
16:40 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Import master data to database Priroj Neamjarn
16:39 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Import master data to database Priroj Neamjarn
05:22 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Final test on the web and handy presentation with the client, and bug fixing. Ronnagon Kongsuwan
05:20 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Internal test with handy and fix bug Ronnagon Kongsuwan

20 Aug 2024

17:03 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Testing and meeting present with TMC. Taweesak Prumvised
16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Weekly cost bar chart display (100%), - Daily cost bar chart display (100%) Worawit Khantamool
16:49 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Installation Priroj Neamjarn
16:49 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Installation Priroj Neamjarn
16:48 AIKAI LOGISTICS (THAILAND) CO., LTD 4.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
Installation Priroj Neamjarn
16:48 AIKAI LOGISTICS (THAILAND) CO., LTD 4.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
Installation Priroj Neamjarn
00:38 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Check master and enter order sales data for planning Kittisak Isarapongporn
00:36 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Release specification revision 2 Kittisak Isarapongporn
 