Activity
From 18 Aug 2024 to 27 Aug 2024
27 Aug 2024
- 18:21 THAI METALTECH CO., LTD. 1.00 hour (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Edit condition FGLotsize, SDI, Outbound delivery.
- 08:04 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Edit condition of outbound delivery function.
- 18:20 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Design inbound schedule data.
- 17:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 1.00 hour (Project progress work #470 (Closed): Packing List System)
- 17:02 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Outbound delivery for Pegasus 1, added functionality to Pegasus 2, and fixed a bug in the supplier master p...
- 16:52 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #702 (Closed): Modify HT Stock Software.)
- Modify HT Stock Software.
- 16:51 OTICS (THAILAND) CO., LTD. 16.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Setup a remote dashboard
- 09:30 YAMATO ELECTRIC (THAILAND) CO., LTD. 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Update spec and punchlist report
- 09:28 YAMATO ELECTRIC (THAILAND) CO., LTD. 3.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 09:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 08:16 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
26 Aug 2024
- 20:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and tested the outbound delivery process for real manufacturing operations.
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:58 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:57 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:57 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #675 (Closed): Program Testing)
- 16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
24 Aug 2024
- 23:22 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
- add detail filter in Inbound Schedule Production
- 17:40 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Edit flow of outbound delivery.
- 15:37 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Fixed after installation software on site day 3.
- 15:37 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Fixed after installation software on site.
- 15:36 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Installation software on site.
- 17:27 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Modify the outbound delivery code to include item production verification before releasing from the production line.
- 17:25 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Consult with the client and test to adjust certain functions to align with real-world requirements.
- 17:24 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Test the designed function and fix bugs related to CSV import and export on the local server.
- 17:21 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Install Web Server Pegasus Phase1
- 17:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:30 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #701 (Closed): [Area3] Site survey)
- Survey area install camera
- 16:30 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #701 (Closed): [Area3] Site survey)
- test camera
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- -Import master data to database -coding xr chart
- 16:25 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- 16:24 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
- installation
- 16:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #700 (Closed): PR Electrical part )
- PR Electrical part list
- 16:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
- Drawing EE
- 16:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
- Drawing EE
- 16:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
- Drawing EE
- 12:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT-STEP-Operation test confirmation/Specification creation 1/29
- 11:22 TOMAS TECH CO., LTD. 8.00 hours (Sales support #684 (Closed): HAMASHO AMR Concept)
- Survey area for AMR
23 Aug 2024
- 17:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 2.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs order no save to database
- 17:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:25 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- fix program bugs report
- 17:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
- Zen not conneting database
- 17:06 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Edit data retrieval
- 17:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:51 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 16:51 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 16:51 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 16:50 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 16:37 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
- Support installation
- 16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 16:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 16:14 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
- 16:14 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- coding xr chart
22 Aug 2024
- 17:03 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
- Remote troubleshoot error codes
- 16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Fix bug receive log data
- 16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Fix bug receive log data
21 Aug 2024
- 23:48 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #652 (Closed): System support and maintenance)
- Modify repack label function
- 23:47 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Check and fix the missing order no from DAYUNIT
- 23:45 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Problem-Bug #638 (Closed): Support fix the data)
- Fix the double return qty problem when cancel the outbound and cancel the duplicated outbound
- 23:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Modify spec rev5
- 23:43 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Describe the handy function spec
- 16:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Pull data from DB into Dashboard - Yearly monthly bar chart display (100%), - Monthly daily bar chart display (100%),...
- 16:40 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Import master data to database
- 16:39 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Import master data to database
- 05:22 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Final test on the web and handy presentation with the client, and bug fixing.
- 05:20 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Internal test with handy and fix bug
20 Aug 2024
- 17:03 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Testing and meeting present with TMC.
- 16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Pull data from DB into Dashboard - Weekly cost bar chart display (100%), - Daily cost bar chart display (100%)
- 16:49 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Installation
- 16:49 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- Installation
- 16:48 AIKAI LOGISTICS (THAILAND) CO., LTD 4.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- Installation
- 16:48 AIKAI LOGISTICS (THAILAND) CO., LTD 4.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- Installation
- 00:38 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- Check master and enter order sales data for planning
- 00:36 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
- Release specification revision 2
19 Aug 2024
- 18:22 HAMADEN MEXICO S.A.DE C.V 1.00 hour (Project progress work #694 (Closed): [Development] Software design and development)
- Kick-off meeting and PLC data meeting. 5%.
- 17:34 THAI METALTECH CO., LTD. 7.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Meeting and testing.
- 17:22 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- 17:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 5.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
- 17:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
- 17:17 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
- #Schedule - Production Assembly Fg(100%), - Production Assembly Sdi(100%), - Parts Request(100%), - Schedule Import(1...
- 16:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:39 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- make manual and installation
- 16:34 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- make manual and installation
- 16:34 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
- make manual and installation
- 14:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
- Weighting machine communication test at site
- 14:57 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
- FTS HMI design
- 14:57 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
- FTS HMI design
- 14:54 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
- Fix the LAN cable
- 08:17 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Check dashboard error problem
- 08:16 YAMATO ELECTRIC (THAILAND) CO., LTD. 5.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)