Project

General

Profile

Activity

From 12 Aug 2024 to 21 Aug 2024

21 Aug 2024

23:48 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #652 (Closed): System support and maintenance)
Modify repack label function Kittisak Isarapongporn
23:47 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Check and fix the missing order no from DAYUNIT Kittisak Isarapongporn
23:45 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Problem-Bug #638 (Closed): Support fix the data)
Fix the double return qty problem when cancel the outbound and cancel the duplicated outbound Kittisak Isarapongporn
23:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Modify spec rev5 Kittisak Isarapongporn
23:43 YAMATO ELECTRIC (THAILAND) CO., LTD. 2.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Describe the handy function spec Kittisak Isarapongporn
16:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Yearly monthly bar chart display (100%), - Monthly daily bar chart display (100%),... Worawit Khantamool
16:40 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Import master data to database Priroj Neamjarn
16:39 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Import master data to database Priroj Neamjarn
05:22 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Final test on the web and handy presentation with the client, and bug fixing. Ronnagon Kongsuwan
05:20 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Internal test with handy and fix bug Ronnagon Kongsuwan

20 Aug 2024

17:03 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Testing and meeting present with TMC. Taweesak Prumvised
16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:59 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Weekly cost bar chart display (100%), - Daily cost bar chart display (100%) Worawit Khantamool
16:49 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Installation Priroj Neamjarn
16:49 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Installation Priroj Neamjarn
16:48 AIKAI LOGISTICS (THAILAND) CO., LTD 4.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
Installation Priroj Neamjarn
16:48 AIKAI LOGISTICS (THAILAND) CO., LTD 4.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
Installation Priroj Neamjarn
00:38 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Check master and enter order sales data for planning Kittisak Isarapongporn
00:36 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Release specification revision 2 Kittisak Isarapongporn

19 Aug 2024

18:22 HAMADEN MEXICO S.A.DE C.V 1.00 hour (Project progress work #694 (Closed): [Development] Software design and development)
Kick-off meeting and PLC data meeting. 5%. Taweesak Prumvised
17:34 THAI METALTECH CO., LTD. 7.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
17:22 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Jidapha Mangkhachot
17:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 5.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Jidapha Mangkhachot
17:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Jidapha Mangkhachot
17:17 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Production Assembly Fg(100%), - Production Assembly Sdi(100%), - Parts Request(100%), - Schedule Import(1... Worawit Khantamool
16:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:39 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
make manual and installation Priroj Neamjarn
16:34 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
make manual and installation Priroj Neamjarn
16:34 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
make manual and installation Priroj Neamjarn
14:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
Weighting machine communication test at site Konlawat Saechee
14:57 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
FTS HMI design Konlawat Saechee
14:57 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
FTS HMI design Konlawat Saechee
14:54 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
Fix the LAN cable Konlawat Saechee
08:17 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Check dashboard error problem Kittisak Isarapongporn
08:16 YAMATO ELECTRIC (THAILAND) CO., LTD. 5.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn

16 Aug 2024

17:56 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
07:44 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Test and fixed outbound and lotsize function. Taweesak Prumvised
17:16 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
Edit and add information on web pages Worawit Khantamool
17:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #690 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints Thiraporn Amornsirinukorh
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Unit Test ,Fix bug Priroj Neamjarn
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Unit Test ,Fix bug Priroj Neamjarn
16:36 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Production PartRequest And Test Inbound Production cut material in bom type lotsize and production sdi Ronnagon Kongsuwan
16:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Production Bom Fg,SDI,FG and SDI Test Outbound delivery Ronnagon Kongsuwan
09:20 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Jidapha Mangkhachot
09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 5.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Jidapha Mangkhachot
07:49 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Meeting and design db. Taweesak Prumvised

15 Aug 2024

17:07 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Monthly cost bar chart display (100%) Worawit Khantamool
16:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:35 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding export dashboard Priroj Neamjarn
16:35 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding export dashboard Priroj Neamjarn
14:45 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Test and fixed bug Outbound delivery Ronnagon Kongsuwan
14:44 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting with tmc finish design bom and preview web pegasus Ronnagon Kongsuwan
14:37 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix the SQL of staging CSV report Kittisak Isarapongporn
14:36 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 1.00 hour (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Kittisak Isarapongporn
14:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Soraya Norasing
14:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Installation&On-site support Soraya Norasing
14:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Installation&On-site support Soraya Norasing
14:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
test and fix bug program on handy Soraya Norasing
13:20 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints Thiraporn Amornsirinukorh
13:19 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints / meeting Thiraporn Amornsirinukorh
13:19 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints inbound / outbound / loadlist Thiraporn Amornsirinukorh
13:18 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
moring meeting / evening meeting / main menu dev Thiraporn Amornsirinukorh
10:23 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 5.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop inbound add api and add scan label funtion. Taweesak Prumvised
10:21 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Test outbound delivery and meeting with TMC. Taweesak Prumvised

14 Aug 2024

21:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
20:27 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Monthly cost bar chart display (11%) Worawit Khantamool
20:19 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Outbound Schedule Detail (100%) Worawit Khantamool
16:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
07:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:44 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
export csv, export dashboard Priroj Neamjarn
16:44 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
export csv, export dashboard Priroj Neamjarn
16:12 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Inbound Schedule Production SDI - Outbound Material By Bom Test Delivery Outbound Schedule Ronnagon Kongsuwan
01:05 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Meeting about spec rev1 present at online Kittisak Isarapongporn
01:03 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
Meeting at on-site Kittisak Isarapongporn

13 Aug 2024

20:21 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop. Taweesak Prumvised
20:19 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
17:50 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule -inbound material detail (Edit data extraction), - inbound production (total actual and can now be displaye... Worawit Khantamool
17:20 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Jidapha Mangkhachot
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
09:12 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Inbound Schedule Production Fg - Outbound Material By Bom Ronnagon Kongsuwan
08:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
Sick leave Jidapha Mangkhachot
02:10 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
Prepare spec rev1 Kittisak Isarapongporn
02:07 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify DB triggers add collect function for user name and shift Kittisak Isarapongporn
 

Also available in: Atom