From 08 Aug 2024 to 17 Aug 2024

16 Aug 2024

17:56 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
07:44 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Test and fixed outbound and lotsize function. Taweesak Prumvised
17:16 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
Edit and add information on web pages Worawit Khantamool
17:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #690 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints Thiraporn Amornsirinukorh
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Unit Test ,Fix bug Priroj Neamjarn
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Unit Test ,Fix bug Priroj Neamjarn
16:36 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Production PartRequest And Test Inbound Production cut material in bom type lotsize and production sdi Ronnagon Kongsuwan
16:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Production Bom Fg,SDI,FG and SDI Test Outbound delivery Ronnagon Kongsuwan
09:20 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
fix program bugs report Jidapha Mangkhachot
09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Jidapha Mangkhachot
09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 5.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Jidapha Mangkhachot
07:49 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Meeting and design db. Taweesak Prumvised

15 Aug 2024

17:07 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Monthly cost bar chart display (100%) Worawit Khantamool
16:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:35 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding export dashboard Priroj Neamjarn
16:35 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding export dashboard Priroj Neamjarn
14:45 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Test and fixed bug Outbound delivery Ronnagon Kongsuwan
14:44 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting with tmc finish design bom and preview web pegasus Ronnagon Kongsuwan
14:37 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix the SQL of staging CSV report Kittisak Isarapongporn
14:36 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 1.00 hour (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Kittisak Isarapongporn
14:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Soraya Norasing
14:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Installation&On-site support Soraya Norasing
14:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
Installation&On-site support Soraya Norasing
14:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
test and fix bug program on handy Soraya Norasing
13:20 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints Thiraporn Amornsirinukorh
13:19 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints / meeting Thiraporn Amornsirinukorh
13:19 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints inbound / outbound / loadlist Thiraporn Amornsirinukorh
13:18 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
moring meeting / evening meeting / main menu dev Thiraporn Amornsirinukorh
10:23 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 5.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop inbound add api and add scan label funtion. Taweesak Prumvised
10:21 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Test outbound delivery and meeting with TMC. Taweesak Prumvised

14 Aug 2024

21:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
20:27 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
Pull data from DB into Dashboard - Monthly cost bar chart display (11%) Worawit Khantamool
20:19 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Outbound Schedule Detail (100%) Worawit Khantamool
16:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
07:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:44 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
export csv, export dashboard Priroj Neamjarn
16:44 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
export csv, export dashboard Priroj Neamjarn
16:12 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Inbound Schedule Production SDI - Outbound Material By Bom Test Delivery Outbound Schedule Ronnagon Kongsuwan
01:05 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Meeting about spec rev1 present at online Kittisak Isarapongporn
01:03 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
Meeting at on-site Kittisak Isarapongporn

13 Aug 2024

20:21 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop. Taweesak Prumvised
20:19 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
17:50 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule -inbound material detail (Edit data extraction), - inbound production (total actual and can now be displaye... Worawit Khantamool
17:20 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Jidapha Mangkhachot
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
09:12 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Inbound Schedule Production Fg - Outbound Material By Bom Ronnagon Kongsuwan
08:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
Sick leave Jidapha Mangkhachot
02:10 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
Prepare spec rev1 Kittisak Isarapongporn
02:07 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify DB triggers add collect function for user name and shift Kittisak Isarapongporn

10 Aug 2024

17:40 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 3.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Design Taweesak Prumvised
17:39 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
17:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:31 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Pokayoke (100%) Worawit Khantamool
16:28 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:28 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
09:05 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
Memory design Konlawat Saechee
09:05 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
Memory design Konlawat Saechee
08:54 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
data extraction from machine at site with Keyence Konlawat Saechee
09:03 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
Video for presentation Konlawat Saechee
08:59 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
KUBOTA KS-C880-PR Konlawat Saechee
09:01 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #685 (Closed): Rack Server drawing design and Audio test)
Test Audio Converter (RCA to LAN) Konlawat Saechee
08:58 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #685 (Closed): Rack Server drawing design and Audio test)
3D Rack Server drawing Konlawat Saechee
08:53 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #685 (Closed): Rack Server drawing design and Audio test)
Meeting and make document Konlawat Saechee
08:56 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
Fix the LAN cable Konlawat Saechee

09 Aug 2024

21:09 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:09 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:47 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 6.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Development. Taweesak Prumvised
18:46 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and testing. Taweesak Prumvised
17:42 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed stored procedures for BOM in inbound to manage outbound material and fixed bugs in the inbound material PO ... Ronnagon Kongsuwan
17:40 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed table Bom Page Bom in master data Ronnagon Kongsuwan
17:00 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Master Management - Bill Of Materials (100%) Worawit Khantamool
16:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:43 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:34 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
trainning user (process : mold, dicer, app, classify) and meeting หummary of problems and additional solutions Soraya Norasing
16:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
trainning user (process : diebond, wirebond, boding check, mold) Soraya Norasing
16:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
1.meeting with customer about how to create qr format / support customer import data master 2.create new table and mo... Soraya Norasing
16:26 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
1.fix function Random check mold fix api and table 2.fix function random check dicer Soraya Norasing
16:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Soraya Norasing
16:21 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Soraya Norasing
15:02 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 1.00 hour (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Kittisak Isarapongporn
14:55 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify the trigger of transaction table to keep the user name and shift on INSERT action Kittisak Isarapongporn
14:26 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Add location conversion to DAYUNIT order number update script Kittisak Isarapongporn
14:52 NTPT COMPANY LIMITED. 3.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Install the asprova but found the problem about expired license. Kittisak Isarapongporn
14:50 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #652 (Closed): System support and maintenance)
Install and support the new HT firmware. Fix tag generator web page about item unit on repack function. Kittisak Isarapongporn
14:48 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #649 (Closed): [Meeting] Document and assignment)
Testing with K.Pump Kittisak Isarapongporn
14:30 YAMATO ELECTRIC (THAILAND) CO., LTD. 5.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
10:47 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
internal meeting with P'So about redmine/calendar Thiraporn Amornsirinukorh
10:44 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
bug fixed / testing / meeting for load list end point Thiraporn Amornsirinukorh
10:43 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
test / fixed / config / completed api Thiraporn Amornsirinukorh
10:43 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints inbound / outbound Thiraporn Amornsirinukorh
10:42 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
api linkage endpoints Thiraporn Amornsirinukorh
10:41 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
gantt chart/project created/meeting Thiraporn Amornsirinukorh
10:40 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
code reviewing / project planing / meeting Thiraporn Amornsirinukorh
10:38 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
moring meeting / evening meeting / pc installation Thiraporn Amornsirinukorh
08:08 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot

08 Aug 2024

18:46 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Meeting and develop. Taweesak Prumvised
17:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:55 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Outbound Schedule Delivery (100%) Worawit Khantamool
08:01 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Inbound Schedule Production (100%), Inbound Schedule Detail (100%) Worawit Khantamool
16:44 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:44 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding summary data Priroj Neamjarn
16:09 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Test Fix bug Function Inbound Schedule Material Ronnagon Kongsuwan
09:06 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
C# Application design Nattapol Poeam
09:05 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
C# Application design Nattapol Poeam
09:05 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #688 (Closed): [ Task ] Coding C# Transfer data PLC to DB)
DB and stored procedure design Nattapol Poeam
08:49 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #66 (Closed): [Area3]Camera control system)
Site survey about confirm postion camera Nattapol Poeam
08:46 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Fix data history water flow sensor Nattapol Poeam
 