From 29 Jul 2024 to 07 Aug 2024

07 Aug 2024

18:34 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Development. Taweesak Prumvised
16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:53 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #687 (Closed): Network Diagram)
Network drawing Phatthadon Inthachot
16:45 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed 3 Approved function schedule inbound permission generate pdf Ronnagon Kongsuwan
16:32 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:28 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding receive power meter log file Priroj Neamjarn
16:28 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding receive power meter log file Priroj Neamjarn
13:37 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
13:37 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
13:37 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
13:37 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
13:37 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
13:36 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul
13:36 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #675 (Closed): Program Testing)
Teeradon Yuensakul

06 Aug 2024

20:23 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #684 (Closed): HAMASHO AMR Concept)
Site survey Konlawat Saechee
20:22 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Development. Taweesak Prumvised
20:21 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and develop. Taweesak Prumvised
17:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:57 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Schedule - Inbound Schedule Production (95%) Worawit Khantamool
16:49 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding receive power meter log file Priroj Neamjarn
16:49 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding receive power meter log file Priroj Neamjarn
14:06 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed New Design Page Outbound Schedule Delivery Manual Generate New requirement client. Ronnagon Kongsuwan
14:04 Thai Metaltech Co.,Ltd 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Page Pokayoke Ui and table Ronnagon Kongsuwan
09:48 Nidec Techno Motor (Thailand) Co.,Ltd. 6.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
09:47 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Edit Report Jidapha Mangkhachot
09:47 Asian Stanley. International Limited 2.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Edit Report Jidapha Mangkhachot

05 Aug 2024

21:08 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
Assemble the weighing scale Konlawat Saechee
21:07 OTICS (Thailand) Co., Ltd. 4.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Buy Transformer at Ban Mo Plaza Konlawat Saechee
21:03 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
Memory design Konlawat Saechee
21:02 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
meeting Konlawat Saechee
20:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
KUBOTA KS-C880-PR Konlawat Saechee
20:43 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
KUBOTA KS-C880-PR Konlawat Saechee
21:00 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #683 (Closed): Raspberry Pi)
Test GPIO-DO Konlawat Saechee
20:32 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment machine Konlawat Saechee
19:55 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #652 (Closed): System support and maintenance)
Modify HT outbound function to support to scan the label tag that are not in the FIFO list. Kittisak Isarapongporn
06:56 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #652 (Closed): System support and maintenance)
Find and fix HT outbound function Kittisak Isarapongporn
16:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:43 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
#Schedule - Inbound Schedule Material Worawit Khantamool
16:31 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding receive power meter log file Priroj Neamjarn
16:31 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Coding receive power meter log file Priroj Neamjarn
16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Import master data to database Priroj Neamjarn
16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Import master data to database Priroj Neamjarn
10:45 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify the program on the handy according to the customer's new requirements. Soraya Norasing
10:44 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify the program on the handy according to the customer's new requirements. Soraya Norasing
00:52 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting with customer and trainning user (process : classify) Soraya Norasing
00:51 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting about new project and trainning user (process : dicer, app) Soraya Norasing
09:14 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #669 (Closed): Handy terminal stock management system.)
Installation&On-site support Arunwit Isarapongporn
09:13 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:09 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:02 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:02 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:02 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
08:59 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
08:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #682 (Closed): Create demo form Topre i-reporter)
Create demo form Topre i-reporter Arunwit Isarapongporn
09:12 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
09:12 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
09:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Installation&On-site support Arunwit Isarapongporn
08:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Installation&On-site support Arunwit Isarapongporn
09:08 ATA Casting Technology Co., Ltd. 8.00 hours (Project progress work #479 (Closed): [Coding]Pegasus search speed improvement)
Installation of WAMP on WEB server Arunwit Isarapongporn
09:06 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 8.00 hours (Parent project #557 (Closed): [PJ230059]Knuckle Line MC25&MC26 Traceability system mod)
Modify application about serial no. of part Line 25,26 and 27 Arunwit Isarapongporn
09:01 Siam Denso Manufacturing Co.,Ltd. 8.00 hours (Parent project #575 (Closed): [PJ230051]Duplicate data check system for add line MC23)
Support installation about modify time sequence of PLC judgment OK/NG Arunwit Isarapongporn
08:48 Siam Denso Manufacturing Co.,Ltd. 8.00 hours (Parent project #575 (Closed): [PJ230051]Duplicate data check system for add line MC23)
Remote monitor issue time sequence of PLC about Judgement OK/NG Arunwit Isarapongporn
08:44 Siam Denso Manufacturing Co.,Ltd. 8.00 hours (Parent project #575 (Closed): [PJ230051]Duplicate data check system for add line MC23)
Modify time sequence of PLC about judgement OK/NG Arunwit Isarapongporn
06:55 YAMATO ELECTRIC (THAILAND) CO.,LTD 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Modify spec rev3 Kittisak Isarapongporn
06:53 ASUTO GLOBAL LOGISTICS(Thailand) CO.LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Meeting and create the new DB, web path Kittisak Isarapongporn

02 Aug 2024

18:14 ASUTO GLOBAL LOGISTICS(Thailand) CO.LTD. 5.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Develop and meeting. Taweesak Prumvised
08:32 ASUTO GLOBAL LOGISTICS(Thailand) CO.LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Add inbound UI and meeting. Taweesak Prumvised
18:11 Thai Metaltech Co.,Ltd 3.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Update progress. Taweesak Prumvised
17:28 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Inbound - Inbound Inquiry / Report, # Outbound - Outbound Inquiry / Report Worawit Khantamool
17:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Document creation Jidapha Mangkhachot
17:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #663 (Closed): PICS - Specification creation)
Document creation Jidapha Mangkhachot
17:22 Asian Stanley. International Limited 6.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Process Control System Phase2 -C# Windows app installation Jidapha Mangkhachot
16:51 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #676 (Closed): Develop HT Software for scan TAG.)
Develop HT Software for scan TAG. Kamol Anekchatnuntakool
16:22 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Design Database/ Coding receive power meter log file Priroj Neamjarn
16:22 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Design Database/ Coding receive power meter log file Priroj Neamjarn
12:08 Thai Metaltech Co.,Ltd 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting progress web pegasus and new requirement bom with client. Ronnagon Kongsuwan
12:07 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Page Pokayoke. Ronnagon Kongsuwan

01 Aug 2024

22:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Install and debug program Nattapol Poeam
22:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Install and debug program Nattapol Poeam
22:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Install and debug program Nattapol Poeam
22:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Install and debug program Nattapol Poeam
22:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Debug program Nattapol Poeam
22:28 NTN Manufacturing(Thailand) Co., Ltd. 8.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Site survey factory sio3,soi6,pinthong Nattapol Poeam
16:52 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #676 (Closed): Develop HT Software for scan TAG.)
Develop HT Software for scan TAG. Kamol Anekchatnuntakool
16:44 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Test bit alarm and bit towerlight Konlawat Saechee
16:43 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Stock Management - Tag Label (100%) Worawit Khantamool
16:43 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #678 (Closed): LEGO )
find equipment @Mega Plaza Konlawat Saechee
16:41 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #680 (Closed): alpha - vision inspection)
Estimate cost Konlawat Saechee
16:40 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #680 (Closed): alpha - vision inspection)
Estimate cost Konlawat Saechee
16:38 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #680 (Closed): alpha - vision inspection)
3D design Konlawat Saechee
16:28 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Meeting of project, Create schedule plan Priroj Neamjarn
16:27 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #679 (Closed): Power meter monitoring)
Meeting of project , Create schedule plan Priroj Neamjarn
09:44 Asian Stanley. International Limited 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
-config ip handy, trainning user (process : wirebond, bonding check, mold) Soraya Norasing
09:42 Asian Stanley. International Limited 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
-update database and api, -setting handy, -trainning usert (process : diebond) Soraya Norasing

31 Jul 2024

17:58 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed the generation of PDF packing list pages for scheduled outbound deliveries. Ronnagon Kongsuwan
17:13 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 5.00 hours (Project progress work #669 (Closed): Handy terminal stock management system.)
Install HT Stock Software on Handy 2 Unit. Kamol Anekchatnuntakool
17:10 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #676 (Closed): Develop HT Software for scan TAG.)
Develop HT Software for scan TAG. Kamol Anekchatnuntakool
16:50 ASUTO GLOBAL LOGISTICS(Thailand) CO.LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Development. Taweesak Prumvised
16:44 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Stock Management - Stock Maintenance Inquiry / Report, Tag Label (50%) Worawit Khantamool
16:33 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Process Control System Phase2 -C# Windows app installation Jidapha Mangkhachot
16:32 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Process Control System phase2 installation Jidapha Mangkhachot
16:32 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Process Control System phase2 installation Jidapha Mangkhachot
16:31 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
16:31 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Kittisak Isarapongporn
16:11 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
-Internal Test, Create Package for install, Create user manual Priroj Neamjarn
16:10 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
-Internal Test, Create Package for install, Create user manual Priroj Neamjarn
09:36 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #678 (Closed): LEGO )
3D design Konlawat Saechee
09:23 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #677 (Closed): Weighing scale test (MATTO))
Receive items in Chonburi and Try using the basics. Konlawat Saechee
08:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 21/26 Thanthima Phaengkham
08:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 20/26 Thanthima Phaengkham
08:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 19/26 Thanthima Phaengkham
08:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 18/26 Thanthima Phaengkham
08:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 17/26 Thanthima Phaengkham
08:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 16/26 Thanthima Phaengkham
08:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 15/26 Thanthima Phaengkham
08:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 14/26 Thanthima Phaengkham
08:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 13/26 Thanthima Phaengkham
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 12/26 Thanthima Phaengkham
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 11/26 Thanthima Phaengkham
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 10/26 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 9/26 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 8/26 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 7/26 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 6/26 Thanthima Phaengkham
07:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 22/26 Thanthima Phaengkham
07:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 23/26 Thanthima Phaengkham
07:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 24/26 Thanthima Phaengkham
07:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 25/26 Thanthima Phaengkham
07:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 26/26 Thanthima Phaengkham
07:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 5/26 Thanthima Phaengkham
07:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 4/26 Thanthima Phaengkham
07:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 3/26 Thanthima Phaengkham
07:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 2/26 Thanthima Phaengkham

30 Jul 2024

18:21 ASUTO GLOBAL LOGISTICS(Thailand) CO.LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Spec. Taweesak Prumvised
16:56 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #676 (Closed): Develop HT Software for scan TAG.)
Develop HT Software for scan TAG. Kamol Anekchatnuntakool
16:50 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #652 (Closed): System support and maintenance)
Modify the web and outbound function for adjustment request Kittisak Isarapongporn
16:50 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #652 (Closed): System support and maintenance)
Kittisak Isarapongporn
16:41 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed manual generate schedule outbound delivery table. Ronnagon Kongsuwan
16:39 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed New Design Page Outbound Schedule Delivery Manual Generate New requirement client. Ronnagon Kongsuwan
16:31 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
Import, Export to pc Priroj Neamjarn
16:31 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
Import, Export to pc Priroj Neamjarn
08:46 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Teeradon Yuensakul

29 Jul 2024

15:49 Toyota Boshoku Filtration System (Thailand) Co.,Ltd 8.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
15:49 Toyota Boshoku Filtration System (Thailand) Co.,Ltd 8.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
 