18 Jul 2024

19:32 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Add outbound. Taweesak Prumvised
16:55 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
coding pokayoke 2-points,3-points,work history Priroj Neamjarn
16:55 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
coding pokayoke 2-points,3-points,work history Priroj Neamjarn
16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #651 (Closed): OTICS Dashboard in mast demo)
Collapse all dashboard pages into a single menu page. Worawit Khantamool
16:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
10:02 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed revision for PDF generation to include order number and perches order as per customer requirements. Ronnagon Kongsuwan
00:32 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
00:31 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
00:30 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot

17 Jul 2024

17:50 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Add Inbound lotsize and outbound. Taweesak Prumvised
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
16:45 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #651 (Closed): OTICS Dashboard in mast demo)
Edit Dashboard (request K'Ryo) Worawit Khantamool
16:43 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Master Management - Supplier Master Worawit Khantamool
16:35 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
coding pokayoke 2-points,pokayoke 3-points screen Priroj Neamjarn
16:35 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
coding pokayoke 2-points,pokayoke 3-points screen Priroj Neamjarn
16:32 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Export PDF Label Production Lot Size. Ronnagon Kongsuwan

16 Jul 2024

17:00 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Master Management - Location Master Worawit Khantamool
11:44 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
# Master Management - Item Master Worawit Khantamool
16:52 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Inbound material. Taweesak Prumvised
07:24 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Add API Outbound. Taweesak Prumvised
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #669 (Closed): Handy terminal stock management system.)
Revise HT Stock Software. Kamol Anekchatnuntakool
14:35 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
develop function bonding check condition scan ng Soraya Norasing
14:34 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
develop function bonding check condition caculate Soraya Norasing
10:25 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
coding login,main menu,pokayoke 2-points screen Priroj Neamjarn
10:25 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
coding login, main menu, pokayoke 2-points screen Priroj Neamjarn
08:55 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Import Delivery Schedule Pokayoke Ronnagon Kongsuwan

15 Jul 2024

22:57 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Soraya Norasing
16:46 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #669 (Closed): Handy terminal stock management system.)
Revise HT Stock Software. Kamol Anekchatnuntakool
16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Internal Test (100%) Priroj Neamjarn
16:29 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Internal Test (100%) Priroj Neamjarn
09:54 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Inbound delivery Note And Inbound Material PO Ronnagon Kongsuwan
09:24 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
09:24 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
09:23 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
09:22 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 14/14 Thanthima Phaengkham
08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 13/14 Thanthima Phaengkham
08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 12/14 Thanthima Phaengkham
08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 11/14 Thanthima Phaengkham
08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 10/14 Thanthima Phaengkham
08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS- Conversion and Documents Creation 9/14 Thanthima Phaengkham
07:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS- Conversion and Documents Creation 8/14 Thanthima Phaengkham
07:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 7/14 Thanthima Phaengkham

13 Jul 2024

22:20 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Will check and estimate the modification (move to use server side script) Worawit Khantamool
18:53 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Add data to inbound deliverynote. Taweesak Prumvised
16:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 3.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Internal test (60%) Priroj Neamjarn
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Internal test (60%) Priroj Neamjarn
14:05 YAMATO ELECTRIC (THAILAND) CO.,LTD 5.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Meeting at on-site Kittisak Isarapongporn
13:31 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Demo CCTV Konlawat Saechee
10:53 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Import Production Schedule SDI Ronnagon Kongsuwan

12 Jul 2024

18:38 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Inbound function. Taweesak Prumvised
16:51 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Item Master Information (backend) Worawit Khantamool
16:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (96%). Priroj Neamjarn
16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (96%) Priroj Neamjarn
16:07 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
PR Electrical part list Phatthadon Inthachot
15:53 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
PR Electrical part list Phatthadon Inthachot
15:46 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
PR Electrical part list Phatthadon Inthachot
15:45 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
PR Electrical part list Phatthadon Inthachot
15:50 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
Installation and Setting AP Phatthadon Inthachot
14:57 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
Installation and setting Access Point Konlawat Saechee
15:47 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #476 (Closed): [Area3]Camera control system)
Survey area install camera Phatthadon Inthachot
15:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Survey area install camera Phatthadon Inthachot
15:42 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Test Demo Camera Phatthadon Inthachot
15:41 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Survey Phatthadon Inthachot
14:59 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Demo CCTV Konlawat Saechee
15:42 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Teeradon Yuensakul
15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Teeradon Yuensakul
15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Teeradon Yuensakul
15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Teeradon Yuensakul
15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
programming PLC Teeradon Yuensakul
15:40 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
programming PLC Teeradon Yuensakul
14:55 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
Wiring and Setting HF2211 (232 to wifi) Konlawat Saechee
14:52 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Learning loss analyze Konlawat Saechee
14:47 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Learning loss analyze Konlawat Saechee
14:46 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Learning loss analyze Konlawat Saechee
14:50 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
Change flow meter Konlawat Saechee
14:44 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Meeting with K.Opas and setsubi team about summarize requirements Konlawat Saechee
01:12 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed additional client requirements for schedule_perchasorder_delivery and schedule_tag_supplier. Ronnagon Kongsuwan
01:11 Thai Metaltech Co.,Ltd 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Develop schedule_perchasorder_delivery and schedule_tag_supplier as per additional client requirements; currently wor... Ronnagon Kongsuwan
01:08 Thai Metaltech Co.,Ltd 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Attend meeting and gather additional requirements from the client. Ronnagon Kongsuwan

11 Jul 2024

22:19 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
fix api for function insert material, tool, job diebond. and modify font end diebond function and Describe the data t... Soraya Norasing
22:17 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
fix api for function insert material, tool, job wirebond. and modify font end wirebond function Soraya Norasing
22:16 Asian Stanley. International Limited 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
fix api for function insert material, tool, job mold. and modify font end mold function Soraya Norasing
21:54 Asian Stanley. International Limited 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Soraya Norasing
21:56 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
Asprova meeting with K.Ryo Soraya Norasing
21:55 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
Soraya Norasing
21:51 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Prepare a form to enter order information for customers. and meeting with customer at factory Soraya Norasing
21:49 Minebea AccessSolutions Thai Ltd 0.00 hour (Project progress work #462 (Closed): HT_MAST : Duplicate outbound bug)
Soraya Norasing
20:37 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
Onsite meeting about Andon project Nattapol Poeam
20:25 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
Management task and clear other document Nattapol Poeam
20:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Revised program section bekido,OEE formula Nattapol Poeam
20:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Revised program section weigth CT Nattapol Poeam
20:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #655 (Closed): [ Weekly work update meeting ] Minutes of Meeting IoT infrastructure system)
Meeting about update progress work Nattapol Poeam
20:27 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
Install sever and Access point Nattapol Poeam
20:27 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Make concept Nattapol Poeam
20:13 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Demo CCTV Nattapol Poeam
20:22 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
Change sensor Nattapol Poeam
17:06 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Inbound. Taweesak Prumvised
16:58 Tomas Tech Co.,Ltd. 16.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Supplier Master Information (Backend), Department Master (Backend) Worawit Khantamool
16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:49 Tomas Tech Co.,Ltd. 4.50 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 5.50 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Pre-Install HT Stock Software. Kamol Anekchatnuntakool
16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (95%) Priroj Neamjarn
16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (95%) Priroj Neamjarn

10 Jul 2024

18:20 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
18:20 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:06 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and develop Taweesak Prumvised
16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (95%) Priroj Neamjarn
16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (95%) Priroj Neamjarn
09:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Loss Analysis Package (PLC and HMI) Konlawat Saechee
09:22 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Loss Analysis Package Quick Start Guide Document Konlawat Saechee
09:21 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Loss Analysis Package Quick Start Guide Document Konlawat Saechee
08:08 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Export PDF Label Supplier Information download 3 files pdf in oneclick. Ronnagon Kongsuwan
08:07 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Export PDF Label Supplier Information. Ronnagon Kongsuwan

09 Jul 2024

21:52 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
21:52 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (92%) Priroj Neamjarn
16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (92%) Priroj Neamjarn
16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Supplier Master (Backend) (100%) Worawit Khantamool
16:50 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Stock function. Taweesak Prumvised
11:21 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Created API Document and meeting overall function. Taweesak Prumvised
16:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
 