Activity
From 09 Jul 2024 to 18 Jul 2024
18 Jul 2024
- 19:32 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add outbound.
- 16:55 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- coding pokayoke 2-points,3-points,work history
- 16:55 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- coding pokayoke 2-points,3-points,work history
- 16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #651 (Closed): OTICS Dashboard in mast demo)
- Collapse all dashboard pages into a single menu page.
- 16:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 10:02 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed revision for PDF generation to include order number and perches order as per customer requirements.
- 00:32 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 00:31 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 00:30 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
17 Jul 2024
- 17:50 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add Inbound lotsize and outbound.
- 16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
- Modify HT Software.
- 16:45 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #651 (Closed): OTICS Dashboard in mast demo)
- Edit Dashboard (request K'Ryo)
- 16:43 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
- # Master Management - Supplier Master
- 16:35 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- coding pokayoke 2-points,pokayoke 3-points screen
- 16:35 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- coding pokayoke 2-points,pokayoke 3-points screen
- 16:32 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Export PDF Label Production Lot Size.
16 Jul 2024
- 17:00 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
- # Master Management - Location Master
- 11:44 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #668 (Closed): Upgrade web interface)
- # Master Management - Item Master
- 16:52 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Inbound material.
- 07:24 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add API Outbound.
- 16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #669 (Closed): Handy terminal stock management system.)
- Revise HT Stock Software.
- 14:35 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- develop function bonding check condition scan ng
- 14:34 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- develop function bonding check condition caculate
- 10:25 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- coding login,main menu,pokayoke 2-points screen
- 10:25 AIKAI LOGISTICS (THAILAND) CO., LTD 8.00 hours (Project progress work #661 (Closed): [Colding] Handy terminal BT-A500 Java application)
- coding login, main menu, pokayoke 2-points screen
- 08:55 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Import Delivery Schedule Pokayoke
15 Jul 2024
- 22:57 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 16:46 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #669 (Closed): Handy terminal stock management system.)
- Revise HT Stock Software.
- 16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Internal Test (100%)
- 16:29 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Internal Test (100%)
- 09:54 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Inbound delivery Note And Inbound Material PO
- 09:24 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 09:24 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 09:23 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 09:22 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 08:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 14/14
- 08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 13/14
- 08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 12/14
- 08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 11/14
- 08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 10/14
- 08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS- Conversion and Documents Creation 9/14
- 07:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS- Conversion and Documents Creation 8/14
- 07:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 7/14
13 Jul 2024
- 22:20 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Will check and estimate the modification (move to use server side script)
- 18:53 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add data to inbound deliverynote.
- 16:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 3.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Internal test (60%)
- 16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Internal test (60%)
- 14:05 YAMATO ELECTRIC (THAILAND) CO.,LTD 5.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Meeting at on-site
- 13:31 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Demo CCTV
- 10:53 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Import Production Schedule SDI
12 Jul 2024
- 18:38 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Inbound function.
- 16:51 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Item Master Information (backend)
- 16:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (96%).
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (96%)
- 16:07 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:53 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:46 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:45 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:50 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Installation and Setting AP
- 14:57 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Installation and setting Access Point
- 15:47 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #476 (Closed): [Area3]Camera control system)
- Survey area install camera
- 15:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Survey area install camera
- 15:42 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Test Demo Camera
- 15:41 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Survey
- 14:59 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Demo CCTV
- 15:42 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 15:40 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 14:55 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- Wiring and Setting HF2211 (232 to wifi)
- 14:52 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Learning loss analyze
- 14:47 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Learning loss analyze
- 14:46 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Learning loss analyze
- 14:50 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
- Change flow meter
- 14:44 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Meeting with K.Opas and setsubi team about summarize requirements
- 01:12 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed additional client requirements for schedule_perchasorder_delivery and schedule_tag_supplier.
- 01:11 Thai Metaltech Co.,Ltd 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Develop schedule_perchasorder_delivery and schedule_tag_supplier as per additional client requirements; currently wor...
- 01:08 Thai Metaltech Co.,Ltd 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Attend meeting and gather additional requirements from the client.
11 Jul 2024
- 22:19 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- fix api for function insert material, tool, job diebond. and modify font end diebond function and Describe the data t...
- 22:17 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- fix api for function insert material, tool, job wirebond. and modify font end wirebond function
- 22:16 Asian Stanley. International Limited 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- fix api for function insert material, tool, job mold. and modify font end mold function
- 21:54 Asian Stanley. International Limited 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 21:56 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- Asprova meeting with K.Ryo
- 21:55 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- 21:51 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Prepare a form to enter order information for customers. and meeting with customer at factory
- 21:49 Minebea AccessSolutions Thai Ltd 0.00 hour (Project progress work #462 (Closed): HT_MAST : Duplicate outbound bug)
- 20:37 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Onsite meeting about Andon project
- 20:25 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Management task and clear other document
- 20:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Revised program section bekido,OEE formula
- 20:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Revised program section weigth CT
- 20:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #655 (Closed): [ Weekly work update meeting ] Minutes of Meeting IoT infrastructure system)
- Meeting about update progress work
- 20:27 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Install sever and Access point
- 20:27 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Make concept
- 20:13 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Demo CCTV
- 20:22 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
- Change sensor
- 17:06 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Inbound.
- 16:58 Tomas Tech Co.,Ltd. 16.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Supplier Master Information (Backend), Department Master (Backend)
- 16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:49 Tomas Tech Co.,Ltd. 4.50 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 5.50 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Pre-Install HT Stock Software.
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
10 Jul 2024
- 18:20 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 18:20 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 18:06 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Meeting and develop
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
- 09:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Loss Analysis Package (PLC and HMI)
- 09:22 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Loss Analysis Package Quick Start Guide Document
- 09:21 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Loss Analysis Package Quick Start Guide Document
- 08:08 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed Export PDF Label Supplier Information download 3 files pdf in oneclick.
- 08:07 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Export PDF Label Supplier Information.
09 Jul 2024
- 21:52 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 21:52 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (92%)
- 16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (92%)
- 16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Supplier Master (Backend) (100%)
- 16:50 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Stock function.
- 11:21 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Created API Document and meeting overall function.
- 16:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.