Activity
From 03 Jul 2024 to 12 Jul 2024
12 Jul 2024
- 18:38 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Inbound function.
- 16:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Item Master Information (backend)
- 16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (96%).
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (96%)
- 16:07 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:53 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:45 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- PR Electrical part list
- 15:50 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Installation and Setting AP
- 14:57 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Installation and setting Access Point
- 15:47 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #476 (Closed): [Area3]Camera control system)
- Survey area install camera
- 15:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Survey area install camera
- 15:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Test Demo Camera
- 15:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Survey
- 14:59 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Demo CCTV
- 15:42 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- 15:41 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 15:40 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 14:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- Wiring and Setting HF2211 (232 to wifi)
- 14:52 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Learning loss analyze
- 14:47 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Learning loss analyze
- 14:46 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Learning loss analyze
- 14:50 THAI NIPPON FOODS CO., LTD. 4.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
- Change flow meter
- 14:44 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Meeting with K.Opas and setsubi team about summarize requirements
- 01:12 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed additional client requirements for schedule_perchasorder_delivery and schedule_tag_supplier.
- 01:11 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Develop schedule_perchasorder_delivery and schedule_tag_supplier as per additional client requirements; currently wor...
- 01:08 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Attend meeting and gather additional requirements from the client.
11 Jul 2024
- 22:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- fix api for function insert material, tool, job diebond. and modify font end diebond function and Describe the data t...
- 22:17 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- fix api for function insert material, tool, job wirebond. and modify font end wirebond function
- 22:16 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- fix api for function insert material, tool, job mold. and modify font end mold function
- 21:54 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 21:56 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- Asprova meeting with K.Ryo
- 21:55 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- 21:51 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Prepare a form to enter order information for customers. and meeting with customer at factory
- 21:49 MINEBEA ACCESSSOLUTIONS THAI LTD. 0.00 hour (Project progress work #462 (Closed): HT_MAST : Duplicate outbound bug)
- 20:37 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Onsite meeting about Andon project
- 20:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Management task and clear other document
- 20:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Revised program section bekido,OEE formula
- 20:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Revised program section weigth CT
- 20:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #655 (Closed): [ Weekly work update meeting ] Minutes of Meeting IoT infrastructure system)
- Meeting about update progress work
- 20:27 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Install sever and Access point
- 20:27 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Make concept
- 20:13 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Demo CCTV
- 20:22 THAI NIPPON FOODS CO., LTD. 4.00 hours (Problem-Bug #659 (Closed): water flow sensor error)
- Change sensor
- 17:06 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Inbound.
- 16:58 TOMAS TECH CO., LTD. 16.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Supplier Master Information (Backend), Department Master (Backend)
- 16:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:49 TOMAS TECH CO., LTD. 4.50 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 5.50 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Pre-Install HT Stock Software.
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
- 16:51 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
10 Jul 2024
- 18:20 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Report
- 18:20 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 18:06 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Meeting and develop
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (95%)
- 09:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Loss Analysis Package (PLC and HMI)
- 09:22 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Loss Analysis Package Quick Start Guide Document
- 09:21 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
- Loss Analysis Package Quick Start Guide Document
- 08:08 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed Export PDF Label Supplier Information download 3 files pdf in oneclick.
- 08:07 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Export PDF Label Supplier Information.
09 Jul 2024
- 21:52 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 21:52 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (92%)
- 16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (92%)
- 16:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Supplier Master (Backend) (100%)
- 16:50 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Stock function.
- 11:21 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Created API Document and meeting overall function.
- 16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
08 Jul 2024
- 17:15 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- MRP Factory master, Supplier Master (60%)
- 16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:35 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (90%)
- 16:34 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (90%)
- 07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 6/14
- 07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 5/14
- 07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 4/14
- 07:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 3/14
- 07:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 2/14
- 07:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [Task] LAT - CAPS - Conversion and Documents Creation 1/14
07 Jul 2024
- 23:28 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Support and fix the database store procedure
- 23:24 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- 23:26 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 5.00 hours (Project progress work #658 (Closed): Documents and design)
- 23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
- 23:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
05 Jul 2024
- 17:08 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add inbound items page.
- 07:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add API Inbound schedule coil.
- 17:03 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed Export PDF Delivery Note.
- 16:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Tag Label (Backend)
- 16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:34 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (85%)
- 16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (85%)
- 16:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 09:38 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- Test command to lock and unlock with Socket Protocol
- 08:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 08:45 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 08:45 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
04 Jul 2024
- 18:54 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 18:53 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 17:16 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Stock Maintenance Inquiry / Report (Backend), Inventory Linkage (Backend)
- 16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (82%)
- 16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (82%)
- 16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
- Demo Develop HT Software for Receive weight data and Send to Printer.
- 16:41 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed Export PDF Delivery Note.
- 16:41 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed Export PDF Purchase Order.
- 16:33 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:33 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:33 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:33 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 15:57 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- modify Process_Activity commom page for diebond wirebond mold process
03 Jul 2024
- 19:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- Enhance PDF storage and modify on tablet and internal test and test with customer
- 19:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- Enhance PDF storage and modify on tablet
- 17:16 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 17:16 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Stock Maintenance (Backend), Stocktaking (Backend)
- 16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #654 (Closed): Demo Develop HT Software for send to PCL.)
- Demo Develop HT Software for send to PCL.
- 16:37 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (80%)
- 16:36 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (80%)
- 15:52 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Develop and design a PDF export feature for perches orders and build an API for scheduling inbound tasks.
- 13:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Update program
- 13:15 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Management task
- 12:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Make concept CCTV and Access point installation
- 11:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Site survey about concern position CCTV
- 11:55 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #640 (Closed): Data loss analysis export)
- On-site for check recovery signal from machine
- 11:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #655 (Closed): [ Weekly work update meeting ] Minutes of Meeting IoT infrastructure system)
- Meeting IoT infrastructure system