10 Jul 2024

18:20 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Report Jidapha Mangkhachot
18:20 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:06 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Meeting and develop Taweesak Prumvised
16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (95%) Priroj Neamjarn
16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (95%) Priroj Neamjarn
09:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Loss Analysis Package (PLC and HMI) Konlawat Saechee
09:22 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Loss Analysis Package Quick Start Guide Document Konlawat Saechee
09:21 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #657 (Closed): Learning loss analyze)
Loss Analysis Package Quick Start Guide Document Konlawat Saechee
08:08 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Export PDF Label Supplier Information download 3 files pdf in oneclick. Ronnagon Kongsuwan
08:07 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Export PDF Label Supplier Information. Ronnagon Kongsuwan

09 Jul 2024

21:52 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
21:52 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (92%) Priroj Neamjarn
16:55 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (92%) Priroj Neamjarn
16:54 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Supplier Master (Backend) (100%) Worawit Khantamool
16:50 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Stock function. Taweesak Prumvised
11:21 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Created API Document and meeting overall function. Taweesak Prumvised
16:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool

08 Jul 2024

17:15 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
MRP Factory master, Supplier Master (60%) Worawit Khantamool
16:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:35 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (90%) Priroj Neamjarn
16:34 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (90%) Priroj Neamjarn
07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 6/14 Thanthima Phaengkham
07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 5/14 Thanthima Phaengkham
07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 4/14 Thanthima Phaengkham
07:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 3/14 Thanthima Phaengkham
07:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 2/14 Thanthima Phaengkham
07:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[Task] LAT - CAPS - Conversion and Documents Creation 1/14 Thanthima Phaengkham

07 Jul 2024

23:28 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Support and fix the database store procedure Kittisak Isarapongporn
23:24 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Kittisak Isarapongporn
23:26 Toyota Boshoku Filtration System (Thailand) Co.,Ltd 5.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn
23:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #653 (Closed): [Development] Software design and development)
Kittisak Isarapongporn

05 Jul 2024

17:08 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Add inbound items page. Taweesak Prumvised
07:34 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Add API Inbound schedule coil. Taweesak Prumvised
17:03 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Export PDF Delivery Note. Ronnagon Kongsuwan
16:50 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Tag Label (Backend) Worawit Khantamool
16:47 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:34 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (85%) Priroj Neamjarn
16:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (85%) Priroj Neamjarn
16:31 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot
09:38 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
Test command to lock and unlock with Socket Protocol Konlawat Saechee
08:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
08:45 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Installation&On-site support Arunwit Isarapongporn
08:45 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Installation&On-site support Arunwit Isarapongporn

04 Jul 2024

18:54 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot
18:53 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot
17:16 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Stock Maintenance Inquiry / Report (Backend), Inventory Linkage (Backend) Worawit Khantamool
16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (82%) Priroj Neamjarn
16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (82%) Priroj Neamjarn
16:47 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #656 (Closed): Demo Develop HT Software for Receive weight data and Send to Printer.)
Demo Develop HT Software for Receive weight data and Send to Printer. Kamol Anekchatnuntakool
16:41 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed Export PDF Delivery Note. Ronnagon Kongsuwan
16:41 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Developed and completed Export PDF Purchase Order. Ronnagon Kongsuwan
16:33 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
programming PLC Teeradon Yuensakul
16:33 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
programming PLC Teeradon Yuensakul
16:33 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
programming PLC Teeradon Yuensakul
16:33 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
programming PLC Teeradon Yuensakul
16:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
15:57 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
modify Process_Activity commom page for diebond wirebond mold process Soraya Norasing

03 Jul 2024

19:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Enhance PDF storage and modify on tablet and internal test and test with customer Soraya Norasing
19:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Enhance PDF storage and modify on tablet Soraya Norasing
17:16 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot
17:16 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot
16:47 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Stock Maintenance (Backend), Stocktaking (Backend) Worawit Khantamool
16:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #654 (Closed): Demo Develop HT Software for send to PCL.)
Demo Develop HT Software for send to PCL. Kamol Anekchatnuntakool
16:37 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (80%) Priroj Neamjarn
16:36 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (80%) Priroj Neamjarn
15:52 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Develop and design a PDF export feature for perches orders and build an API for scheduling inbound tasks. Ronnagon Kongsuwan
13:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Update program Nattapol Poeam
13:15 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
Management task Nattapol Poeam
12:00 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Make concept CCTV and Access point installation Nattapol Poeam
11:57 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
Site survey about concern position CCTV Nattapol Poeam
11:55 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #640 (Closed): Data loss analysis export)
On-site for check recovery signal from machine Nattapol Poeam
11:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #655 (Closed): [ Weekly work update meeting ] Minutes of Meeting IoT infrastructure system)
Meeting IoT infrastructure system Nattapol Poeam

02 Jul 2024

18:20 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Set API Inbound. Taweesak Prumvised
18:18 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Edit UI of Stock function. Taweesak Prumvised
17:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Outbound Inquiry / Report (Backend), Stock Inquiry / Report (Backend) Worawit Khantamool
16:49 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #654 (Closed): Demo Develop HT Software for send to PCL.)
Demo Develop HT Software for send to PCL. Kamol Anekchatnuntakool
16:46 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (78%) Priroj Neamjarn
16:46 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (78%) Priroj Neamjarn
16:33 Asian Stanley. International Limited 5.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
Dev Import & Export Master Jidapha Mangkhachot
16:32 Nidec Techno Motor (Thailand) Co.,Ltd. 3.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot

01 Jul 2024

17:47 Thai Metaltech Co.,Ltd 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Develop Add Page for FG SDI Master, ASSEMBLY FG SDI Page, and Plan FG Page. Ronnagon Kongsuwan
17:44 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #521 (New): Ronnagon Kongsuwan Taking Day off January-December 2024)
a half-day sick leave in the morning due to a high fever. Ronnagon Kongsuwan
16:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #654 (Closed): Demo Develop HT Software for send to PCL.)
Demo Develop HT Software for send to PCL. Kamol Anekchatnuntakool
16:46 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Improve login page (K'Ryo), Inbound Inquiry / Report Worawit Khantamool
16:32 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (75%) Priroj Neamjarn
16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (75%) Priroj Neamjarn
14:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - UI Project Handy Terminal KDST4000 (10) 1/1 Thanthima Phaengkham
14:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - UI Project Handy Terminal KDST3000 (9) 1/1 Thanthima Phaengkham
14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - UI Project Handy Terminal KDST1000 (8) 1/1 Thanthima Phaengkham
14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - UI Project Handy Terminal KDPP6000(6),KDPP7000 (7) 1/1 Thanthima Phaengkham
14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - UI Project Handy Terminal KDPP5000(5) 1/1 Thanthima Phaengkham
10:47 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Support installation Phatthadon Inthachot
10:46 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
Support installation Phatthadon Inthachot
10:45 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
Wiring Diagram and PR part list Phatthadon Inthachot
 