Activity
From 19 Jun 2024 to 28 Jun 2024
28 Jun 2024
- 17:36 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 17:15 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 17:19 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed schedule import PO
- 17:18 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Developed and completed Standard Specification Pages
- 17:16 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Design api inbound.
- 16:55 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Custom menu constant active, Inbound Schedule (Backend), Inbound Schedule Detail (Backend), Outbound Schedule (Backend)
- 16:43 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Revise HT Stock Software and Make Package Type Master.
- 16:40 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (70%)
- 16:40 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (70%)
- 15:51 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- fix handy : Stagging & Outer change sent E108 to event_det / Check data transmission that has no checkpoints in the ...
- 15:26 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- 08:20 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix issue display screen don't working on PC
- 08:18 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix issue windows updates on PC
- 08:18 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix issue windows updates on PC
- 08:18 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix issue windows updates on PC
- 01:47 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Monitor and check the result of optimized DB
- 01:46 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- 08:19 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:18 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:11 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:09 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 07:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #651 (Closed): OTICS Dashboard in mast demo)
- Create Dashboard : Daily hourly bar chart display, Monthly daily bar chart display, Yearly monthly bar chart display,...
27 Jun 2024
- 18:17 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- API
- 16:45 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #648 (Closed): Check HT Software.)
- Check Source Code HT Software.
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (68%)
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (68%)
- 16:06 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #643 (Closed): [Area1] Camera control system)
- Setup Camera and Test Signal I/O at 8-14
- 16:02 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #643 (Closed): [Area1] Camera control system)
- Wiring Power Cable and Power on cabinet at 11-14 , Setup Camera and Test Signal I/O at 1-7
- 16:00 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #643 (Closed): [Area1] Camera control system)
- Wiring Power Cable and Power on cabinet at 1-10
- 13:46 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Make Kanban Master.
26 Jun 2024
- 18:43 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Develop standard specification pages as required in the TMC project document.
- 18:41 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
- Installed and reviewed the internal source code of Project Mast to understand the system architecture and functionali...
- 18:00 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add UI.
- 17:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Inbound Schedule (Backend 95%), Inbound Schedule Detail (Backend 95%)
- 16:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #648 (Closed): Check HT Software.)
- Check HT Software.
- 16:33 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify web service about LOCK_STEP_CHECK functions on staging/inner_packing/outer_packing
- 16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install and test LOCK_STEP_CHECK function in staging area
- 16:31 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 16:23 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (65%)
- 16:23 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (65%)
25 Jun 2024
- 21:25 YAMATO ELECTRIC (THAILAND) CO.,LTD 6.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 21:24 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #643 (Closed): [Area1] Camera control system)
- Installation camera system area 1
- 21:22 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #643 (Closed): [Area1] Camera control system)
- Installation camera system area 1
- 21:22 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Optimized the table index and modify INNER PACKING app to automatic detect display
- 21:19 Ebisu Foods Co Ltd. 1.00 hour (Project progress work #649 (Closed): [Meeting] Document and assignment)
- 17:36 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add UI
- 16:54 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:54 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:54 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 16:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #648 (Closed): Check HT Software.)
- Check HT Software.
- 16:49 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- # Master Management => Location Master, User Master, User Credential Master
- 16:32 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Dev Import & Export Master
- 16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- -Develop a code for back-end (.net c#) (60%).
- 16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- 08:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Final test pegasus stock management system.
24 Jun 2024
- 22:46 NTPT Company Limited. 5.00 hours (Project progress work #464 (Closed): Learn to use the Asprova program.)
- Study the program's user manual.
- 22:42 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- translate pokayoke system
- 22:38 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Design database for phase2
- 22:25 Asian Stanley. International Limited 2.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- modify edit function of diebond process and add api for this function
- 22:24 Asian Stanley. International Limited 4.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- modify edit function of diebond process
- 22:22 Asian Stanley. International Limited 3.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- meeting with customer about recheck report format and modify spec R6. topic NG still not confirm
- 22:21 Asian Stanley. International Limited 2.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- coding add function and desing database and fix api for diebond process
- 22:20 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- coding add function of diebond process
- 22:19 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 1.internal meeting with K.Pam Explain the content that she is responsible for. 2.design layout android
- 22:30 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- 22:28 NTPT Company Limited. 6.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Meeting with customer at NTPT. The information sent by the customer has been confirmed.: Shift, machine/ The informat...
- 22:10 A.N.I. LOGISTICS, LTD. 0.00 hour (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 22:07 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- fixed stagging function can search data if any fill data, fixed api
- 20:47 DENSO Philippines Corporation 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 17:06 Asian Stanley. International Limited 8.00 hours (Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app)
- Development Import & Export Master OutputCode
- 17:03 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Final Test HT Stock Software.
- 17:01 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Create Menu | # Master Management => Item Master, Bucket Quantity, Packing Standard
- 16:41 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add UI
- 16:30 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (50%)
- 16:29 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (50%)
- 08:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - UI Project Handy Terminal KDPP2000 (4) 1/1
- 08:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - UI Project Handy Terminal KDPL1000 (3) 1/1
- 08:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - UI Project Handy Terminal KDPA4000 (2) 1/1
- 08:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Test Project Handy Terminals 3/3
- 08:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Test Project Handy Terminals 2/3
- 08:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Test Project Handy Terminals 1/3
- 01:05 YAMATO ELECTRIC (THAILAND) CO.,LTD 7.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 01:05 YAMATO ELECTRIC (THAILAND) CO.,LTD 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Internal meeting about spec
- 00:57 YAMATO ELECTRIC (THAILAND) CO.,LTD 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 00:48 YAMATO ELECTRIC (THAILAND) CO.,LTD 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 01:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #646 (Closed): WDT and smartwatch demo project)
- Revise the old store procedure and fix the summary function(problem found about the incorrect data)
- 00:39 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #646 (Closed): WDT and smartwatch demo project)
- Create the javascript to display the daily work chart
- 00:38 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #646 (Closed): WDT and smartwatch demo project)
- Create new DB store procedure script for daily work chart
- 01:00 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix and update the new dashboard layout and data (store procedure and web)
- 00:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix problem about the duplicated data update on OUTER PACKING(web service & handy)
- 00:47 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Found missing problem of the PO number update from DAYUNIT(fix store procedure)
- 00:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix the change page command problem => INNER PACKING version 1.1.20
- 00:29 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Update changed the PDF viewer to AxAcroPDF => INNER PACKING version 1.2.0
- 00:56 Thai Metaltech Co.,Ltd 3.00 hours (Project progress work #620 (New): Meeting)
- 00:34 Thai Metaltech Co.,Ltd 1.00 hour (Project progress work #620 (New): Meeting)
- Decribe the specification by Pump (continue)
- 00:33 Thai Metaltech Co.,Ltd 1.00 hour (Project progress work #620 (New): Meeting)
- Decribe the specification by Pump
- 00:30 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 1.00 hour (Problem-Bug #638 (Closed): Support fix the data)
- Fix the incorrect stock data
23 Jun 2024
- 15:32 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 15:31 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
- Personal Leave
22 Jun 2024
- 18:40 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment machine
- 18:40 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment machine
- 18:37 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment machine
- 18:37 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment machine
- 18:36 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment machine
- 18:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- buy equipment @Ban Mo
- 18:35 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- Assemble
21 Jun 2024
- 18:43 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Testing Master Management.
- 17:44 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Add UI button.
- 16:57 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #644 (In Progress): [ Task ] Internal management)
- Make document for installation
- 16:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Meeting with supplier planet Hikvistion team
- 16:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Meeting on-site about problem of IoT Project and Infrastructure project
- 16:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Create Menu | # Master Management => Supplier Master, Supplier Master Information, Department Master, Item Master Inf...
- 16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Revise and Test HT Stock Software.
- 16:25 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (40%)
- 16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (40%)
20 Jun 2024
- 18:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Testing Stockmanagement.
- 16:58 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Change environment.
- 16:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Revise and Test HT Stock Software.
- 16:47 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- # Master Management - MRP Factory master - Please create this dashboard Design (K'Ryo)
- 16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (30%)
- 16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (30%)
- 08:38 8.00 hours (Sales support #642 (Closed): Stand by and support at PATLITE Booth )
- Stand by andsupport about information of Pegasus Dashboard
- 08:37 8.00 hours (Sales support #642 (Closed): Stand by and support at PATLITE Booth )
- Stand by andsupport about information of Pegasus Dashboard
- 08:37 8.00 hours (Sales support #642 (Closed): Stand by and support at PATLITE Booth )
- Stand by andsupport about information of Pegasus Dashboard
- 08:37 8.00 hours (Sales support #642 (Closed): Stand by and support at PATLITE Booth )
- Stand by andsupport about information of Pegasus Dashboard
- 08:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
- support Bekido and Weekly Meeting
- 08:31 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 08:30 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
- 08:13 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
19 Jun 2024
- 17:14 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- new request add button for calculate the usage pallet
- 16:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Revise and Test HT Stock Software.
- 16:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Dev menu Stock Management
- 07:56 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Testing and fixing bugs in the project.
- 16:46 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Leaning spec design 5% progress.
- 16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (25%)
- 16:31 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (25%)