- 22:30 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Development web display
- 20:27 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Update program machine data export
- 20:27 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Meeting update comment machine project
- 20:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Meeting about update progress of work
- 20:19 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- installation infrastructure project
- 19:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Support after installation air flow sensor
- 19:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Site survey about confrimation installation Air flow sensor
- 20:25 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #597 (In Progress): [ On-site ] Meeting about New project IoT)
- Kick off meeting and sumarize concept about ANDON project
- 20:13 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #597 (In Progress): [ On-site ] Meeting about New project IoT)
- Revised master plan
- 20:23 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #641 (Closed): [Requirement and support] MOC Line IoT Project)
- Site survey about confrimation position room for installation system
- 20:20 OTICS (Thailand) Co., Ltd. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
- Site survey about concern postion root installation pipe
- 20:18 ADVICS Manufacturing(Thailand)Co.,Ltd. 4.00 hours (Project progress work #640 (Closed): Data loss analysis export)
- Meeting about expain concept output data and how to input data
- 20:11 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI)
- Site survey about postiion installation CCTV and Access point
- 18:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and tests outbound history.
- 16:59 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Revise and Test HT Stock Software.
- 16:50 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Learn.
- 16:44 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (15%)
- 16:44 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (15%)
- 15:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 15:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 10:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 3/14 Projects. 5/5
- 10:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 3/14 Projects. 4/5
- 10:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 3/14 Projects. 3/5
- 10:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 3/14 Projects. 2/5
- 09:45 OTICS (Thailand) Co., Ltd. 9.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- programming PLC
17 Jun 2024
- 21:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Test function stock management system at the office.
- 17:21 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- 17:01 OTICS (Thailand) Co., Ltd. 4.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- Electrical drawing design
- 15:58 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- Site survey
- 15:54 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- Electrical drawing design
- 15:54 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- Electrical drawing design
- 16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Revise and Test HT Stock Software.
- 08:11 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:30 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (10%)
- 16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (10%)
- 15:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Meeting at JTEKT
- 10:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Wiring Diagram
- 15:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
- Setup notebook and install program
- 14:53 Tomas Tech Co.,Ltd. 32.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- 09:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 09:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 09:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 09:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
- On-site installation
- 09:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
- On-site installation
- 08:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 3/14 Projects. 1/5
15 Jun 2024
- 23:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed tests to fix bugs at the office.
- 19:42 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- Order equipment at SP acrylic(Pathum Thani)
- 19:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Order equipment at Ban Mo
- 19:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- JTEKT Infrastructure meeting update progress
- 19:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- installation infrastructure project
- 19:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Iot project
- 19:37 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- meeting and site survey about water treatment system at site
- 19:36 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment
- 17:20 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 15:48 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
- Setup environment on laptop
- 14:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (5%)
- 14:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for back-end (.net c#) (5%)
- 14:30 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 14:15 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
- Setup notebook and install program
- 14:00 DENSO Philippines Corporation 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 12:00 Asian Stanley. International Limited 4.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- meeting with customer and modify spec R5
- 12:00 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- fixed problem model PBP scan SCAN_STEP3_SUCCESS can't responce and test with K.nack
- 10:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 4/4
14 Jun 2024
- 17:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and completed Inbound Schedule import PO and DeliveryPlan in line row table.
- 16:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed Created Page Outbound history.
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:16 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(100%)
- 16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(100%)
- 09:39 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
- Test all UI and build APK
- 09:19 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 09:19 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 08:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 3/4
13 Jun 2024
- 16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:17 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(90%)
- 16:17 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(90%)
- 15:53 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 15:50 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Modify Specifications Documentation R4 and design database
- 14:28 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Problem-Bug #638 (Closed): Support fix the data)
- Create store procedure to automatic fix the unmatched qty between stock card and stock data
- 14:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix and test missing process data when continue rapid scan labels on OUTER PACKING SCAN STEP3 / STEP3_SUCCESS
- 08:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 2/4
- 07:57 A.N.I. LOGISTICS, LTD. 20.00 hours (Project progress work #637 (New): [Development] Modify dashboard)
- Modify dashboard
12 Jun 2024
- 17:45 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and completed Kanban status management in Page Stock management.
- 14:37 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed Kanban status management.
- 17:05 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 17:02 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
- support Bekido and support after installation
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:48 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
- Software installation
- 16:46 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- Data Buffer Design and PLC Programming
- 16:46 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- Data Buffer Design
- 16:39 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- 16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(85%)
- 16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(85%)
- 09:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Migration Handy Terminals Projects 2/14, 1/4
11 Jun 2024
- 22:38 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 22:37 DENSO Philippines Corporation 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 22:35 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- 17:49 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(80%)
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(80%)
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Test Project Handy Terminals 2/3
10 Jun 2024
- 22:04 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- internal meeting with K.nack about found bug on handy app and Request advice about ASI phase2 project
- 22:01 Asian Stanley. International Limited 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 19:51 YAMATO ELECTRIC (THAILAND) CO.,LTD 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 19:47 DENSO Philippines Corporation 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Fix to inject the clients to waiting jobs
- 17:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed import csv Kanban status management and edit data in row.
- 17:10 Asian Stanley. International Limited 4.00 hours (Project progress work #450 (Closed): Development web display )
- installation web display
- 17:08 Shodensha (Thailand) Co., Ltd. 4.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(75%)
- 16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(75%)
- 14:13 Tomas Tech Co.,Ltd. 20.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Improve pegasus menu Inbound Schedule
- 08:49 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
- Drawing/Estimate cost
- 08:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Migration Handy Terminal source code 1/14 Projects.