15 Jun 2024

23:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed tests to fix bugs at the office. Ronnagon Kongsuwan
19:42 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
Order equipment at SP acrylic(Pathum Thani) Konlawat Saechee
19:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Order equipment at Ban Mo Konlawat Saechee
19:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
JTEKT Infrastructure meeting update progress Konlawat Saechee
19:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
installation infrastructure project Konlawat Saechee
19:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
19:37 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
meeting and site survey about water treatment system at site Konlawat Saechee
19:36 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment Konlawat Saechee
17:20 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
15:48 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Setup environment on laptop Taweesak Prumvised
14:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (5%) Priroj Neamjarn
14:33 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for back-end (.net c#) (5%) Priroj Neamjarn
14:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Deploy project to customer server Priroj Neamjarn
14:15 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
14:00 DENSO PHILIPPINES CORPORATION 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Soraya Norasing
12:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting with customer and modify spec R5 Soraya Norasing
12:00 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
fixed problem model PBP scan SCAN_STEP3_SUCCESS can't responce and test with K.nack Soraya Norasing
10:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 4/4 Thanthima Phaengkham

14 Jun 2024

17:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Inbound Schedule import PO and DeliveryPlan in line row table. Ronnagon Kongsuwan
16:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Created Page Outbound history. Ronnagon Kongsuwan
16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:16 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(100%) Priroj Neamjarn
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(100%) Priroj Neamjarn
09:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Test all UI and build APK Taweesak Prumvised
09:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
09:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 3/4 Thanthima Phaengkham

13 Jun 2024

16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:17 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(90%) Priroj Neamjarn
16:17 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(90%) Priroj Neamjarn
15:53 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
15:50 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R4 and design database Soraya Norasing
14:28 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Problem-Bug #638 (Closed): Support fix the data)
Create store procedure to automatic fix the unmatched qty between stock card and stock data Kittisak Isarapongporn
14:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix and test missing process data when continue rapid scan labels on OUTER PACKING SCAN STEP3 / STEP3_SUCCESS Kittisak Isarapongporn
08:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 2/4 Thanthima Phaengkham
07:57 A.N.I. LOGISTICS, LTD. 20.00 hours (Project progress work #637 (New): [Development] Modify dashboard)
Modify dashboard Worawit Khantamool

12 Jun 2024

17:45 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Kanban status management in Page Stock management. Ronnagon Kongsuwan
14:37 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Kanban status management. Ronnagon Kongsuwan
17:05 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
17:02 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
support Bekido and support after installation Teeradon Yuensakul
16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Software installation Phatthadon Inthachot
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Buffer Design and PLC Programming Teeradon Yuensakul
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Buffer Design Teeradon Yuensakul
16:39 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
Phatthadon Inthachot
16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(85%) Priroj Neamjarn
16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(85%) Priroj Neamjarn
09:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - Migration Handy Terminals Projects 2/14, 1/4 Thanthima Phaengkham

11 Jun 2024

22:38 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
22:37 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Soraya Norasing
22:35 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
Soraya Norasing
17:49 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(80%) Priroj Neamjarn
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(80%) Priroj Neamjarn
09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - Test Project Handy Terminals 2/3 Thanthima Phaengkham

10 Jun 2024

22:04 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
internal meeting with K.nack about found bug on handy app and Request advice about ASI phase2 project Soraya Norasing
22:01 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Soraya Norasing
19:51 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
19:47 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Fix to inject the clients to waiting jobs Kittisak Isarapongporn
17:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed import csv Kanban status management and edit data in row. Ronnagon Kongsuwan
17:10 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #450 (Closed): Development web display )
installation web display Jidapha Mangkhachot
17:08 SHODENSHA (THAILAND) CO., LTD. 4.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(75%) Priroj Neamjarn
16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(75%) Priroj Neamjarn
14:13 TOMAS TECH CO., LTD. 20.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Improve pegasus menu Inbound Schedule Worawit Khantamool
08:49 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
Drawing/Estimate cost Konlawat Saechee
08:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham

08 Jun 2024

23:11 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the use of the Asprova program.(video clip) Soraya Norasing
22:50 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the Aspova program manual. (Bacis) Learn about tables and data collection. Soraya Norasing
22:49 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the Aspova program manual. meeting with customer at factory Soraya Norasing
23:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R3 and design database Soraya Norasing
23:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting with customer about report phase2 and Help customers find the cause and solve the problem of not being able t... Soraya Norasing
22:58 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Modify application on tablet change column MAT to Receive Soraya Norasing
22:56 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Orientation new member Soraya Norasing
22:52 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal with K.Ryo about Asprova, Internal meeting with K.Pai about pagasus and MAST handy application Soraya Norasing
22:54 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
test & modify smart watch system with K.nack (Add ACCEPTED_NOTIFY command) Soraya Norasing
06:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed row-based Kanban status management. Ronnagon Kongsuwan

07 Jun 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(70%) Priroj Neamjarn
16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(70%) Priroj Neamjarn
14:52 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
แก้ไขโปรแกรม ManualSoftwareSystem Jidapha Mangkhachot
11:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
Teeradon Yuensakul
11:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
progress update and talk about works plan at 09/06/2024 Teeradon Yuensakul
11:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check stock function. Taweesak Prumvised
11:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check outbound function Taweesak Prumvised
11:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check inbound function. Taweesak Prumvised
10:59 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #633 (Interruption): Knonledge tranfer A700 )
by piroj Taweesak Prumvised
10:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #634 (Interruption): Learn function A500 and pegasus web on doc.)
Taweesak Prumvised
10:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #632 (Interruption): Knowledge tranfer A500)
By sora Taweesak Prumvised
10:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #631 (Closed): First day new working)
Meeting and install sw new laptop. Taweesak Prumvised
09:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System 2/2. Thanthima Phaengkham
07:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed the kanban database table and created the kanban status management page. Ronnagon Kongsuwan

06 Jun 2024

23:50 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
23:48 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Problem-Bug #630 (Closed): Fix pegasus web page)
Fix to improve tag label generator page Kittisak Isarapongporn
17:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:40 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment water (dashboard) Konlawat Saechee
16:37 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
estimate cost / Order equipment Konlawat Saechee
16:34 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
design 3d /estimate cost Konlawat Saechee
16:31 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
แก้ไข Inspection Work ตอน Create แล้วเลือก Master ให้ดึงชื่อจาก Master มาใส่ในช่องต่างๆ Jidapha Mangkhachot
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(60%) Priroj Neamjarn
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(60%) Priroj Neamjarn
12:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System. Thanthima Phaengkham
08:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
07:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Meeting Nattapol Poeam
07:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
 