From 05 Jun 2024 to 14 Jun 2024

14 Jun 2024

17:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Inbound Schedule import PO and DeliveryPlan in line row table. Ronnagon Kongsuwan
16:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Created Page Outbound history. Ronnagon Kongsuwan
16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:16 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(100%) Priroj Neamjarn
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(100%) Priroj Neamjarn
09:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Test all UI and build APK Taweesak Prumvised
09:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
09:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 3/4 Thanthima Phaengkham

13 Jun 2024

16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:17 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(90%) Priroj Neamjarn
16:17 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(90%) Priroj Neamjarn
15:53 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
15:50 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R4 and design database Soraya Norasing
14:28 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Problem-Bug #638 (Closed): Support fix the data)
Create store procedure to automatic fix the unmatched qty between stock card and stock data Kittisak Isarapongporn
14:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix and test missing process data when continue rapid scan labels on OUTER PACKING SCAN STEP3 / STEP3_SUCCESS Kittisak Isarapongporn
08:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 2/14 Projects. 2/4 Thanthima Phaengkham
07:57 A.N.I. LOGISTICS, LTD. 20.00 hours (Project progress work #637 (New): [Development] Modify dashboard)
Modify dashboard Worawit Khantamool

12 Jun 2024

17:45 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Kanban status management in Page Stock management. Ronnagon Kongsuwan
14:37 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Kanban status management. Ronnagon Kongsuwan
17:05 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
17:02 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
support Bekido and support after installation Teeradon Yuensakul
16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Software installation Phatthadon Inthachot
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Buffer Design and PLC Programming Teeradon Yuensakul
16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Buffer Design Teeradon Yuensakul
16:39 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
Phatthadon Inthachot
16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(85%) Priroj Neamjarn
16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(85%) Priroj Neamjarn
09:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - Migration Handy Terminals Projects 2/14, 1/4 Thanthima Phaengkham

11 Jun 2024

22:38 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
22:37 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Soraya Norasing
22:35 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
Soraya Norasing
17:49 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(80%) Priroj Neamjarn
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(80%) Priroj Neamjarn
09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS - Test Project Handy Terminals 2/3 Thanthima Phaengkham

10 Jun 2024

22:04 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
internal meeting with K.nack about found bug on handy app and Request advice about ASI phase2 project Soraya Norasing
22:01 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Soraya Norasing
19:51 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
19:47 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Fix to inject the clients to waiting jobs Kittisak Isarapongporn
17:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed import csv Kanban status management and edit data in row. Ronnagon Kongsuwan
17:10 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #450 (Closed): Development web display )
installation web display Jidapha Mangkhachot
17:08 SHODENSHA (THAILAND) CO., LTD. 4.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(75%) Priroj Neamjarn
16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(75%) Priroj Neamjarn
14:13 TOMAS TECH CO., LTD. 20.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
Improve pegasus menu Inbound Schedule Worawit Khantamool
08:49 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
Drawing/Estimate cost Konlawat Saechee
08:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham

08 Jun 2024

23:11 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the use of the Asprova program.(video clip) Soraya Norasing
22:50 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the Aspova program manual. (Bacis) Learn about tables and data collection. Soraya Norasing
22:49 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the Aspova program manual. meeting with customer at factory Soraya Norasing
23:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R3 and design database Soraya Norasing
23:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting with customer about report phase2 and Help customers find the cause and solve the problem of not being able t... Soraya Norasing
22:58 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Modify application on tablet change column MAT to Receive Soraya Norasing
22:56 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Orientation new member Soraya Norasing
22:52 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal with K.Ryo about Asprova, Internal meeting with K.Pai about pagasus and MAST handy application Soraya Norasing
22:54 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
test & modify smart watch system with K.nack (Add ACCEPTED_NOTIFY command) Soraya Norasing
06:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed row-based Kanban status management. Ronnagon Kongsuwan

07 Jun 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(70%) Priroj Neamjarn
16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(70%) Priroj Neamjarn
14:52 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
แก้ไขโปรแกรม ManualSoftwareSystem Jidapha Mangkhachot
11:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
Teeradon Yuensakul
11:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
progress update and talk about works plan at 09/06/2024 Teeradon Yuensakul
11:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check stock function. Taweesak Prumvised
11:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check outbound function Taweesak Prumvised
11:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check inbound function. Taweesak Prumvised
10:59 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #633 (Interruption): Knonledge tranfer A700 )
by piroj Taweesak Prumvised
10:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #634 (Interruption): Learn function A500 and pegasus web on doc.)
Taweesak Prumvised
10:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #632 (Interruption): Knowledge tranfer A500)
By sora Taweesak Prumvised
10:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #631 (Closed): First day new working)
Meeting and install sw new laptop. Taweesak Prumvised
09:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System 2/2. Thanthima Phaengkham
07:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed the kanban database table and created the kanban status management page. Ronnagon Kongsuwan

06 Jun 2024

23:50 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
23:48 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Problem-Bug #630 (Closed): Fix pegasus web page)
Fix to improve tag label generator page Kittisak Isarapongporn
17:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:40 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment water (dashboard) Konlawat Saechee
16:37 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
estimate cost / Order equipment Konlawat Saechee
16:34 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
design 3d /estimate cost Konlawat Saechee
16:31 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
แก้ไข Inspection Work ตอน Create แล้วเลือก Master ให้ดึงชื่อจาก Master มาใส่ในช่องต่างๆ Jidapha Mangkhachot
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(60%) Priroj Neamjarn
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(60%) Priroj Neamjarn
12:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System. Thanthima Phaengkham
08:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
07:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Meeting Nattapol Poeam
07:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam

05 Jun 2024

22:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed an 'Add Stock Amount Summary Report' page, checked the table in the 'Stocktaking' page, and added PDF expor... Ronnagon Kongsuwan
19:01 TOMAS TECH CO., LTD. 16.00 hours (Project progress work #627 (Closed): Setup notebook and install program)
Install VSCode program and extensions Worawit Khantamool
17:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
17:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
17:11 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:33 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Modify, Installation and test the smartwatch system adding ACCEPTED_NOTIFY command Kittisak Isarapongporn
16:31 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify tag receive layout adding the 'S' icon of small part items Kittisak Isarapongporn
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end(50%). Priroj Neamjarn
16:23 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(50%). Priroj Neamjarn
16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Onsite check communication beetween factory 1-3 Nattapol Poeam
16:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:09 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Meeting about expain concept specification Nattapol Poeam
16:00 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Kick off meeting Nattapol Poeam
16:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Meeting about confrimation and site survey air flow sensor at factory 3 Nattapol Poeam
16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Support after installation air flow sensor and meeting Nattapol Poeam
16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Prepare quipment Nattapol Poeam
15:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Support after installation air flow sensor Nattapol Poeam
15:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Onsite-Installation CT and powermeter Nattapol Poeam
16:03 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
On-site service for check data not found leak test machine Nattapol Poeam
16:02 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
funtion print bluetooth Anonymous
16:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
fix reprint Anonymous
16:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
Remote check server NSET function Repack Anonymous
15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:58 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:57 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
modify Anonymous
15:57 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Meeting update comment machine project Nattapol Poeam
15:56 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Meeting update comment machine project Nattapol Poeam
15:55 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Fix camera export video error Nattapol Poeam
15:54 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
go get the problem Anonymous
13:05 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment water (dashboard) Konlawat Saechee
11:14 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Mapping Teeradon Yuensakul
11:14 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Mapping Teeradon Yuensakul
09:28 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:22 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
08:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
 