From 03 Jun 2024 to 12 Jun 2024
12 Jun 2024
- 17:45 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and completed Kanban status management in Page Stock management.
- 14:37 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed Kanban status management.
- 17:05 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 17:02 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
- support Bekido and support after installation
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
- Software installation
- 16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- Data Buffer Design and PLC Programming
- 16:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- Data Buffer Design
- 16:39 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #636 (Closed): Electrical drawing design)
- 16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(85%)
- 16:05 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(85%)
- 09:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Migration Handy Terminals Projects 2/14, 1/4
11 Jun 2024
- 22:38 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 22:37 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 22:35 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- 17:49 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(80%)
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(80%)
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS - Test Project Handy Terminals 2/3
10 Jun 2024
- 22:04 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- internal meeting with K.nack about found bug on handy app and Request advice about ASI phase2 project
- 22:01 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 19:51 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 19:47 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Fix to inject the clients to waiting jobs
- 17:52 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed import csv Kanban status management and edit data in row.
- 17:10 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #450 (Closed): Development web display )
- installation web display
- 17:08 SHODENSHA (THAILAND) CO., LTD. 4.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(75%)
- 16:18 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(75%)
- 14:13 TOMAS TECH CO., LTD. 20.00 hours (Project progress work #629 (In Progress): [MAST] Improve pegasus)
- Improve pegasus menu Inbound Schedule
- 08:49 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
- Drawing/Estimate cost
- 08:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Migration Handy Terminal source code 1/14 Projects.
08 Jun 2024
- 23:11 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Study the use of the Asprova program.(video clip)
- 22:50 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Study the Aspova program manual. (Bacis) Learn about tables and data collection.
- 22:49 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Study the Aspova program manual. meeting with customer at factory
- 23:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Modify Specifications Documentation R3 and design database
- 23:00 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- meeting with customer about report phase2 and Help customers find the cause and solve the problem of not being able t...
- 22:58 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- Modify application on tablet change column MAT to Receive
- 22:56 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Orientation new member
- 22:52 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Internal with K.Ryo about Asprova, Internal meeting with K.Pai about pagasus and MAST handy application
- 22:54 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- test & modify smart watch system with K.nack (Add ACCEPTED_NOTIFY command)
- 06:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed row-based Kanban status management.
07 Jun 2024
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(70%)
- 16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(70%)
- 14:52 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- แก้ไขโปรแกรม ManualSoftwareSystem
- 11:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
- 11:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
- progress update and talk about works plan at 09/06/2024
- 11:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
- Check stock function.
- 11:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
- Check outbound function
- 11:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
- Check inbound function.
- 10:59 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #633 (Interruption): Knonledge tranfer A700 )
- by piroj
- 10:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #634 (Interruption): Learn function A500 and pegasus web on doc.)
- 10:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #632 (Interruption): Knowledge tranfer A500)
- By sora
- 10:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #631 (Closed): First day new working)
- Meeting and install sw new laptop.
- 09:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System 2/2.
- 07:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed the kanban database table and created the kanban status management page.
06 Jun 2024
- 23:50 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 23:48 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Problem-Bug #630 (Closed): Fix pegasus web page)
- Fix to improve tag label generator page
- 17:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:40 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment water (dashboard)
- 16:37 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- estimate cost / Order equipment
- 16:34 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
- design 3d /estimate cost
- 16:31 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- แก้ไข Inspection Work ตอน Create แล้วเลือก Master ให้ดึงชื่อจาก Master มาใส่ในช่องต่างๆ
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(60%)
- 16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(60%)
- 12:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System.
- 08:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Migration Handy Terminal source code 1/14 Projects.
- 07:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Meeting
- 07:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Make function calculate PPHL and Bekido
05 Jun 2024
- 22:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed an 'Add Stock Amount Summary Report' page, checked the table in the 'Stocktaking' page, and added PDF expor...
- 19:01 TOMAS TECH CO., LTD. 16.00 hours (Project progress work #627 (Closed): Setup notebook and install program)
- Install VSCode program and extensions
- 17:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
- Setup notebook and install program
- 17:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
- Setup notebook and install program
- 17:11 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
- Development ManualSoftwareSystem
- 16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:33 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Modify, Installation and test the smartwatch system adding ACCEPTED_NOTIFY command
- 16:31 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify tag receive layout adding the 'S' icon of small part items
- 16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- -Develop a code for front-end(50%).
- 16:23 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(50%).
- 16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Make function calculate PPHL and Bekido
- 16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Onsite check communication beetween factory 1-3
- 16:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Make function calculate PPHL and Bekido
- 16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Make function calculate PPHL and Bekido
- 16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Connect system IoT final process
- 16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Connect system IoT final process
- 16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Connect system IoT final process
- 16:09 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
- Meeting about expain concept specification
- 16:00 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
- Kick off meeting
- 16:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Meeting about confrimation and site survey air flow sensor at factory 3
- 16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Support after installation air flow sensor and meeting
- 16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Prepare quipment
- 15:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Support after installation air flow sensor
- 15:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Onsite-Installation CT and powermeter
- 16:03 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
- On-site service for check data not found leak test machine
- 16:02 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
- funtion print bluetooth
- 16:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
- fix reprint
- 16:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
- Remote check server NSET function Repack
- 15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
- specification document revision 1.
- 15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
- specification document revision 1.
- 15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
- specification document revision 1.
- 15:58 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
- specification document revision 1.
- 15:57 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
- modify
- 15:57 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Meeting update comment machine project
- 15:56 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Meeting update comment machine project
- 15:55 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
- Fix camera export video error
- 15:54 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
- go get the problem
- 13:05 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Fix comment water (dashboard)
- 11:14 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- Data Mapping
- 11:14 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
- Data Mapping
- 09:28 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 09:22 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 08:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Migration Handy Terminal source code 1/14 Projects.
04 Jun 2024
- 22:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Migration Handy Terminal source code 1/14 Projects.
- 22:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Migration Handy Terminal source code 1/14 Projects.
- 21:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed Sql show data in table Outbound Inquiry Report Page And Outbound History Page.
- 20:21 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Checking the PDF preview banner hidden
- 20:17 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Add wording (PLAN_ACTUAL) to dashboard / Add the table_id column for CSV export function
- 20:16 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix issue in INNER PACKING app
- 20:19 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
- 16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:33 SHODENSHA (THAILAND) CO., LTD. 3.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
- Development ManualSoftwareSystem
- 16:31 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 5.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 16:09 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(40%)
- 16:08 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end(40%)
03 Jun 2024
- 23:29 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Design document forms and Study the use of the Esprova program.
- 23:27 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Modify Specifications Documentation R3 and Design document form
- 23:26 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- View documents, contact, request an explanation with the customer. and design forms
- 23:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Meeting with customer
- 23:22 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Modify Specifications Documentation R2
- 23:19 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
- NSET meeting RFID weight check function
- 23:17 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- meeting with K.poo Minebea about explains how to set up the printer's pot.
- 23:13 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #621 (Closed): Meeting)
- Internal meeting about specification Thai Matal Tech
- 22:40 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- meetting with customer about Problem with app not being able to launch after preset.
- 22:01 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Additional check for PDF viewer
- 21:57 A.N.I. LOGISTICS, LTD. 6.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Meeting at ANI factory
- 21:46 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix datetime service on Raspberry pi and check PDF viewer banner hidden
- 21:43 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- CSV report development 2/2
- 21:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- CSV report development 1/2
- 21:41 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Create the new script for dashboard
- 21:40 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Create new script for dashboard
- 21:48 YAMATO ELECTRIC (THAILAND) CO., LTD. 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Internal meeting about spec update
- 21:47 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Prepare spec
- 21:05 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #620 (New): Meeting)
- 21:02 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 2.00 hours (Project progress work #619 (Closed): Meeting)
- 20:57 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Check the problems about smartwatch run failed