From 30 May 2024 to 08 Jun 2024

08 Jun 2024

23:11 NTPT Company Limited. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the use of the Asprova program.(video clip) Soraya Norasing
22:50 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the Aspova program manual. (Bacis) Learn about tables and data collection. Soraya Norasing
22:49 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Study the Aspova program manual. meeting with customer at factory Soraya Norasing
23:02 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R3 and design database Soraya Norasing
23:00 Asian Stanley. International Limited 2.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting with customer about report phase2 and Help customers find the cause and solve the problem of not being able t... Soraya Norasing
22:58 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Modify application on tablet change column MAT to Receive Soraya Norasing
22:56 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Orientation new member Soraya Norasing
22:52 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Internal with K.Ryo about Asprova, Internal meeting with K.Pai about pagasus and MAST handy application Soraya Norasing
22:54 DENSO Philippines Corporation 4.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
test & modify smart watch system with K.nack (Add ACCEPTED_NOTIFY command) Soraya Norasing
06:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed row-based Kanban status management. Ronnagon Kongsuwan

07 Jun 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(70%) Priroj Neamjarn
16:12 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(70%) Priroj Neamjarn
14:52 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
แก้ไขโปรแกรม ManualSoftwareSystem Jidapha Mangkhachot
11:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #635 (Closed): support Bekido Project)
Teeradon Yuensakul
11:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
progress update and talk about works plan at 09/06/2024 Teeradon Yuensakul
11:11 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check stock function. Taweesak Prumvised
11:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check outbound function Taweesak Prumvised
11:09 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #624 (Closed): Compatible with A700 Pegasus standard programs)
Check inbound function. Taweesak Prumvised
10:59 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #633 (Interruption): Knonledge tranfer A700 )
by piroj Taweesak Prumvised
10:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #634 (Interruption): Learn function A500 and pegasus web on doc.)
Taweesak Prumvised
10:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #632 (Interruption): Knowledge tranfer A500)
By sora Taweesak Prumvised
10:23 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #631 (Closed): First day new working)
Meeting and install sw new laptop. Taweesak Prumvised
09:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System 2/2. Thanthima Phaengkham
07:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed the kanban database table and created the kanban status management page. Ronnagon Kongsuwan

06 Jun 2024

23:50 YAMATO ELECTRIC (THAILAND) CO.,LTD 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
23:48 Minebea AccessSolutions Thai Ltd 4.00 hours (Problem-Bug #630 (Closed): Fix pegasus web page)
Fix to improve tag label generator page Kittisak Isarapongporn
17:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:40 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment water (dashboard) Konlawat Saechee
16:37 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
estimate cost / Order equipment Konlawat Saechee
16:34 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Sales support #628 (Closed): design 3d for estimate cost)
design 3d /estimate cost Konlawat Saechee
16:31 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
แก้ไข Inspection Work ตอน Create แล้วเลือก Master ให้ดึงชื่อจาก Master มาใส่ในช่องต่างๆ Jidapha Mangkhachot
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(60%) Priroj Neamjarn
16:27 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(60%) Priroj Neamjarn
12:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT-PICS-Reconfirmation of number files for Test confirmation of PICS System. Thanthima Phaengkham
08:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
07:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Meeting Nattapol Poeam
07:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam

05 Jun 2024

22:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed an 'Add Stock Amount Summary Report' page, checked the table in the 'Stocktaking' page, and added PDF expor... Ronnagon Kongsuwan
19:01 Tomas Tech Co.,Ltd. 16.00 hours (Project progress work #627 (Closed): Setup notebook and install program)
Install VSCode program and extensions Worawit Khantamool
17:11 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
17:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
17:11 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:33 DENSO Philippines Corporation 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Modify, Installation and test the smartwatch system adding ACCEPTED_NOTIFY command Kittisak Isarapongporn
16:31 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify tag receive layout adding the 'S' icon of small part items Kittisak Isarapongporn
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end(50%). Priroj Neamjarn
16:23 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(50%). Priroj Neamjarn
16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Onsite check communication beetween factory 1-3 Nattapol Poeam
16:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:09 OTICS (Thailand) Co., Ltd. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Meeting about expain concept specification Nattapol Poeam
16:00 OTICS (Thailand) Co., Ltd. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Kick off meeting Nattapol Poeam
16:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Meeting about confrimation and site survey air flow sensor at factory 3 Nattapol Poeam
16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Support after installation air flow sensor and meeting Nattapol Poeam
16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Prepare quipment Nattapol Poeam
15:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Support after installation air flow sensor Nattapol Poeam
15:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Onsite-Installation CT and powermeter Nattapol Poeam
16:03 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
On-site service for check data not found leak test machine Nattapol Poeam
16:02 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
funtion print bluetooth Anonymous
16:01 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
fix reprint Anonymous
16:01 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
Remote check server NSET function Repack Anonymous
15:59 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:59 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:59 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:58 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:57 Thai Metaltech Co.,Ltd 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
modify Anonymous
15:57 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Meeting update comment machine project Nattapol Poeam
15:56 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Meeting update comment machine project Nattapol Poeam
15:55 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Fix camera export video error Nattapol Poeam
15:54 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
go get the problem Anonymous
13:05 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment water (dashboard) Konlawat Saechee
11:14 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Mapping Teeradon Yuensakul
11:14 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Mapping Teeradon Yuensakul
09:28 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:25 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:23 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:22 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
08:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham

04 Jun 2024

22:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
22:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
21:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Sql show data in table Outbound Inquiry Report Page And Outbound History Page. Ronnagon Kongsuwan
20:21 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Checking the PDF preview banner hidden Kittisak Isarapongporn
20:17 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Add wording (PLAN_ACTUAL) to dashboard / Add the table_id column for CSV export function Kittisak Isarapongporn
20:16 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix issue in INNER PACKING app Kittisak Isarapongporn
20:19 ASUTO GLOBAL LOGISTICS(Thailand) CO.LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Kittisak Isarapongporn
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:33 Shodensha (Thailand) Co., Ltd. 3.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:31 Nidec Techno Motor (Thailand) Co.,Ltd. 5.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:09 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(40%) Priroj Neamjarn
16:08 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(40%) Priroj Neamjarn

03 Jun 2024

23:29 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Design document forms and Study the use of the Esprova program. Soraya Norasing
23:27 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Modify Specifications Documentation R3 and Design document form Soraya Norasing
23:26 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
View documents, contact, request an explanation with the customer. and design forms Soraya Norasing
23:23 Asian Stanley. International Limited 4.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Meeting with customer Soraya Norasing
23:22 Asian Stanley. International Limited 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R2 Soraya Norasing
23:19 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
NSET meeting RFID weight check function Soraya Norasing
23:17 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting with K.poo Minebea about explains how to set up the printer's pot. Soraya Norasing
23:13 Thai Metaltech Co.,Ltd 4.00 hours (Project progress work #621 (Closed): Meeting)
Internal meeting about specification Thai Matal Tech Soraya Norasing
22:40 DENSO Philippines Corporation 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
meetting with customer about Problem with app not being able to launch after preset. Soraya Norasing
22:01 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Additional check for PDF viewer Kittisak Isarapongporn
21:57 A.N.I. LOGISTICS, LTD. 6.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Meeting at ANI factory Kittisak Isarapongporn
21:46 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix datetime service on Raspberry pi and check PDF viewer banner hidden Kittisak Isarapongporn
21:43 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
CSV report development 2/2 Kittisak Isarapongporn
21:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
CSV report development 1/2 Kittisak Isarapongporn
21:41 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Create the new script for dashboard Kittisak Isarapongporn
21:40 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Create new script for dashboard Kittisak Isarapongporn
21:48 YAMATO ELECTRIC (THAILAND) CO.,LTD 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Internal meeting about spec update Kittisak Isarapongporn
21:47 YAMATO ELECTRIC (THAILAND) CO.,LTD 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Prepare spec Kittisak Isarapongporn
21:05 Thai Metaltech Co.,Ltd 2.00 hours (Project progress work #620 (New): Meeting)
Kittisak Isarapongporn
21:02 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 2.00 hours (Project progress work #619 (Closed): Meeting)
Kittisak Isarapongporn
20:57 DENSO Philippines Corporation 2.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Check the problems about smartwatch run failed Kittisak Isarapongporn

02 Jun 2024

09:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
09:00 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
00:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Sql show data in table Inbound Inquiry Report Page. Ronnagon Kongsuwan
00:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed display table inbound schedule DeliveryPlan in Page Inbound Schedule. Ronnagon Kongsuwan

01 Jun 2024

18:55 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:49 Nidec Techno Motor (Thailand) Co.,Ltd. 12.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:50 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end(20%) Priroj Neamjarn
16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end Priroj Neamjarn
16:19 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee
16:14 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee
16:14 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
16:06 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:09 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design Konlawat Saechee
10:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
10:17 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #618 (Closed): Keyence PLC trainning )
Teeradon Yuensakul

31 May 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end Priroj Neamjarn
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end Priroj Neamjarn
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
08:05 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:04 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot

30 May 2024

21:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed add insert line all page in mastermanagement. Ronnagon Kongsuwan
16:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for turning on the camera to scan QR Code. Priroj Neamjarn
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for turning on the camera to scan QR Code. Priroj Neamjarn
14:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check old source code. Modify if any problem. Thanthima Phaengkham
08:42 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
Teeradon Yuensakul
08:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
 