From 27 May 2024 to 05 Jun 2024

05 Jun 2024

22:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed an 'Add Stock Amount Summary Report' page, checked the table in the 'Stocktaking' page, and added PDF expor... Ronnagon Kongsuwan
19:01 TOMAS TECH CO., LTD. 16.00 hours (Project progress work #627 (Closed): Setup notebook and install program)
Install VSCode program and extensions Worawit Khantamool
17:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
17:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #625 (Closed): Setup notebook and install program)
Setup notebook and install program Phatthadon Inthachot
17:11 SHODENSHA (THAILAND) CO., LTD. 8.00 hours (Project progress work #626 (Closed): ManualSoftwareSystem)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:33 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Modify, Installation and test the smartwatch system adding ACCEPTED_NOTIFY command Kittisak Isarapongporn
16:31 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify tag receive layout adding the 'S' icon of small part items Kittisak Isarapongporn
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end(50%). Priroj Neamjarn
16:23 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(50%). Priroj Neamjarn
16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Onsite check communication beetween factory 1-3 Nattapol Poeam
16:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Make function calculate PPHL and Bekido Nattapol Poeam
16:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Connect system IoT final process Nattapol Poeam
16:09 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Meeting about expain concept specification Nattapol Poeam
16:00 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
Kick off meeting Nattapol Poeam
16:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Meeting about confrimation and site survey air flow sensor at factory 3 Nattapol Poeam
16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Support after installation air flow sensor and meeting Nattapol Poeam
16:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Prepare quipment Nattapol Poeam
15:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Support after installation air flow sensor Nattapol Poeam
15:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
Onsite-Installation CT and powermeter Nattapol Poeam
16:03 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
On-site service for check data not found leak test machine Nattapol Poeam
16:02 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
funtion print bluetooth Anonymous
16:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
fix reprint Anonymous
16:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #380 (Closed): Support And Fix)
Remote check server NSET function Repack Anonymous
15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:59 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:58 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
specification document revision 1. Anonymous
15:57 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #501 (Closed): [Coding] Warehouse management system Web app PHP Phase01)
modify Anonymous
15:57 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Meeting update comment machine project Nattapol Poeam
15:56 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Meeting update comment machine project Nattapol Poeam
15:55 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Fix camera export video error Nattapol Poeam
15:54 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
go get the problem Anonymous
13:05 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Fix comment water (dashboard) Konlawat Saechee
11:14 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Mapping Teeradon Yuensakul
11:14 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #502 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PLC Keyence)
Data Mapping Teeradon Yuensakul
09:28 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
09:22 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
08:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham

04 Jun 2024

22:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
22:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
21:27 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Sql show data in table Outbound Inquiry Report Page And Outbound History Page. Ronnagon Kongsuwan
20:21 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Checking the PDF preview banner hidden Kittisak Isarapongporn
20:17 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Add wording (PLAN_ACTUAL) to dashboard / Add the table_id column for CSV export function Kittisak Isarapongporn
20:16 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix issue in INNER PACKING app Kittisak Isarapongporn
20:19 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Kittisak Isarapongporn
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:33 SHODENSHA (THAILAND) CO., LTD. 3.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Development ManualSoftwareSystem Jidapha Mangkhachot
16:31 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 5.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:09 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(40%) Priroj Neamjarn
16:08 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end(40%) Priroj Neamjarn

03 Jun 2024

23:29 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Design document forms and Study the use of the Esprova program. Soraya Norasing
23:27 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Modify Specifications Documentation R3 and Design document form Soraya Norasing
23:26 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
View documents, contact, request an explanation with the customer. and design forms Soraya Norasing
23:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Meeting with customer Soraya Norasing
23:22 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R2 Soraya Norasing
23:19 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
NSET meeting RFID weight check function Soraya Norasing
23:17 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting with K.poo Minebea about explains how to set up the printer's pot. Soraya Norasing
23:13 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #621 (Closed): Meeting)
Internal meeting about specification Thai Matal Tech Soraya Norasing
22:40 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
meetting with customer about Problem with app not being able to launch after preset. Soraya Norasing
22:01 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Additional check for PDF viewer Kittisak Isarapongporn
21:57 A.N.I. LOGISTICS, LTD. 6.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Meeting at ANI factory Kittisak Isarapongporn
21:46 A.N.I. LOGISTICS, LTD. 7.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix datetime service on Raspberry pi and check PDF viewer banner hidden Kittisak Isarapongporn
21:43 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
CSV report development 2/2 Kittisak Isarapongporn
21:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
CSV report development 1/2 Kittisak Isarapongporn
21:41 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Create the new script for dashboard Kittisak Isarapongporn
21:40 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Create new script for dashboard Kittisak Isarapongporn
21:48 YAMATO ELECTRIC (THAILAND) CO., LTD. 1.00 hour (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Internal meeting about spec update Kittisak Isarapongporn
21:47 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Prepare spec Kittisak Isarapongporn
21:05 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #620 (New): Meeting)
Kittisak Isarapongporn
21:02 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 2.00 hours (Project progress work #619 (Closed): Meeting)
Kittisak Isarapongporn
20:57 DENSO PHILIPPINES CORPORATION 2.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Check the problems about smartwatch run failed Kittisak Isarapongporn

02 Jun 2024

09:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
09:00 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
00:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Sql show data in table Inbound Inquiry Report Page. Ronnagon Kongsuwan
00:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed display table inbound schedule DeliveryPlan in Page Inbound Schedule. Ronnagon Kongsuwan

01 Jun 2024

18:55 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 12.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:50 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end(20%) Priroj Neamjarn
16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end Priroj Neamjarn
16:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee
16:14 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee
16:14 THAI NIPPON FOODS CO., LTD. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
16:06 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design Konlawat Saechee
10:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
10:17 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #618 (Closed): Keyence PLC trainning )
Teeradon Yuensakul

31 May 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end Priroj Neamjarn
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end Priroj Neamjarn
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
08:05 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:04 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot

30 May 2024

21:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed add insert line all page in mastermanagement. Ronnagon Kongsuwan
16:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for turning on the camera to scan QR Code. Priroj Neamjarn
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for turning on the camera to scan QR Code. Priroj Neamjarn
14:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check old source code. Modify if any problem. Thanthima Phaengkham
08:42 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
Teeradon Yuensakul
08:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul

29 May 2024

19:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Stock Change Location in Page Stock management. Ronnagon Kongsuwan
19:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed table display show PO in page Inbound Schedule. Ronnagon Kongsuwan
16:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Development web display Jidapha Mangkhachot
16:43 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Edit Jidapha Mangkhachot
16:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check old source code. Modify if any problem. Thanthima Phaengkham
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram (90%) Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram (90%) Priroj Neamjarn
09:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #617 (Closed): Estimate the AGV Project at JTEKT)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul

28 May 2024

17:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
Install program / training plc keyence(VDO) Konlawat Saechee
17:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
Install program / training plc keyence(VDO) Konlawat Saechee
17:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
setup laptop / Install program Konlawat Saechee
17:38 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
redmine training \ setup laptop Konlawat Saechee
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram(60%) Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram Priroj Neamjarn
14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
[Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[LAT] Meeting about Work report of CKD system Thanthima Phaengkham
14:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #450 (Closed): Development web display )
Deploy web display Jidapha Mangkhachot
14:33 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
14:03 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design mounting Konlawat Saechee

27 May 2024

21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:51 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
19:33 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Import Transactions page for Schedule import PO data. Ronnagon Kongsuwan
17:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create schedule plan,flow diagram Priroj Neamjarn
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create schedule plan,flow diagram Priroj Neamjarn
10:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
10:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
10:52 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
07:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 ),Start modifying handy terminal source co... Thanthima Phaengkham
 