From 24 May 2024 to 02 Jun 2024

02 Jun 2024

09:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
09:00 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
00:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed Sql show data in table Inbound Inquiry Report Page. Ronnagon Kongsuwan
00:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed display table inbound schedule DeliveryPlan in Page Inbound Schedule. Ronnagon Kongsuwan

01 Jun 2024

18:55 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
18:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 12.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:50 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end(20%) Priroj Neamjarn
16:49 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Develop a code for front-end Priroj Neamjarn
16:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee
16:14 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee
16:14 THAI NIPPON FOODS CO., LTD. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
16:06 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
16:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Iot project Konlawat Saechee
16:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design Konlawat Saechee
10:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
10:17 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #618 (Closed): Keyence PLC trainning )
Teeradon Yuensakul

31 May 2024

16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end Priroj Neamjarn
16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for front-end Priroj Neamjarn
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
08:05 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot
08:04 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
fix program bugs Jidapha Mangkhachot

30 May 2024

21:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed add insert line all page in mastermanagement. Ronnagon Kongsuwan
16:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for turning on the camera to scan QR Code. Priroj Neamjarn
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Develop a code for turning on the camera to scan QR Code. Priroj Neamjarn
14:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check old source code. Modify if any problem. Thanthima Phaengkham
08:42 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
Teeradon Yuensakul
08:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul

29 May 2024

19:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Stock Change Location in Page Stock management. Ronnagon Kongsuwan
19:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed table display show PO in page Inbound Schedule. Ronnagon Kongsuwan
16:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Development web display Jidapha Mangkhachot
16:43 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Edit Jidapha Mangkhachot
16:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check old source code. Modify if any problem. Thanthima Phaengkham
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram (90%) Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram (90%) Priroj Neamjarn
09:35 TOMAS TECH CO., LTD. 8.00 hours (Sales support #617 (Closed): Estimate the AGV Project at JTEKT)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul

28 May 2024

17:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
Install program / training plc keyence(VDO) Konlawat Saechee
17:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
Install program / training plc keyence(VDO) Konlawat Saechee
17:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
setup laptop / Install program Konlawat Saechee
17:38 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
redmine training \ setup laptop Konlawat Saechee
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram(60%) Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram Priroj Neamjarn
14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
[Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[LAT] Meeting about Work report of CKD system Thanthima Phaengkham
14:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #450 (Closed): Development web display )
Deploy web display Jidapha Mangkhachot
14:33 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
14:03 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design mounting Konlawat Saechee

27 May 2024

21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:51 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
19:33 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Import Transactions page for Schedule import PO data. Ronnagon Kongsuwan
17:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create schedule plan,flow diagram Priroj Neamjarn
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create schedule plan,flow diagram Priroj Neamjarn
10:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
10:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
10:52 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
07:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 ),Start modifying handy terminal source co... Thanthima Phaengkham

26 May 2024

18:31 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
18:30 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
18:28 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Konlawat Saechee
18:28 THAI NIPPON FOODS CO., LTD. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Data Logging Water Treatment Konlawat Saechee
18:27 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Data Logging Water Treatment Konlawat Saechee
18:25 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Dashboard Water Treatment Konlawat Saechee
18:24 THAI NIPPON FOODS CO., LTD. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Dashboard Water Treatment Konlawat Saechee
13:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Power meter Konlawat Saechee
13:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Power meter Konlawat Saechee
13:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Power meter Konlawat Saechee
13:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Powermerter Konlawat Saechee
13:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
JATH Safety training Konlawat Saechee
13:37 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design Konlawat Saechee
13:34 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee

24 May 2024

22:16 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed schedule import Delivery Plan Ronnagon Kongsuwan
22:15 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed schedule import PO Ronnagon Kongsuwan
16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:36 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
16:09 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Deploy project to customer server Priroj Neamjarn
16:09 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Deploy project to customer server Priroj Neamjarn
11:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
meeting sumarize and prepare document for installation at (26/05/2024 Teeradon Yuensakul
11:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
11:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
prepare document for installation at (11/05/2024) Teeradon Yuensakul
11:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
prepare document and prepare device for installation at JTEKT ( 22/05/2024) Teeradon Yuensakul
11:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Stand by and support customer after installation Teeradon Yuensakul
11:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
CT Installation and wiring Teeradon Yuensakul
10:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 ) Thanthima Phaengkham
 