- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end
- 16:15 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for front-end
- 10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects.
- 08:05 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
- 08:04 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- fix program bugs
30 May 2024
- 21:50 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed add insert line all page in mastermanagement.
- 16:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for turning on the camera to scan QR Code.
- 16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Develop a code for turning on the camera to scan QR Code.
- 14:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Check old source code. Modify if any problem.
- 08:42 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
- 08:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
29 May 2024
- 19:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and completed Stock Change Location in Page Stock management.
- 19:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and completed table display show PO in page Inbound Schedule.
- 16:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Development web display
- 16:43 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List Edit
- 16:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Check old source code. Modify if any problem.
- 16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Design flow diagram, ER-diagram (90%)
- 16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Design flow diagram, ER-diagram (90%)
- 09:35 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #617 (Closed): Estimate the AGV Project at JTEKT)
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
28 May 2024
- 17:42 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
- Install program / training plc keyence(VDO)
- 17:41 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
- Install program / training plc keyence(VDO)
- 17:39 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
- setup laptop / Install program
- 17:38 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
- redmine training \ setup laptop
- 16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Design flow diagram, ER-diagram(60%)
- 16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Design flow diagram, ER-diagram
- 14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- [Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects.
- 14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- [LAT] Meeting about Work report of CKD system
- 14:35 Asian Stanley. International Limited 4.00 hours (Project progress work #450 (Closed): Development web display )
- Deploy web display
- 14:33 Nidec Techno Motor (Thailand) Co.,Ltd. 4.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 14:03 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
- 3D design mounting
27 May 2024
- 21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:51 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Test Program and Dashboard Development
- 21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
- On-site installation
- 21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
- On-site installation
- 21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
- On-site installation
- 21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Installation for Area 1
- 21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Installation for Area 1
- 21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Installation for Area 1
- 21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Installation for Area 1
- 19:33 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed and completed Import Transactions page for Schedule import PO data.
- 17:50 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- create schedule plan,flow diagram
- 16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- create schedule plan,flow diagram
- 10:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 10:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 10:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas i-Reporter create teaching document into Thai
- 07:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 ),Start modifying handy terminal source co...
26 May 2024
- 18:31 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- FTP Water treatment project
- 18:30 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- FTP Water treatment project
- 18:28 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- FTP
- 18:28 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Data Logging Water Treatment
- 18:27 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Data Logging Water Treatment
- 18:25 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Dashboard Water Treatment
- 18:24 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
- Dashboard Water Treatment
- 13:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Install CT and Install Power meter
- 13:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Install CT and Install Power meter
- 13:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Install CT and Install Power meter
- 13:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- Install CT and Install Powermerter
- 13:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
- JATH Safety training
- 13:37 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
- 3D design
- 13:34 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
- 3D design
24 May 2024
- 22:16 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed schedule import Delivery Plan
- 22:15 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Developed schedule import PO
- 16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:36 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:09 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 16:09 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 11:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
- meeting sumarize and prepare document for installation at (26/05/2024
- 11:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
- 11:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
- prepare document for installation at (11/05/2024)
- 11:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
- prepare document and prepare device for installation at JTEKT ( 22/05/2024)
- 11:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
- Stand by and support customer after installation
- 11:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
- CT Installation and wiring
- 10:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 )
23 May 2024
- 18:14 Minebea AccessSolutions Thai Ltd 1.00 hour (Problem-Bug #609 (Closed): [Problem] Fix the print queue hold problem of Handy)
- Create new instance of LPC program to port 13001
- 18:10 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Disable prevent_duplicate_check on OUTER process / Prevent exceed actual number of INNER PACKING / Fix checkpoint imp...
- 01:48 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix the script of updating order no from dayunit and enhanced the web pages to use server side datatable
- 18:08 YAMATO ELECTRIC (THAILAND) CO.,LTD 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Kickoff meeting
- 16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:38 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 16:34 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Modify Specifications Documentation R2. and Meeting with customer 14:00-16:00
- 16:36 NTPT Company Limited. 5.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Modify Asprova system Specifications Documentation
- 16:33 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Switch holidays 01 May 2024
- 16:32 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Annual Holiday
- 16:31 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Annual Holiday
- 16:09 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:06 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Make a manual.
- 16:05 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Make a manual.
- 08:32 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
- Sick leave
- 01:45 DENSO Philippines Corporation 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Update the source code to DNPH site
22 May 2024
- 20:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- PICS-Check handy terminal function KDPA2000
- 09:15 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
- Stock Inquiry Report
- 09:11 Ebisu Foods Co Ltd. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 09:10 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Parent project #581 (Closed): [PJ230018]Handy terminal Label Re-printing function)
- 09:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #602 (New): DEMO Print Bluetooth)
- 09:04 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- FIX
- 09:04 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- FIX
- 09:03 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- FIX
- 09:00 Tomas Tech Co.,Ltd. 8.00 hours (Parent project #532 (New): [PJ******] Internal development project)
- 08:55 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #153 (Closed): HTA_NSET completion fix bug.)
- FIX
- 08:54 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #153 (Closed): HTA_NSET completion fix bug.)