29 May 2024

19:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Stock Change Location in Page Stock management. Ronnagon Kongsuwan
19:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed table display show PO in page Inbound Schedule. Ronnagon Kongsuwan
16:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Development web display Jidapha Mangkhachot
16:43 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Edit Jidapha Mangkhachot
16:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check old source code. Modify if any problem. Thanthima Phaengkham
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram (90%) Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram (90%) Priroj Neamjarn
09:35 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #617 (Closed): Estimate the AGV Project at JTEKT)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul
09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #616 (Closed): Software and Hardware Configuration Factory1 , 2 and 3)
Teeradon Yuensakul

28 May 2024

17:42 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
Install program / training plc keyence(VDO) Konlawat Saechee
17:41 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
Install program / training plc keyence(VDO) Konlawat Saechee
17:39 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
setup laptop / Install program Konlawat Saechee
17:38 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #615 (Closed): Setup notebook for working)
redmine training \ setup laptop Konlawat Saechee
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram(60%) Priroj Neamjarn
16:04 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Design flow diagram, ER-diagram Priroj Neamjarn
14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
[Task]LAT-PICS-Migration Handy Terminal source code 1/14 Projects. Thanthima Phaengkham
14:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
[LAT] Meeting about Work report of CKD system Thanthima Phaengkham
14:35 Asian Stanley. International Limited 4.00 hours (Project progress work #450 (Closed): Development web display )
Deploy web display Jidapha Mangkhachot
14:33 Nidec Techno Motor (Thailand) Co.,Ltd. 4.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
14:03 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design mounting Konlawat Saechee

27 May 2024

21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:51 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Test Program and Dashboard Development Panupong Raksakit
21:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #614 (New): (Power Meter and CT ) Wiring and Installation )
On-site installation Panupong Raksakit
21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
21:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Installation for Area 1 Panupong Raksakit
19:33 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and completed Import Transactions page for Schedule import PO data. Ronnagon Kongsuwan
17:50 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
16:51 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create schedule plan,flow diagram Priroj Neamjarn
16:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
create schedule plan,flow diagram Priroj Neamjarn
10:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
10:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
10:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
07:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 ),Start modifying handy terminal source co... Thanthima Phaengkham

26 May 2024

18:31 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
18:30 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Water treatment project Konlawat Saechee
18:28 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
FTP Konlawat Saechee
18:28 Thai Nippon foods Co.,Ltd. 4.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Data Logging Water Treatment Konlawat Saechee
18:27 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Data Logging Water Treatment Konlawat Saechee
18:25 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Dashboard Water Treatment Konlawat Saechee
18:24 Thai Nippon foods Co.,Ltd. 8.00 hours (Problem-Bug #613 (Closed): Fix comment machine operation and water treatment)
Dashboard Water Treatment Konlawat Saechee
13:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Power meter Konlawat Saechee
13:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Power meter Konlawat Saechee
13:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Power meter Konlawat Saechee
13:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Install CT and Install Powermerter Konlawat Saechee
13:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #611 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
JATH Safety training Konlawat Saechee
13:37 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #610 (Closed): [ Concept design and summarize cost ] Final inspection line 3J project JTEKT)
3D design Konlawat Saechee
13:34 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #612 (Closed): demo kit safety door system)
3D design Konlawat Saechee

24 May 2024

22:16 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed schedule import Delivery Plan Ronnagon Kongsuwan
22:15 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed schedule import PO Ronnagon Kongsuwan
16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:36 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
16:09 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Deploy project to customer server Priroj Neamjarn
16:09 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Deploy project to customer server Priroj Neamjarn
11:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
meeting sumarize and prepare document for installation at (26/05/2024 Teeradon Yuensakul
11:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Teeradon Yuensakul
11:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
prepare document for installation at (11/05/2024) Teeradon Yuensakul
11:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
prepare document and prepare device for installation at JTEKT ( 22/05/2024) Teeradon Yuensakul
11:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Stand by and support customer after installation Teeradon Yuensakul
11:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
CT Installation and wiring Teeradon Yuensakul
10:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
PICS-modifying handy terminal source code 1/14 projects (projects KDPA2000 ) Thanthima Phaengkham

23 May 2024

18:14 Minebea AccessSolutions Thai Ltd 1.00 hour (Problem-Bug #609 (Closed): [Problem] Fix the print queue hold problem of Handy)
Create new instance of LPC program to port 13001 Kittisak Isarapongporn
18:10 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Disable prevent_duplicate_check on OUTER process / Prevent exceed actual number of INNER PACKING / Fix checkpoint imp... Kittisak Isarapongporn
01:48 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Fix the script of updating order no from dayunit and enhanced the web pages to use server side datatable Kittisak Isarapongporn
18:08 YAMATO ELECTRIC (THAILAND) CO.,LTD 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kickoff meeting Kittisak Isarapongporn
16:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:38 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Soraya Norasing
16:34 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
Modify Specifications Documentation R2. and Meeting with customer 14:00-16:00 Soraya Norasing
16:36 NTPT Company Limited. 5.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Modify Asprova system Specifications Documentation Soraya Norasing
16:33 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Switch holidays 01 May 2024 Soraya Norasing
16:32 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Annual Holiday Soraya Norasing
16:31 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Annual Holiday Soraya Norasing
16:09 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Dev Packing List Jidapha Mangkhachot
16:06 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Make a manual. Priroj Neamjarn
16:05 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Make a manual. Priroj Neamjarn
08:32 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
Sick leave Jidapha Mangkhachot
01:45 DENSO Philippines Corporation 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Update the source code to DNPH site Kittisak Isarapongporn

22 May 2024

20:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
PICS-Check handy terminal function KDPA2000 Thanthima Phaengkham
09:15 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
Stock Inquiry Report Anonymous
09:11 Ebisu Foods Co Ltd. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
Anonymous
09:10 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Parent project #581 (Closed): [PJ230018]Handy terminal Label Re-printing function)
Anonymous
09:10 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #602 (New): DEMO Print Bluetooth)
Anonymous
09:04 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
FIX Anonymous
09:04 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
FIX Anonymous
09:03 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
FIX Anonymous
09:00 Tomas Tech Co.,Ltd. 8.00 hours (Parent project #532 (New): [PJ******] Internal development project)
Anonymous
08:55 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #153 (Closed): HTA_NSET completion fix bug.)
FIX Anonymous
08:54 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #153 (Closed): HTA_NSET completion fix bug.)
Anonymous

21 May 2024

18:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Developed and studied information about the PurchaseOrder and ForecastOrder of the Bom system, and I am currently wor... Ronnagon Kongsuwan
16:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:16 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Test script of process email send. Priroj Neamjarn
16:15 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Test script of process email send. Priroj Neamjarn
08:42 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #600 (Closed): AGV Requirement meeting at JTEKT)
Requirement meeting Teeradon Yuensakul
08:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Prepare Device for Installation in at (18/05/2024 to 19/05/2024) Teeradon Yuensakul
08:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Monthly Meeting about work at shutdown factory (Installation ) Teeradon Yuensakul
08:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 12.30 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
CT Installation and wiring Teeradon Yuensakul
08:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 9.30 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
CT Installation and wiring Teeradon Yuensakul
08:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 9.30 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Power meter Installation and some wiring Teeradon Yuensakul
08:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #599 (Closed): (Power Meter and CT ) Wiring and Installation Loop2 ,4 and Loop6 , )
Power Meter Installation Teeradon Yuensakul
08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
Check Document Thanthima Phaengkham

20 May 2024

18:45 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Created page Bill Of Materials add function import csv bome,edit,deleted Ronnagon Kongsuwan
16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
Develop HT Stock Software. Kamol Anekchatnuntakool
16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Installation, test and fix bug of web service and the INNER PACKING app version 1.1.16 (modified on last Saturday) Kittisak Isarapongporn
16:33 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Modify the INNER PACKING app for extend the PDF preview size and immediate show scan result data on scan machine Kittisak Isarapongporn
16:13 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Config process email send Priroj Neamjarn
16:13 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
Config process email send Priroj Neamjarn
09:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
Check all modules Handy Terminal Thanthima Phaengkham
08:59 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
ConMas i-Reporter create teaching document into Thai Arunwit Isarapongporn
08:51 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
08:51 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
Sick leave Arunwit Isarapongporn
 