- 22:30 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
- Sick leave
18 May 2024
- 22:19 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop and understand the BOM system in Project ACME and create a database for reusable code to be used in Project SKT.
- 16:59 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:32 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:14 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Design table is keep log approve flow.
- 16:14 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Design table is keep log approve flow.
- 11:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- Check all modules Handy Terminal
17 May 2024
- 22:15 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Fix the pagination bug on the item-master and learning pages. Check the server error logs for details.
- 17:27 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 17:26 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
- Sick leave
- 16:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:43 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Check and correction the dashboard data
- 12:58 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify store procedure sp_update_tagreceive_order_no_from_dayunit to support multiple control in the same dayunit order
- 12:55 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install and confirm test for simultaneous SET ORDER data display scan
- 16:13 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Implement Approve flow
- 16:13 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Implement Approve flow
- 12:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Update reports
16 May 2024
- 23:08 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Install program to new handy ( Spare )
- 23:06 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #597 (In Progress): [ On-site ] Meeting about New project IoT)
- NXP meeting about discust function send and receive data by rasberri-PI
- 17:20 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify the INNER PACKING app to able to preview the MEIJI CARD/PACKING METHOD for Inner packed items
- 17:18 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify the INNER PACKING app for support simultanous SET ORDER items data display
- 17:17 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Allow the connection failed can re-login without locking account (INNER PACKING)
- 17:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix sp_update_tagreceive_order_no_from_dayunit
- 17:18 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:30 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:17 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 16:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:45 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop Add Page Pinch List And Change Location in stockmanagement
- 16:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop fix bug item master can not select pagination
- 16:20 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Implement Scrap system phase 2 (2/9)
- 16:19 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Implement Scrap system phase 2 (2/9)
- 09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Check license library ActiveReports and SPREAD for Windows Forms
15 May 2024
- 20:45 Asian Stanley. International Limited 3.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- 20:43 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 1.check The received status has not changed the background. 2. change wording of alert
- 20:38 NTPT Company Limited. 6.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Create the Asprova specification document.
- 18:51 Tomas Tech Co.,Ltd. 5.00 hours (Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024)
- Sick leave
- 18:46 Asian Stanley. International Limited 1.00 hour (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:46 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:46 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:45 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:45 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:45 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:44 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:44 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:43 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:42 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:42 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:42 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:41 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:40 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:40 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:40 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:39 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:39 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:39 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:38 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:37 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 18:37 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- Development web display
- 17:50 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:48 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:48 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:48 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:48 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:47 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:47 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:47 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:47 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:46 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:46 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:46 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:45 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:45 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:44 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 17:42 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 14:41 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- 16:54 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 13:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- check POKAYOKE Matching HT Software.
- 13:39 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- SKT Meeting Stock Software.
- 13:38 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- SKT Meeting Stock Software.
- 16:22 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Adjust code for Scrap Project
- 16:22 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Adjust code for Scrap Project
- 14:07 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:07 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:07 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:07 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:06 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:06 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:05 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:03 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:02 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:02 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:01 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:00 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 14:00 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:59 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:59 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:59 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:58 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #514 (Closed): Kamol Anekchatnuntakool Taking Day off January-December 2024)
- work leave.
- 13:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- onsite Inner packing Software.
- 13:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- onsite Inner packing Software.
- 13:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- onsite Inner packing Software.
- 13:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- onsite Inner packing Software.
- 11:20 ADVICS Manufacturing(Thailand)Co.,Ltd. 4.00 hours (Parent project #554 (Closed): [PJ240003]Shipping traceability system for Advics)
- Training safety online
- 11:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
- Internal test function program with K.Panupong
- 11:16 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Internal meeting with K.Konlawat about fix comment logging function
- 11:13 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Fix comment
- 11:02 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Fix comment
- 10:50 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Develop program link gate
- 10:47 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Develop program link gate
- 10:47 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Develop program link gate
- 11:14 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
- Manual insert data
- 11:07 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
- Site survey about check data not found from machine
- 11:12 OTICS (Thailand) Co., Ltd. 8.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
- Kick off meeting
- 11:00 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Support installation
- 10:58 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #64 (Closed): [Area1]Camera control system)
- Installation camera system
- 10:56 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #64 (Closed): [Area1]Camera control system)
- Installation camera system
- 10:56 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #64 (Closed): [Area1]Camera control system)
- Installation camera system
- 10:53 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #406 (Closed): Prepare equipment for installation for Area1)
- Wiring and assy equipment
- 10:52 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #406 (Closed): Prepare equipment for installation for Area1)
- Wiring and assy equipment
- 10:48 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #406 (Closed): Prepare equipment for installation for Area1)
- Site survey before installation
- 10:44 DAIFUKU (THAILAND) LTD. 4.00 hours (Project progress work #406 (Closed): Prepare equipment for installation for Area1)
- Prepare quipment
- 10:35 DAIFUKU (THAILAND) LTD. 4.00 hours (Project progress work #406 (Closed): Prepare equipment for installation for Area1)
- Prepare quipment
- 08:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Check library ActiveReports and SPREAD for Windows Forms
14 May 2024
- 18:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop master data and add requirements to the supplier master and item master pages.
- 16:55 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 15:33 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Meeting with user Scrap Project
- 15:32 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Meeting with user Scrap Project
- 13:01 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 10:36 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
- manual add serial part to DB
- 09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Migration from previous versions - Active Reports & FarPoint.Win.SpreadJ
- 00:33 NTPT Company Limited. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Modify Asprova system Specifications Documentation
- 00:31 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
13 May 2024
- 22:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix PBP in INNER PACKING app
- 08:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 08:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 08:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 08:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 00:13 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify the INNER PACKING app for support simultanous PBP data display
- 00:13 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Design and develop for new requirement about simultanous PBP data display
- 18:53 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop and enhance a master data management system by adding a 'Master Management' page that includes Department Mas...
- 16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:33 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 16:13 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 16:13 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 09:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Migration from previous versions - Active Reports & FarPoint.Win.SpreadJ
- 00:41 Thai Honda Manufacturing Co., Ltd 1.00 hour (Sales support #483 (Closed): [Consider]Consideration of HATC calling system)
- Estimate time and installatiion of demo system
- 00:24 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #512 (Closed): Kittisak Isarapongporn Taking Day off January-December 2024)
10 May 2024
- 19:08 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop and understand the system for managing master data, and add a 'Master Management' page including Name Master,...
- 18:54 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 08:08 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #588 (Closed): Flow Meter and Power Meter MODBUS protocol setting)
- Modbus setting
- 16:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #588 (Closed): Flow Meter and Power Meter MODBUS protocol setting)
- Modbus setting
- 16:21 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- -Coding Font-end/Back-end for Document List and Document List items.
- 16:21 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- -Coding Font-end/Back-end for Document List and Document List items.
- 11:22 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #93 (Interruption): [On-site support]Support after cutover)
- 09:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Version upgrade development support
- 00:11 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Create the Process control system phase2 specification document. and design layout
- 00:10 Asian Stanley. International Limited 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Create the Process control system phase2 specification document.
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:08 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:08 DENSO Philippines Corporation 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 00:07 DENSO Philippines Corporation 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- modify accept job function & test
- 00:06 DENSO Philippines Corporation 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- modify accept job function
- 00:05 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:05 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:05 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:04 NTPT Company Limited. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Create the Asprova specification document.