Activity
From 04 May 2024 to 13 May 2024
13 May 2024
- 22:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix PBP in INNER PACKING app
- 08:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 08:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 08:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 08:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 00:13 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify the INNER PACKING app for support simultanous PBP data display
- 00:13 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Design and develop for new requirement about simultanous PBP data display
- 18:53 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop and enhance a master data management system by adding a 'Master Management' page that includes Department Mas...
- 16:47 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:33 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 16:13 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 16:13 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Deploy project to customer server
- 09:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Migration from previous versions - Active Reports & FarPoint.Win.SpreadJ
- 00:41 THAI HONDA MANUFACTURING CO., LTD. 1.00 hour (Sales support #483 (Closed): [Consider]Consideration of HATC calling system)
- Estimate time and installatiion of demo system
- 00:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #512 (Closed): Kittisak Isarapongporn Taking Day off January-December 2024)
10 May 2024
- 19:08 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop and understand the system for managing master data, and add a 'Master Management' page including Name Master,...
- 18:54 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 08:08 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #480 (Closed): [Coding] Handy terminal stock management system for Finished product C# handy temrinal)
- Develop HT Stock Software.
- 16:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #588 (Closed): Flow Meter and Power Meter MODBUS protocol setting)
- Modbus setting
- 16:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #588 (Closed): Flow Meter and Power Meter MODBUS protocol setting)
- Modbus setting
- 16:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- -Coding Font-end/Back-end for Document List and Document List items.
- 16:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- -Coding Font-end/Back-end for Document List and Document List items.
- 11:22 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #93 (Interruption): [On-site support]Support after cutover)
- 09:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- Version upgrade development support
- 00:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Create the Process control system phase2 specification document. and design layout
- 00:10 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- Create the Process control system phase2 specification document.
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:09 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:08 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:06 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 00:08 DENSO PHILIPPINES CORPORATION 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 00:07 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- modify accept job function & test
- 00:06 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- modify accept job function
- 00:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #511 (New): Arunwit Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 00:04 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Create the Asprova specification document.
09 May 2024
- 23:59 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 23:59 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 23:58 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 23:58 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation&On-site support
- 23:57 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:57 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:57 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:54 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:54 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:53 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:53 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:53 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:51 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:51 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install App Inner packing on PC and config APP on PC
- 23:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 23:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 23:48 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 23:48 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 23:48 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Install OS on PC and config APP on PC
- 00:20 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Modify INNER PACKING version 1.1.11 by removing the double quote from JSON before send to web socket
- 23:44 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:43 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:43 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:43 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:43 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:39 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 23:39 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 17:04 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Develop and understand the system for handling user login and logout processes, including session management, cache m...
- 16:54 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #380 (Closed): Support And Fix)
- 16:53 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:35 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- Dev Packing List
- 16:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- First step Database Design and Code Design
- 16:24 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- First step Database Design and Code Design
- 16:18 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Parent project #544 (Closed): [PJ230032]Traceability system for Delta line)
- PLC program checking
- 16:17 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
- 09:13 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #595 (Closed): ATA Casting traceability system delta line)
- Investigating Problem
- 12:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #490 (Closed): CAPS - Version upgrade development support)
- CAPS - Version upgrade development support
- 00:18 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 6.00 hours (Project progress work #507 (Closed): Modify the web application, handheld and database)
- Modify the web main page (adding the JMSTH PART NO) and wording / Display the JMSTH PART CODE(back_no) AND PART NAME ...
08 May 2024
- 19:41 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Installed the SKT Project and database to a cloud server, conducted tests, and reviewed the internal source code for ...
- 17:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- Check Database open error.
- 09:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 0.00 hour (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- 16:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Adjust screen application in Handyterminal BT-A700G
- 16:14 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Adjust screen application in Handyterminal BT-A700G
- 15:31 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #478 (Closed): [Coding]Handy terminal application modification task)
- Injection handy
- 15:31 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #478 (Closed): [Coding]Handy terminal application modification task)
- Part control handy
- 07:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #203 (Closed): Test Program & Make document)
- Program Installation
07 May 2024
- 23:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 2.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Internal meeting about SKT development team in office. 15.00-17.00
- 23:14 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 6.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Installed and reviewed the internal source code of Project Acme to understand the system architecture and functionali...
- 22:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:19 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:19 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 13:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 09:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 09:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 16:58 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Modify and test the web socket to support the ACCEPT request yes/no (continue) and multiple group joined
- 16:12 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:02 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Improved new version of BT-A700G
- 15:58 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- Improved new version of BT-A700G
- 13:20 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
06 May 2024
- 18:15 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
- 17:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #528 (Closed): Setup Notebook for Development)
- install pegasus, database, microsoft office,review internal source code
- 17:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #528 (Closed): Setup Notebook for Development)
- On my first day at work, I attended a meeting to get acquainted with my team and the project. Afterwards, I installed...
- 16:52 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- web scheduler grouping
- 16:52 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- api function
- 16:51 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- funtion print bluetooth
- 16:51 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- api function
- 16:50 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- FIX 2 language
- 16:48 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- test Reprint
- 16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- Reprint FG
- 16:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- fix repack
- 16:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- fix reprint
- 16:45 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- 16:43 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Installation new application SmartInvoker that used to automatic update the LabelPrint and ANIInnerPacking applications.
- 16:41 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Modify and test the web socket to support the ACCEPT request yes/no (continue)
- 16:40 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Modify the web socket to support the ACCEPT request yes/no
- 16:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
- Review internal source code Project Mast,Meeting, SKT Project Kickoff - Handy Terminal Stock Management System
- 14:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
- Program Installation
- 14:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
- Power Meter Modbus Setting
- 14:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
- Flow Meter Modbus setting
- 13:38 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #474 (Closed): [Area1]Camera control system)
- Installation Mechanical
- 13:38 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #474 (Closed): [Area1]Camera control system)
- Installation Mechanical
- 13:37 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Prepare items for installation at the work site.
- 13:37 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Prepare items for installation at the work site.
- 13:36 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Prepare items for installation at the work site.
- 13:35 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
- Meeting
- 13:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 13:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 13:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
- On-site support
- 11:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
- 11:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
- 11:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
- 11:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
- 11:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
- 11:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 11:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 11:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
- Check old source code. Modify if any problem.
- 11:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 0.00 hour (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
- 09:18 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- read document stock management system
- 09:07 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- read document stock management system
- 09:04 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- install vs2008,android studio and confing
- 09:00 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
- New install windows , set up email,learn rule company,reicve file poject handheld (windows ce and java)
04 May 2024
- 22:55 A.N.I. LOGISTICS, LTD. 0.00 hour (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- 22:53 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- check function print 147 digit & change the process of print tag maker. >> finished
- 22:52 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- check function print 147 digit & change the process of print tag maker
- 22:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- Installation&On-site support
- 22:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
- meeting with customer at ASI
- 22:43 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- meeting with customer at NTPT
- 22:41 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Create the Asprova specification document.
- 22:40 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
- Create the Asprova specification document.
- 22:38 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Installation&On-site support Day#5 and UAT 2/2
- 22:38 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Installation&On-site support Day#4 and UAT 1/2
- 22:36 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Installation&On-site support Day#3
- 22:36 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Installation&On-site support Day#2
- 22:36 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Installation&On-site support Day#1
- 22:33 DENSO PHILIPPINES CORPORATION 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- 22:31 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Internal test smart watch with K.nack at office
- 22:30 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Internal test smart watch at office
- 22:29 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- test & modify smart watch system with K.nack
- 22:28 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- test & modify smart watch system with K.nack
- 22:27 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- development connect to web socket and test
- 22:26 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- development connect to web socket
- 22:25 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- development count wait time and modify layout main page, acept job page.
- 22:24 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- development count wait time
- 22:21 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- modify acept job function
- 22:20 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- modify main activity of smart watch system
- 22:19 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- learn and understand program code.
- 22:18 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
- Meeting with K.nack about the working concept of the smart watch. learn and understand program code.
- 22:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 22:13 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 22:13 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- sick leave
- 22:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Switch holidays 18 Apr. 2024
- 22:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Switch holidays 17 Apr. 2024
- 22:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Switch holidays 16 Apr. 2024
- 22:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Switch holidays 15 Apr. 2024
- 22:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Switch holidays 15 Apr. 2024
- 22:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Annual Holiday
- 22:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Annual Holiday
- 22:03 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
- Annual Holiday