Project

General

Profile

Activity

From 27 Apr 2024 to 06 May 2024

06 May 2024

18:15 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #470 (Closed): Packing List System)
Jidapha Mangkhachot
17:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #528 (Closed): Setup Notebook for Development)
install pegasus, database, microsoft office,review internal source code Ronnagon Kongsuwan
17:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #528 (Closed): Setup Notebook for Development)
On my first day at work, I attended a meeting to get acquainted with my team and the project. Afterwards, I installed... Ronnagon Kongsuwan
16:52 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
web scheduler grouping Anonymous
16:52 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
api function Anonymous
16:51 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
funtion print bluetooth Anonymous
16:51 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
api function Anonymous
16:50 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
FIX 2 language Anonymous
16:48 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
test Reprint Anonymous
16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Reprint FG Anonymous
16:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
fix repack Anonymous
16:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
fix reprint Anonymous
16:45 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
16:43 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Installation new application SmartInvoker that used to automatic update the LabelPrint and ANIInnerPacking applications. Kittisak Isarapongporn
16:41 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Modify and test the web socket to support the ACCEPT request yes/no (continue) Kittisak Isarapongporn
16:40 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Modify the web socket to support the ACCEPT request yes/no Kittisak Isarapongporn
16:40 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #481 (Closed): [Coding] Handy terminal stock management system for Finished product PHP web)
Review internal source code Project Mast,Meeting, SKT Project Kickoff - Handy Terminal Stock Management System Ronnagon Kongsuwan
14:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
Program Installation Teeradon Yuensakul
14:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
Power Meter Modbus Setting Teeradon Yuensakul
14:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Parent project #553 (Closed): [PJ240004]Infrastructure IoT system for Jtekt Automotive)
Flow Meter Modbus setting Teeradon Yuensakul
13:38 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #474 (Closed): [Area1]Camera control system)
Installation Mechanical Panupong Raksakit
13:38 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #474 (Closed): [Area1]Camera control system)
Installation Mechanical Panupong Raksakit
13:37 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Prepare items for installation at the work site. Panupong Raksakit
13:37 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Prepare items for installation at the work site. Panupong Raksakit
13:36 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Prepare items for installation at the work site. Panupong Raksakit
13:35 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #473 (Closed): Prepare equipment for installation for Area1)
Meeting Panupong Raksakit
13:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:04 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
13:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
13:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH)
On-site support Panupong Raksakit
11:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
Panupong Raksakit
11:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
Panupong Raksakit
11:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
Panupong Raksakit
11:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
Panupong Raksakit
11:41 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #517 (New): Panupong Raksakit Taking Day off January-December 2024)
Panupong Raksakit
11:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
11:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
11:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
11:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 0.00 hour (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:18 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
read document stock management system Priroj Neamjarn
09:07 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
read document stock management system Priroj Neamjarn
09:04 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
install vs2008,android studio and confing Priroj Neamjarn
09:00 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #527 (Closed): Learning stock management system (handyterminal Java)/Development Scrap System for Nidec)
New install windows , set up email,learn rule company,reicve file poject handheld (windows ce and java) Priroj Neamjarn

04 May 2024

22:55 A.N.I. LOGISTICS, LTD. 0.00 hour (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Soraya Norasing
22:53 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
check function print 147 digit & change the process of print tag maker. >> finished Soraya Norasing
22:52 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
check function print 147 digit & change the process of print tag maker Soraya Norasing
22:07 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
Installation&On-site support Soraya Norasing
22:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java)
meeting with customer at ASI Soraya Norasing
22:43 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
meeting with customer at NTPT Soraya Norasing
22:41 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Create the Asprova specification document. Soraya Norasing
22:40 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #504 (Closed): [Setting] Production planning system APS 500,000 work)
Create the Asprova specification document. Soraya Norasing
22:38 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Installation&On-site support Day#5 and UAT 2/2 Soraya Norasing
22:38 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Installation&On-site support Day#4 and UAT 1/2 Soraya Norasing
22:36 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Installation&On-site support Day#3 Soraya Norasing
22:36 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Installation&On-site support Day#2 Soraya Norasing
22:36 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Installation&On-site support Day#1 Soraya Norasing
22:33 DENSO PHILIPPINES CORPORATION 0.00 hour (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Soraya Norasing
22:31 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Internal test smart watch with K.nack at office Soraya Norasing
22:30 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Internal test smart watch at office Soraya Norasing
22:29 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
test & modify smart watch system with K.nack Soraya Norasing
22:28 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
test & modify smart watch system with K.nack Soraya Norasing
22:27 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
development connect to web socket and test Soraya Norasing
22:26 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
development connect to web socket Soraya Norasing
22:25 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
development count wait time and modify layout main page, acept job page. Soraya Norasing
22:24 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
development count wait time Soraya Norasing
22:21 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
modify acept job function Soraya Norasing
22:20 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
modify main activity of smart watch system Soraya Norasing
22:19 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
learn and understand program code. Soraya Norasing
22:18 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01)
Meeting with K.nack about the working concept of the smart watch. learn and understand program code. Soraya Norasing
22:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
22:13 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
22:13 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
22:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Switch holidays 18 Apr. 2024 Soraya Norasing
22:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Switch holidays 17 Apr. 2024 Soraya Norasing
22:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Switch holidays 16 Apr. 2024 Soraya Norasing
22:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Switch holidays 15 Apr. 2024 Soraya Norasing
22:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Switch holidays 15 Apr. 2024 Soraya Norasing
22:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Annual Holiday Soraya Norasing
22:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Annual Holiday Soraya Norasing
22:03 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
Annual Holiday Soraya Norasing

03 May 2024

16:54 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #381 (Closed): [Coding]Android handyterminal BTA500 Outbound)
BluetoothPrinter Anonymous

02 May 2024

21:32 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
20:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
13:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
13:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
13:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
12:33 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation)
Check old source code. Modify if any problem. Thanthima Phaengkham
17:47 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Anonymous
17:47 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Anonymous
17:47 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Anonymous
09:40 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
api function Anonymous
09:40 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Send data to api function Anonymous
09:39 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
web scheduler grouping Anonymous
09:38 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
api function Anonymous
17:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Problem-Bug #526 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI)
Kittisak Isarapongporn
17:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
17:45 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
17:45 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
17:40 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
17:39 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
17:17 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
update status to NST_COMPL_INPUT table Anonymous
09:35 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
09:35 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
09:34 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
09:34 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
09:34 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
09:33 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
09:33 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Anonymous
17:43 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #462 (Closed): HT_MAST : Duplicate outbound bug)
funtion print bluetooth Anonymous
17:43 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #462 (Closed): HT_MAST : Duplicate outbound bug)
funtion print bluetooth Anonymous
17:38 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:37 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
exp date Anonymous
17:36 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
api function Anonymous
17:33 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:33 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:33 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:32 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #516 (New): Narupot Muangsiri Taking Day off January-December 2024)
Anonymous
17:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #516 (New): Narupot Muangsiri Taking Day off January-December 2024)
Anonymous
17:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
17:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
17:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
09:29 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
FIX Anonymous
09:29 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
FIX Anonymous
09:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #509 (In Progress): Soraya Norasing Taking Day off January-December 2024)
sick leave Soraya Norasing
09:26 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:26 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:26 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:25 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:25 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:25 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:25 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:24 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:23 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:23 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:22 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:21 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:20 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:19 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:19 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #445 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #442 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
09:10 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
Anonymous
00:19 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Fix for support join to the several groups Kittisak Isarapongporn
00:18 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Fix for support join to the several groups Kittisak Isarapongporn
00:04 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Installation day 5 and UAT 2/2 Kittisak Isarapongporn
00:04 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Installation day 4 and UAT 1/2 Kittisak Isarapongporn
00:03 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Installation day 3 Kittisak Isarapongporn
00:03 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Installation day 2 Kittisak Isarapongporn
00:03 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Installation day 1 Kittisak Isarapongporn
00:02 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Web socket coding Kittisak Isarapongporn
00:02 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Web socket coding Kittisak Isarapongporn
00:01 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Web socket coding Kittisak Isarapongporn
00:01 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Web socket coding Kittisak Isarapongporn
00:01 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Web socket coding Kittisak Isarapongporn
00:00 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Web socket coding Kittisak Isarapongporn
00:11 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Problem-Bug #508 (Closed): Support after cutover)
Fix the web issues and data linkage problems Kittisak Isarapongporn

01 May 2024

23:59 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Fix issues in the punchlist Kittisak Isarapongporn
23:54 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Kittisak Isarapongporn
23:53 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
Database and system design Kittisak Isarapongporn
23:49 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #507 (Closed): Modify the web application, handheld and database)
Installation and UAT 1/1 Kittisak Isarapongporn
23:49 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #507 (Closed): Modify the web application, handheld and database)
Test and fix the application Kittisak Isarapongporn
23:48 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #507 (Closed): Modify the web application, handheld and database)
Test and fix the application Kittisak Isarapongporn
16:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 400.00 hours (Project progress work #412 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project)
Santi Srichankaew
 

Also available in: Atom