- 22:14 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #458 (Closed): [On site support]Project Stock management system for MAS-T)
- 22:08 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- coding label(finish-->wait api) & staging function
- 20:33 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Install IoT system and check signal from machine
- 20:33 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Install IoT system and check signal from machine
- 20:33 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Install IoT system and check signal from machine
- 16:50 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:39 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
28 Feb 2024
- 20:30 Tomas Tech Co.,Ltd. 5.00 hours (Project progress work #457 (Closed): NSET Stocktaking - check bug location not found.)
- 20:26 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #457 (Closed): NSET Stocktaking - check bug location not found.)
- check code & fine bug
- 19:10 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #399 (Closed): [Installation&On-site support] Production IoT system for TNF)
- check communication
- 19:09 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
- Test the signal to the dashboard and fix any signal mismatches.
- 19:08 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
- Test the signal to the dashboard and fix any signal mismatches.
- 19:08 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
- Test the signal to the dashboard and fix any signal mismatches.
- 19:07 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
- Test the signal to the dashboard and fix any signal mismatches.
- 19:04 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
- Test signal transmission to the server room.
- 19:03 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
- Test signal to dashboard
- 17:04 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 16:54 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
27 Feb 2024
- 22:05 Tomas Tech Co.,Ltd. 5.00 hours (Project progress work #455 (Closed): Meeting about display on TV with customer)
- 22:04 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #456 (Closed): Safety training of ASI at online)
- 22:02 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #454 (Closed): Internal meeting with new member (K.Jidapha))
- -Explain how to use the calendar. -Explain how to use the redmine. -Explain the database of ASI for display on TV
- 18:00 Asian Stanley. International Limited 5.00 hours (Project progress work #450 (Closed): Development web display )
- 17:57 Asian Stanley. International Limited 2.00 hours (Project progress work #450 (Closed): Development web display )
- 17:53 Asian Stanley. International Limited 2.00 hours (Project progress work #450 (Closed): Development web display )
- 16:59 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 07:58 ADVICS Manufacturing(Thailand)Co.,Ltd. 11.00 hours (Project progress work #440 (Closed): Order Sheet System PC.)
- Test and Modify Order Sheet System PC [Onstie].
26 Feb 2024
- 10:17 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- coding label function
- 10:16 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- internal meeting & design layout
23 Feb 2024
- 19:20 ADVICS Manufacturing(Thailand)Co.,Ltd. 11.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Commistioning and fix comment
- 19:20 ADVICS Manufacturing(Thailand)Co.,Ltd. 9.00 hours (Project progress work #436 (Closed): [ On-site ] Installation shipping traceability system)
- Install program order sheet and test function
- 19:18 YAMADA SOMBOON CO., LTD 8.00 hours (Sales support #453 (Closed): Machine operation by IoT)
- Meeting current concept and site survey
- 19:13 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Uninstall equipment from vertical packing machine
- 19:13 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Data link communication beetween machine to TB-Box
- 19:11 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #225 (Closed): CCTV Installation)
- Support at Site
- 19:10 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #225 (Closed): CCTV Installation)
- Support at Site
- 16:49 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #452 (Closed): POST-SALES support)
- Remove the label scan for fix the duplicated scan error
- 11:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
- design & coding label menu
- 11:33 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 07:57 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #440 (Closed): Order Sheet System PC.)
- Install Order Sheet System PC [Onstie].
22 Feb 2024
- 16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:39 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:36 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:36 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #413 (Closed): [Installation&On-site support] Software installation for Infrastructure IoT Project)
- Onsit Test wifi Jtekt
- 16:35 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #451 (Closed): Water treatment.)
- 16:34 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #451 (Closed): Water treatment.)
- Design drawing
- 16:34 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #451 (Closed): Water treatment.)
- Design drawing
- 16:33 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #451 (Closed): Water treatment.)
- Design drawing
- 08:40 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:35 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:34 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:33 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:31 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:31 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:29 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
- 08:28 Asian Stanley. International Limited 8.00 hours (Project progress work #450 (Closed): Development web display )
21 Feb 2024
- 19:13 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #442 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- 19:13 Minebea AccessSolutions Thai Ltd 5.00 hours (Project progress work #442 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- 19:13 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #442 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- 19:13 Minebea AccessSolutions Thai Ltd 14.00 hours (Project progress work #442 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- 19:09 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:09 Tomas Tech Co.,Ltd. 6.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:09 Tomas Tech Co.,Ltd. 6.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:09 Tomas Tech Co.,Ltd. 10.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:08 Tomas Tech Co.,Ltd. 3.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:08 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:08 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:08 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:07 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:06 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:06 Tomas Tech Co.,Ltd. 5.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 19:06 Tomas Tech Co.,Ltd. 5.00 hours (Sales support #449 (New): Sales for new and follow up each customer)
- 16:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Update datalink PLC KV-8000
- 16:49 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #440 (Closed): Order Sheet System PC.)
- Develop Order Sheet System PC.
- 16:45 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Meeting about progress update and reschedule
- 16:37 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #92 (Closed): [On-site support]Support after cutover)
- Fix the HT program adding about the outbound item that isn't in FIFO
- 16:35 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Final day for handy test and system check
- 10:43 Asian Stanley. International Limited 8.00 hours (Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points)
- Installation&On-site support
- 10:43 Asian Stanley. International Limited 8.00 hours (Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points)
- Installation&On-site support
- 10:42 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 10:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 10:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 10:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 10:41 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 10:41 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 10:39 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 10:39 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 10:33 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 8.00 hours (Project progress work #309 (Closed): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod)
- Check data and modify application of Traceability system Line MC25&MC26.
- 10:31 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 8.00 hours (Project progress work #309 (Closed): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod)
- install Traceability system Line MC25&MC26.
- 10:30 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 8.00 hours (Project progress work #309 (Closed): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod)
- install Traceability system Line MC25&MC26.
20 Feb 2024
- 16:53 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #440 (Closed): Order Sheet System PC.)
- Develop Order Sheet System PC.
- 15:49 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #99 (Closed): [System Testing]Handyterminal and Web)
- final test handy
- 15:47 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #447 (Closed): create manual document for MAST)
- create manual handy & web
- 15:43 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 15:43 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 15:43 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 15:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 15:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 15:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 15:41 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 11:18 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #431 (Closed): Wiring on the cabinet 18 set.)
- Wiring cable in the cabinet
- 08:55 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 08:55 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 08:55 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 08:55 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 08:54 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 08:54 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support
- 08:54 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T)
- Installation&On-site support