09 Feb 2024

17:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432: check CKD Software (LAT).
check error CKD Software. Kamol Anekchatnuntakool
09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #412: [Installation&On-site support] Hardware installation for Infrastructure IoT Project
Installation FAC3
-Lan wiring MN1,MN2
-Lanwiring CEPS1,CEPS2
-Cabinate MN1,MN2
-Cabinate CEPS1,CEPS2
Santi Srichankaew

08 Feb 2024

16:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432: check CKD Software (LAT).
check CKD Software (LAT). Kamol Anekchatnuntakool
15:42 Thai Nippon foods Co.,Ltd. Project progress work #434 (In Progress): [ Specicication and document ] for Water treatment project
Nattapol Poeam
15:42 Thai Nippon foods Co.,Ltd. Project progress work #434: [ Specicication and document ] for Water treatment project
[ Next Acction ]
Site survey 11/02/24
- Expain concept and point installation sensor to SND Team.
- Water flow met...
Nattapol Poeam
15:34 Thai Nippon foods Co.,Ltd. Project progress work #434 (Closed): [ Specicication and document ] for Water treatment project
- Schedule
- Sub Schedule
- Specification
- Data document
Nattapol Poeam
10:33 Tomas Tech Co.,Ltd. Project progress work #433 (Closed): ASI online training safety
Training safety Nattapol Poeam

07 Feb 2024

22:28 Thai Nippon foods Co.,Ltd. Project progress work #87: IoT Equipment for machine operation project
[ To day ]
- Re check data memory for addition alarm history
- Revised alarm design for all machine
- Check data m...
Nattapol Poeam
22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #428 (Close request): Servey plant installation power meter to panel control
Kittisak Isarapongporn
22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #426 (Close request): Configuration Between PLC And HMI&Dashboard
Kittisak Isarapongporn
22:10 Thai Nippon foods Co.,Ltd. Project progress work #422 (Close request): Install PLC programs
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #421 (Close request): Prepare a demo kit for a meeting at TOPRE.
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #420 (Close request): Go to a meeting at topre
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #419 (Close request): Sick leave to go to hospital
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #418 (Close request): Went to a work meeting in Rayong.
Kittisak Isarapongporn
22:10 Thai Nippon foods Co.,Ltd. Project progress work #417 (Close request): Go solve problems on site at TNF.
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #416 (Close request): Training FANUC
Kittisak Isarapongporn
22:10 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #401 (Close request): Site survey for confrim location display
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #398 (Close request): Make concept and summarize equipment for Interlock system prohect
Kittisak Isarapongporn
22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Close request): Meeting From JATH about IoT of infrastructure
Kittisak Isarapongporn
22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #370 (Close request): Install equipment & wiring in the control box 14 set.
Kittisak Isarapongporn
22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #355 (Close request): Deverlop OEE % data analysis
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Project progress work #354 (Close request): Lernning PLC Keyence KV-8000
Kittisak Isarapongporn
22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #328 (Close request): Crate IoT data collection box for JATH
Kittisak Isarapongporn
22:10 Tomas Tech Co.,Ltd. Sales support #312 (Close request): Fanuc traning and appointment Fanuc staff
Kittisak Isarapongporn
22:10 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309 (Close request): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
Kittisak Isarapongporn
22:10 ATA Casting Technology Co., Ltd. Problem-Bug #215 (Close request): Request verification of the data collection of machine
Kittisak Isarapongporn
22:10 BIG Star Co.,Ltd Sales support #209 (Close request): Shoe size sorting machine project Concept proposal
Kittisak Isarapongporn
22:10 Thai Nippon foods Co.,Ltd. Project progress work #201 (Close request): Summary of all equipment for use in the Machine operation monitoring systems project.
Kittisak Isarapongporn
22:10 Thai Nippon foods Co.,Ltd. Sales support #175 (Close request): EV charger installation project
Kittisak Isarapongporn
22:10 Asteer (Thailand) Co., Ltd. Project progress work #109 (Close request): [On-site support]Support after cutover
Kittisak Isarapongporn
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432 (In Progress): check CKD Software (LAT).
check CKD Software (LAT). Kamol Anekchatnuntakool
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432 (Closed): check CKD Software (LAT).
check CKD Software (LAT). Kamol Anekchatnuntakool
15:50 DAIFUKU (THAILAND) LTD. Project progress work #431 (Closed): Wiring on the cabinet 18 set.
Wiring on the cabinet 18 set. Suchin Viyasing

06 Feb 2024

16:48 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd Sales support #430 (Closed): Meeting about update requirment of project
[ Meeting ]
- Update requiment of project
- Update schedule of project
Nattapol Poeam
16:46 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd Sales support #429 (Closed): Meeting about update requirment of project
[ Meeting ]
- Update requirment of project
- Update schedule of project
Nattapol Poeam
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Confirmation request): Meeting From JATH about IoT of infrastructure
Meeting IOT Infrastructure Santi Srichankaew
16:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #428 (Confirmation request): Servey plant installation power meter to panel control
Meeting From JATH about IoT of infrastructure Santi Srichankaew
16:36 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #428 (Closed): Servey plant installation power meter to panel control
Servey plant installation power meter to panel control Fac 1,2,3
Servey plant installation flow meter tube air compr...
Santi Srichankaew
16:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #119: [Internal Design] DB and various functions, man-hour calculation
[ Task ]
- Test function PLC Link beeteen Fac1 to Fac3
Nattapol Poeam

05 Feb 2024

11:53 Asteer (Thailand) Co., Ltd. Project progress work #109 (Confirmation request): [On-site support]Support after cutover
Update Software. Kamol Anekchatnuntakool
10:18 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309 (Confirmation request): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
develop Traceability system Line MC25&MC26. Kamol Anekchatnuntakool

02 Feb 2024

23:55 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
1.Meeting about programming logic with
2.filter items.
Soraya Norasing
17:00 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
develop Traceability system Line MC25&MC26. Kamol Anekchatnuntakool
16:56 Keyence (Thailand) Co., Ltd. Project progress work #427 (In Progress): [ Support and install program ] for demo-kit WD
Next Action >> Wait Custumer confrim date delivery Nattapol Poeam
16:55 Keyence (Thailand) Co., Ltd. Project progress work #427 (Closed): [ Support and install program ] for demo-kit WD
Demo-kit WD Nattapol Poeam
09:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #355 (Confirmation request): Deverlop OEE % data analysis
Woraphong Wernsantiah
09:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #426 (Confirmation request): Configuration Between PLC And HMI&Dashboard
Configuration Between PLC And HMI&Dashboard Pump2&PNV Woraphong Wernsantiah
09:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #426 (Closed): Configuration Between PLC And HMI&Dashboard
Configuration Between PLC And HMI&Dashboard Pump2&PNV Woraphong Wernsantiah

01 Feb 2024

20:51 Minebea AccessSolutions Thai Ltd Project progress work #425 (Closed): Meeting with Japanese person
Ryo Nozaki
20:51 Minebea AccessSolutions Thai Ltd Project progress work #425 (Closed): Meeting with Japanese person
Ryo Nozaki
20:43 Tomas Tech Co.,Ltd. Sales support #424 (Closed): YAMATO ELECTRIC (THAILAND) CO.,LTD create proposal and qt
Ryo Nozaki
20:43 Tomas Tech Co.,Ltd. Sales support #424 (Closed): YAMATO ELECTRIC (THAILAND) CO.,LTD create proposal and qt
Ryo Nozaki
20:39 Tomas Tech Co.,Ltd. Sales support #423 (In Progress): HDK meeting and site survey about traceability system
Ryo Nozaki
20:39 Tomas Tech Co.,Ltd. Sales support #423 (In Progress): HDK meeting and site survey about traceability system
Ryo Nozaki
20:38 Tomas Tech Co.,Ltd. Sales support #386 (In Progress): Webseminar 2024/2/15
Ryo Nozaki
18:19 Minebea AccessSolutions Thai Ltd Project progress work #381: [Coding]Android handyterminal BTA500 Outbound
Work Outbound Anonymous
17:21 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
develop Traceability system Line MC25&MC26. Kamol Anekchatnuntakool
08:49 Thai Nippon foods Co.,Ltd. Project progress work #422 (Confirmation request): Install PLC programs
Install PLC programs kv studio,vt studio,GX-Work2,gt designer 3 Suthiwat Banrueangthong
08:48 Thai Nippon foods Co.,Ltd. Project progress work #422 (Closed): Install PLC programs
Install PLC programs kv studio,vt studio,GX-Work2,gt designer 3 Suthiwat Banrueangthong
08:35 Tomas Tech Co.,Ltd. Project progress work #421 (Confirmation request): Prepare a demo kit for a meeting at TOPRE.
Prepare a demo kit for a meeting at TOPRE. Suthiwat Banrueangthong
08:34 Tomas Tech Co.,Ltd. Project progress work #421 (Closed): Prepare a demo kit for a meeting at TOPRE.
Prepare a demo kit for a meeting at TOPRE. Suthiwat Banrueangthong
08:33 Tomas Tech Co.,Ltd. Project progress work #420 (Confirmation request): Go to a meeting at topre
Go to a meeting at topre Suthiwat Banrueangthong
08:32 Tomas Tech Co.,Ltd. Project progress work #420 (Closed): Go to a meeting at topre
Go to a meeting at topre Suthiwat Banrueangthong
08:30 Tomas Tech Co.,Ltd. Project progress work #419 (Confirmation request): Sick leave to go to hospital
Sick leave to go to hospital Suthiwat Banrueangthong
08:29 Tomas Tech Co.,Ltd. Project progress work #419 (Closed): Sick leave to go to hospital
Sick leave to go to hospital Suthiwat Banrueangthong
08:27 Tomas Tech Co.,Ltd. Project progress work #418 (Confirmation request): Went to a work meeting in Rayong.
Went to a work meeting in Rayong. Suthiwat Banrueangthong
08:27 Tomas Tech Co.,Ltd. Project progress work #418 (Closed): Went to a work meeting in Rayong.
Went to a work meeting in Rayong. Suthiwat Banrueangthong
08:24 Thai Nippon foods Co.,Ltd. Project progress work #417 (Confirmation request): Go solve problems on site at TNF.
Go solve problems on site at TNF. Suthiwat Banrueangthong
08:24 Thai Nippon foods Co.,Ltd. Project progress work #417 (Closed): Go solve problems on site at TNF.
Go solve problems on site at TNF. Suthiwat Banrueangthong
08:20 Tomas Tech Co.,Ltd. Project progress work #416 (Confirmation request): Training FANUC
Training FANUC Suthiwat Banrueangthong
08:19 Tomas Tech Co.,Ltd. Project progress work #416 (Closed): Training FANUC
Training FANUC Suthiwat Banrueangthong
08:07 Tomas Tech Co.,Ltd. Project progress work #354 (Confirmation request): Lernning PLC Keyence KV-8000
Lernning PLC Keyence KV-8000 Panupong Raksakit

31 Jan 2024

20:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #405: [Requirement definition] Infrastructure IoT system for Jtekt Automotive
- Expain concept to SND Team
- Expain concept master control design to K.Suchin
- Reserch data about Powermeter and CT
Nattapol Poeam
19:35 DAIFUKU (THAILAND) LTD. Sales support #415 (In Progress): [Requirement and support] Installation camera Area 1-3
Nattapol Poeam
19:33 DAIFUKU (THAILAND) LTD. Sales support #415 (Closed): [Requirement and support] Installation camera Area 1-3
Installation camera area 1-3 Nattapol Poeam
18:04 Minebea AccessSolutions Thai Ltd Project progress work #381: [Coding]Android handyterminal BTA500 Outbound
Outbound work
- print
Anonymous
17:05 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
develop Traceability system Line MC25&MC26. Kamol Anekchatnuntakool
16:56 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
test and fix label function, inbound function Soraya Norasing
15:36 Asian Stanley. International Limited Project progress work #414 (Closed): Develop new screen of dashboard
create new 3 screen.
- Production control BUDOMARI information board, this screen displays dynamic topic with user...
Tanawan Wongsa-ard
10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #413 (Closed): [Installation&On-site support] Software installation for Infrastructure IoT Project
- Installation program
- Connect device powermeter,Air flow sensor,Chiller system
Nattapol Poeam
10:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #412 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project
- Installation powermeter
- Installation Air flow sensor
- Installation and connect to chiller system
Nattapol Poeam
10:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #411 (Closed): [ Task ] Drawing design for Master control box
- Master control box design Nattapol Poeam
10:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #410 (Closed): [ Task ] Program and Dashboard Development
[ Task ]
- Program design
- Dashboard design
- Data report design
- Other function design
Nattapol Poeam
10:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #409 (Closed): [Installation&On-site support] Production IoT system for JATH
Installation IoT system for final line Nattapol Poeam
10:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #408 (Closed): [Installation&On-site support] Production IoT system for JATH
Installation IoT for Final line Project Nattapol Poeam
10:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH
Installation IoT System Nattapol Poeam
08:06 Thai Nippon foods Co.,Ltd. Project progress work #403 (In Progress): Summarize equipment of Water treatment project
Nattapol Poeam
 

Also available in: Atom