Activity
From 31 Jan 2024 to 09 Feb 2024
09 Feb 2024
- 17:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432: check CKD Software (LAT).
- check error CKD Software.
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #412: [Installation&On-site support] Hardware installation for Infrastructure IoT Project
- Installation FAC3
-Lan wiring MN1,MN2
-Lanwiring CEPS1,CEPS2
-Cabinate MN1,MN2
-Cabinate CEPS1,CEPS2
08 Feb 2024
- 16:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432: check CKD Software (LAT).
- check CKD Software (LAT).
- 15:42 Thai Nippon foods Co.,Ltd. Project progress work #434 (In Progress): [ Specicication and document ] for Water treatment project
- 15:42 Thai Nippon foods Co.,Ltd. Project progress work #434: [ Specicication and document ] for Water treatment project
- [ Next Acction ]
Site survey 11/02/24
- Expain concept and point installation sensor to SND Team.
- Water flow met... - 15:34 Thai Nippon foods Co.,Ltd. Project progress work #434 (Closed): [ Specicication and document ] for Water treatment project
- - Schedule
- Sub Schedule
- Specification
- Data document - 10:33 Tomas Tech Co.,Ltd. Project progress work #433 (Closed): ASI online training safety
- Training safety
07 Feb 2024
- 22:28 Thai Nippon foods Co.,Ltd. Project progress work #87: IoT Equipment for machine operation project
- [ To day ]
- Re check data memory for addition alarm history
- Revised alarm design for all machine
- Check data m... - 22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #428 (Close request): Servey plant installation power meter to panel control
- 22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #426 (Close request): Configuration Between PLC And HMI&Dashboard
- 22:10 Thai Nippon foods Co.,Ltd. Project progress work #422 (Close request): Install PLC programs
- 22:10 Tomas Tech Co.,Ltd. Project progress work #421 (Close request): Prepare a demo kit for a meeting at TOPRE.
- 22:10 Tomas Tech Co.,Ltd. Project progress work #420 (Close request): Go to a meeting at topre
- 22:10 Tomas Tech Co.,Ltd. Project progress work #419 (Close request): Sick leave to go to hospital
- 22:10 Tomas Tech Co.,Ltd. Project progress work #418 (Close request): Went to a work meeting in Rayong.
- 22:10 Thai Nippon foods Co.,Ltd. Project progress work #417 (Close request): Go solve problems on site at TNF.
- 22:10 Tomas Tech Co.,Ltd. Project progress work #416 (Close request): Training FANUC
- 22:10 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #401 (Close request): Site survey for confrim location display
- 22:10 Tomas Tech Co.,Ltd. Project progress work #398 (Close request): Make concept and summarize equipment for Interlock system prohect
- 22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Close request): Meeting From JATH about IoT of infrastructure
- 22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #370 (Close request): Install equipment & wiring in the control box 14 set.
- 22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #355 (Close request): Deverlop OEE % data analysis
- 22:10 Tomas Tech Co.,Ltd. Project progress work #354 (Close request): Lernning PLC Keyence KV-8000
- 22:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #328 (Close request): Crate IoT data collection box for JATH
- 22:10 Tomas Tech Co.,Ltd. Sales support #312 (Close request): Fanuc traning and appointment Fanuc staff
- 22:10 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309 (Close request): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
- 22:10 ATA Casting Technology Co., Ltd. Problem-Bug #215 (Close request): Request verification of the data collection of machine
- 22:10 BIG Star Co.,Ltd Sales support #209 (Close request): Shoe size sorting machine project Concept proposal
- 22:10 Thai Nippon foods Co.,Ltd. Project progress work #201 (Close request): Summary of all equipment for use in the Machine operation monitoring systems project.
- 22:10 Thai Nippon foods Co.,Ltd. Sales support #175 (Close request): EV charger installation project
- 22:10 Asteer (Thailand) Co., Ltd. Project progress work #109 (Close request): [On-site support]Support after cutover
- 16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432 (In Progress): check CKD Software (LAT).
- check CKD Software (LAT).
- 16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #432 (Closed): check CKD Software (LAT).
- check CKD Software (LAT).
- 15:50 DAIFUKU (THAILAND) LTD. Project progress work #431 (Closed): Wiring on the cabinet 18 set.
- Wiring on the cabinet 18 set.
06 Feb 2024
- 16:48 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd Sales support #430 (Closed): Meeting about update requirment of project
- [ Meeting ]
- Update requiment of project
- Update schedule of project - 16:46 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd Sales support #429 (Closed): Meeting about update requirment of project
- [ Meeting ]
- Update requirment of project
- Update schedule of project - 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Confirmation request): Meeting From JATH about IoT of infrastructure
- Meeting IOT Infrastructure
- 16:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #428 (Confirmation request): Servey plant installation power meter to panel control
- Meeting From JATH about IoT of infrastructure
- 16:36 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #428 (Closed): Servey plant installation power meter to panel control
- Servey plant installation power meter to panel control Fac 1,2,3
Servey plant installation flow meter tube air compr... - 16:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #119: [Internal Design] DB and various functions, man-hour calculation
- [ Task ]
- Test function PLC Link beeteen Fac1 to Fac3
05 Feb 2024
- 11:53 Asteer (Thailand) Co., Ltd. Project progress work #109 (Confirmation request): [On-site support]Support after cutover
- Update Software.
- 10:18 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309 (Confirmation request): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
- develop Traceability system Line MC25&MC26.
02 Feb 2024
- 23:55 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- 1.Meeting about programming logic with
2.filter items. - 17:00 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
- develop Traceability system Line MC25&MC26.
- 16:56 Keyence (Thailand) Co., Ltd. Project progress work #427 (In Progress): [ Support and install program ] for demo-kit WD
- Next Action >> Wait Custumer confrim date delivery
- 16:55 Keyence (Thailand) Co., Ltd. Project progress work #427 (Closed): [ Support and install program ] for demo-kit WD
- Demo-kit WD
- 09:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #355 (Confirmation request): Deverlop OEE % data analysis
- 09:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #426 (Confirmation request): Configuration Between PLC And HMI&Dashboard
- Configuration Between PLC And HMI&Dashboard Pump2&PNV
- 09:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #426 (Closed): Configuration Between PLC And HMI&Dashboard
- Configuration Between PLC And HMI&Dashboard Pump2&PNV
01 Feb 2024
- 20:51 Minebea AccessSolutions Thai Ltd Project progress work #425 (Closed): Meeting with Japanese person
- 20:51 Minebea AccessSolutions Thai Ltd Project progress work #425 (Closed): Meeting with Japanese person
- 20:43 Tomas Tech Co.,Ltd. Sales support #424 (Closed): YAMATO ELECTRIC (THAILAND) CO.,LTD create proposal and qt
- 20:43 Tomas Tech Co.,Ltd. Sales support #424 (Closed): YAMATO ELECTRIC (THAILAND) CO.,LTD create proposal and qt
- 20:39 Tomas Tech Co.,Ltd. Sales support #423 (In Progress): HDK meeting and site survey about traceability system
- 20:39 Tomas Tech Co.,Ltd. Sales support #423 (In Progress): HDK meeting and site survey about traceability system
- 20:38 Tomas Tech Co.,Ltd. Sales support #386 (In Progress): Webseminar 2024/2/15
- 18:19 Minebea AccessSolutions Thai Ltd Project progress work #381: [Coding]Android handyterminal BTA500 Outbound
- Work Outbound
- 17:21 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
- develop Traceability system Line MC25&MC26.
- 08:49 Thai Nippon foods Co.,Ltd. Project progress work #422 (Confirmation request): Install PLC programs
- Install PLC programs kv studio,vt studio,GX-Work2,gt designer 3
- 08:48 Thai Nippon foods Co.,Ltd. Project progress work #422 (Closed): Install PLC programs
- Install PLC programs kv studio,vt studio,GX-Work2,gt designer 3
- 08:35 Tomas Tech Co.,Ltd. Project progress work #421 (Confirmation request): Prepare a demo kit for a meeting at TOPRE.
- Prepare a demo kit for a meeting at TOPRE.
- 08:34 Tomas Tech Co.,Ltd. Project progress work #421 (Closed): Prepare a demo kit for a meeting at TOPRE.
- Prepare a demo kit for a meeting at TOPRE.
- 08:33 Tomas Tech Co.,Ltd. Project progress work #420 (Confirmation request): Go to a meeting at topre
- Go to a meeting at topre
- 08:32 Tomas Tech Co.,Ltd. Project progress work #420 (Closed): Go to a meeting at topre
- Go to a meeting at topre
- 08:30 Tomas Tech Co.,Ltd. Project progress work #419 (Confirmation request): Sick leave to go to hospital
- Sick leave to go to hospital
- 08:29 Tomas Tech Co.,Ltd. Project progress work #419 (Closed): Sick leave to go to hospital
- Sick leave to go to hospital
- 08:27 Tomas Tech Co.,Ltd. Project progress work #418 (Confirmation request): Went to a work meeting in Rayong.
- Went to a work meeting in Rayong.
- 08:27 Tomas Tech Co.,Ltd. Project progress work #418 (Closed): Went to a work meeting in Rayong.
- Went to a work meeting in Rayong.
- 08:24 Thai Nippon foods Co.,Ltd. Project progress work #417 (Confirmation request): Go solve problems on site at TNF.
- Go solve problems on site at TNF.
- 08:24 Thai Nippon foods Co.,Ltd. Project progress work #417 (Closed): Go solve problems on site at TNF.
- Go solve problems on site at TNF.
- 08:20 Tomas Tech Co.,Ltd. Project progress work #416 (Confirmation request): Training FANUC
- Training FANUC
- 08:19 Tomas Tech Co.,Ltd. Project progress work #416 (Closed): Training FANUC
- Training FANUC
- 08:07 Tomas Tech Co.,Ltd. Project progress work #354 (Confirmation request): Lernning PLC Keyence KV-8000
- Lernning PLC Keyence KV-8000
31 Jan 2024
- 20:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #405: [Requirement definition] Infrastructure IoT system for Jtekt Automotive
- - Expain concept to SND Team
- Expain concept master control design to K.Suchin
- Reserch data about Powermeter and CT - 19:35 DAIFUKU (THAILAND) LTD. Sales support #415 (In Progress): [Requirement and support] Installation camera Area 1-3
- 19:33 DAIFUKU (THAILAND) LTD. Sales support #415 (Closed): [Requirement and support] Installation camera Area 1-3
- Installation camera area 1-3
- 18:04 Minebea AccessSolutions Thai Ltd Project progress work #381: [Coding]Android handyterminal BTA500 Outbound
- Outbound work
- print
- 17:05 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
- develop Traceability system Line MC25&MC26.
- 16:56 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- test and fix label function, inbound function
- 15:36 Asian Stanley. International Limited Project progress work #414 (Closed): Develop new screen of dashboard
- create new 3 screen.
- Production control BUDOMARI information board, this screen displays dynamic topic with user... - 10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #413 (Closed): [Installation&On-site support] Software installation for Infrastructure IoT Project
- - Installation program
- Connect device powermeter,Air flow sensor,Chiller system - 10:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #412 (Closed): [Installation&On-site support] Hardware installation for Infrastructure IoT Project
- - Installation powermeter
- Installation Air flow sensor
- Installation and connect to chiller system - 10:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #411 (Closed): [ Task ] Drawing design for Master control box
- - Master control box design
- 10:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #410 (Closed): [ Task ] Program and Dashboard Development
- [ Task ]
- Program design
- Dashboard design
- Data report design
- Other function design - 10:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #409 (Closed): [Installation&On-site support] Production IoT system for JATH
- Installation IoT system for final line
- 10:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #408 (Closed): [Installation&On-site support] Production IoT system for JATH
- Installation IoT for Final line Project
- 10:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #407 (Closed): [Installation&On-site support] Production IoT system for JATH
- Installation IoT System
- 08:06 Thai Nippon foods Co.,Ltd. Project progress work #403 (In Progress): Summarize equipment of Water treatment project