From 21 Jan 2024 to 30 Jan 2024

30 Jan 2024

21:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #405 (In Progress): [Requirement definition] Infrastructure IoT system for Jtekt Automotive
Nattapol Poeam
21:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive
Infrastructure IoT Project
- Kick off meeting
- Site servey
Next action
- Make drawing diagram of Control box mas...
Nattapol Poeam
21:30 DAIFUKU (THAILAND) LTD. Project progress work #406 (In Progress): Prepare equipment for installation for Area1
Nattapol Poeam
21:29 DAIFUKU (THAILAND) LTD. Project progress work #406 (Closed): Prepare equipment for installation for Area1
Prepare equipment for installation Area 1-3 Nattapol Poeam
21:17 Tomas Tech Co.,Ltd. Sales support #404 (In Progress): OTICS (Thailand) Company Limited meeting about IoT system and site servey
Nattapol Poeam
21:15 Tomas Tech Co.,Ltd. Sales support #404 (In Progress): OTICS (Thailand) Company Limited meeting about IoT system and site servey
Site survey
- MDB and panel control point
Next acction
- Make concept and summarize equipment
Nattapol Poeam
21:11 Tomas Tech Co.,Ltd. Sales support #33 (Closed): [FY2023]Common management for Anek
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #32 (Closed): [FY2023]Common management for Yutthapong
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #31 (Closed): [FY2023]Common management for Santi
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #30 (Closed): [FY2023]Common management for Nattapol
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #29 (Closed): [FY2023]Common management for Narupot
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #28 (Closed): [FY2023]Common management for Kittisak
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #27 (Closed): [FY2023]Common management for Kamol
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #26 (Closed): [FY2023]Common management for Atchai
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #25 (Closed): [FY2023]Common management for Arunwit
Ryo Nozaki
21:11 Tomas Tech Co.,Ltd. Sales support #20 (Closed): [FY2023]Common management for Soraya
Ryo Nozaki
21:10 Tomas Tech Co.,Ltd. Project progress work #398 (Confirmation request): Make concept and summarize equipment for Interlock system prohect
Nattapol Poeam
20:18 Tomas Tech Co.,Ltd. Project progress work #398 (Closed): Make concept and summarize equipment for Interlock system prohect
- Make and summarize concept.
- Summarize equipment.
Nattapol Poeam
21:07 Thai Nippon foods Co.,Ltd. Project progress work #403 (Closed): Summarize equipment of Water treatment project
summarize equipment Nattapol Poeam
21:04 Thai Nippon foods Co.,Ltd. Sales support #86 (In Progress): IoT Equipment for Water treatment project
Nattapol Poeam
21:00 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #402 (Closed): Modification program for record S/N to CF-Card
[ Task ]
- Add program for record data to cf-card
- Config camera SRX-300
Nattapol Poeam
20:55 NTPT Company Limited. Project progress work #385 (Closed): NTPT Asprova introduce and demo meeting
Ryo Nozaki
20:55 Ebisu Foods Co Ltd. Project progress work #383 (Closed): Develop modify the master management module
Ryo Nozaki
20:55 A.N.I. LOGISTICS, LTD. Problem-Bug #371 (Closed): Inquiry the data about the date time of OUTER scan
Ryo Nozaki
20:55 Thai Nippon foods Co.,Ltd. Project progress work #360 (Closed): Leave of absence.
Ryo Nozaki
20:55 Thai Nippon foods Co.,Ltd. Project progress work #359 (Closed): sick leave
Ryo Nozaki
20:55 Thai Nippon foods Co.,Ltd. Project progress work #357 (Closed): sick leave.
Ryo Nozaki
20:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC
Ryo Nozaki
20:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #345 (Closed): Design ,Install & Wiring in control box
Ryo Nozaki
16:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #345 (Close request): Design ,Install & Wiring in control box
Kittisak Isarapongporn
16:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #345 (Confirmation request): Design ,Install & Wiring in control box
Suchin Viyasing
20:55 Tomas Tech Co.,Ltd. Sales support #315 (Closed): Shimizu correct 2 machines data from Takamatsu Mazak and sumaraize concept 27th
Ryo Nozaki
20:55 Tomas Tech Co.,Ltd. Project progress work #308 (Closed): Review and learn the source code of the project.
Ryo Nozaki
20:55 ACME INDUSTRY CO.,LTD. Project progress work #266 (Closed): Make manual document for Pegasus
Ryo Nozaki
20:55 A.N.I. LOGISTICS, LTD. Problem-Bug #214 (Closed): Found the problem with the handy being able to scan the other label [STAGING AREA]
Ryo Nozaki
20:55 Minebea AccessSolutions Thai Ltd Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation
Ryo Nozaki
20:55 ACME INDUSTRY CO.,LTD. Project progress work #52 (Closed): Issue topics
Ryo Nozaki
20:55 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #356 (In Progress): Checking Process.
Must be use PJ240003 Ryo Nozaki
20:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #355 (In Progress): Deverlop OEE % data analysis
Must be use PJ230055 Ryo Nozaki
20:53 Tomas Tech Co.,Ltd. Project progress work #377 (In Progress): Demo Dashboard CKD Pressure monitor
Must be using internal project Ryo Nozaki
20:53 Ebisu Foods Co Ltd. Project progress work #384 (In Progress): meeting on site
Must be using PJ230025 Ryo Nozaki
20:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (In Progress): Meeting From JATH about IoT of infrastructure
Ryo Nozaki
20:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396: Meeting From JATH about IoT of infrastructure
Must be using PJ240004 Ryo Nozaki
16:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Close request): Meeting From JATH about IoT of infrastructure
Kittisak Isarapongporn
08:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Confirmation request): Meeting From JATH about IoT of infrastructure
Meeting IoT of infrastructure Santi Srichankaew
08:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #396 (Closed): Meeting From JATH about IoT of infrastructure
Meeting From JATH about IoT of infrastructure
Servey plant installation powermeter.
Confirmation scope of work.
Santi Srichankaew
20:52 Tomas Tech Co.,Ltd. Sales support #269: Automation for receiving and shipping of Fabrinet
Concept design
1. Received
2. Shipping
Nattapol Poeam
20:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #328 (Confirmation request): Crate IoT data collection box for JATH
Nattapol Poeam
20:45 Tomas Tech Co.,Ltd. Sales support #312 (Confirmation request): Fanuc traning and appointment Fanuc staff
Nattapol Poeam
20:39 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #401 (Confirmation request): Site survey for confrim location display
Nattapol Poeam
20:38 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #401 (Closed): Site survey for confrim location display
Confrim scope work and location display Nattapol Poeam
20:34 Thai Nippon foods Co.,Ltd. Project progress work #400 (Closed): Program developer and Dashboard design
Program developer and Dashboard design Nattapol Poeam
20:30 Thai Nippon foods Co.,Ltd. Project progress work #399 (Closed): [Installation&On-site support] Production IoT system for TNF
Installation IoT sytem for Machine operation monitoring system project Nattapol Poeam
20:26 Thai Nippon foods Co.,Ltd. Sales support #175 (Confirmation request): EV charger installation project
Nattapol Poeam
20:24 Thai Nippon foods Co.,Ltd. Project progress work #201 (Confirmation request): Summary of all equipment for use in the Machine operation monitoring systems project.
Nattapol Poeam
20:23 BIG Star Co.,Ltd Sales support #209 (Confirmation request): Shoe size sorting machine project Concept proposal
Nattapol Poeam
20:03 ATA Casting Technology Co., Ltd. Problem-Bug #215 (Confirmation request): Request verification of the data collection of machine
Nattapol Poeam
17:01 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309: [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
develop Traceability system Line MC25&MC26. Kamol Anekchatnuntakool
16:53 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #397 (In Progress): Wiring cable in the cabinet
Suchin Viyasing
16:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #397 (Closed): Wiring cable in the cabinet
Wiring cable in the cabinet
Suchin Viyasing
16:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #370 (Confirmation request): Install equipment & wiring in the control box 14 set.
Suchin Viyasing
08:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #141: [Task]Deverlop HMI Bekido and OA monitoring
Deverlop dashboard bekido all function any line operation 80%
1.web dasboard XD-02 data ling display creat module G...
Santi Srichankaew

29 Jan 2024

21:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #395 (In Progress): [Requirement definition] Infrastructure IoT system for Jtekt Automotive
Ryo Nozaki
21:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #395 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive
Ryo Nozaki
21:06 Tomas Tech Co.,Ltd. Sales support #394 (Closed): OTICS (Thailand) Company Limited meeting about IoT system and site servey
Ryo Nozaki
21:06 Tomas Tech Co.,Ltd. Sales support #394 (Closed): OTICS (Thailand) Company Limited meeting about IoT system and site servey
Ryo Nozaki
21:04 ACME INDUSTRY CO.,LTD. Project progress work #393 (Closed): Meeting with ACME INDUSTRY CO.,LTD and site survey and teaching for customer
Ryo Nozaki
21:04 ACME INDUSTRY CO.,LTD. Project progress work #393 (In Progress): Meeting with ACME INDUSTRY CO.,LTD and site survey and teaching for customer
Ryo Nozaki
21:02 ACME INDUSTRY CO.,LTD. Project progress work #393 (Closed): Meeting with ACME INDUSTRY CO.,LTD and site survey and teaching for customer
Ryo Nozaki
21:02 ACME INDUSTRY CO.,LTD. Project progress work #393 (Closed): Meeting with ACME INDUSTRY CO.,LTD and site survey and teaching for customer
Ryo Nozaki
21:00 Tomas Tech Co.,Ltd. Sales support #392 (Closed): Meeting at 25th Jan
Ryo Nozaki
20:59 Tomas Tech Co.,Ltd. Sales support #392 (Closed): Meeting at 25th Jan
YAMATO ELECTRIC (THAILAND) CO.,LTD. meeting about Lock system at Ayuttaya
Topre (Thailand) Co., Ltd. meeting at Topre
Ryo Nozaki
20:55 Tomas Tech Co.,Ltd. Sales support #391 (Closed): Meeting at 24th Jan
Ryo Nozaki
20:55 Tomas Tech Co.,Ltd. Sales support #391 (Closed): Meeting at 24th Jan
TOKYO SANGYO (THAILAND) CO.,LTD. Oka meeting at MS teams
Siam Denso manufacturing meeting at SDM office
MAS-T pick...
Ryo Nozaki
20:51 Tomas Tech Co.,Ltd. Sales support #390 (Closed): Meeting with Wing arc and Nakamura Kikho
Ryo Nozaki
20:50 Tomas Tech Co.,Ltd. Sales support #390 (Closed): Meeting with Wing arc and Nakamura Kikho
Ryo Nozaki
20:48 Tomas Tech Co.,Ltd. Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus
Ryo Nozaki
20:47 Tomas Tech Co.,Ltd. Sales support #389 (In Progress): THAI MATTO NS CO., LTD. proposal for Pegasus
Ryo Nozaki
20:36 Sekiden (Thailand)Co.,Ltd. Sales support #388 (Closed): Proposal meeting at Sekiden
Ryo Nozaki
20:36 Sekiden (Thailand)Co.,Ltd. Sales support #388 (Closed): Proposal meeting at Sekiden
Currently, the work performed by Mizuno has been simplified by Kuroda. We are solving this problem using Excel. Ryo Nozaki
20:33 Tomas Tech Co.,Ltd. Sales support #387 (In Progress): Samurai asia film movie and interview
Ryo Nozaki
20:33 Tomas Tech Co.,Ltd. Sales support #387 (Closed): Samurai asia film movie and interview
Ryo Nozaki
20:29 Tomas Tech Co.,Ltd. Sales support #386 (Closed): Webseminar 2024/2/15
Ryo Nozaki
20:29 Tomas Tech Co.,Ltd. Sales support #374 (Closed): Meeting with CCI Automotive and proposal IoT system for Tank
Ryo Nozaki
17:19 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #309 (In Progress): [Requirement definition] Knuckle Line MC25&MC26 Traceability system mod
develop Traceability system Line MC25&MC26. Kamol Anekchatnuntakool
16:48 NTPT Company Limited. Project progress work #385 (Close request): NTPT Asprova introduce and demo meeting
Kittisak Isarapongporn
16:48 NTPT Company Limited. Project progress work #385 (Closed): NTPT Asprova introduce and demo meeting
Kittisak Isarapongporn

26 Jan 2024

17:19 Minebea AccessSolutions Thai Ltd Project progress work #96 (Close request): [Internal Design] DB and various functions, man-hour calculation
Kittisak Isarapongporn
17:05 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
Develop Inner packing screen function C#. Kamol Anekchatnuntakool

25 Jan 2024

17:00 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
Develop Inner packing screen function C#.
% Done 75 %
Kamol Anekchatnuntakool

24 Jan 2024

16:51 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:33 Ebisu Foods Co Ltd. Project progress work #384 (Close request): meeting on site
Kittisak Isarapongporn
15:29 Ebisu Foods Co Ltd. Project progress work #384 (Confirmation request): meeting on site
Tanawan Wongsa-ard
15:27 Ebisu Foods Co Ltd. Project progress work #384 (In Progress): meeting on site
Tanawan Wongsa-ard
15:27 Ebisu Foods Co Ltd. Project progress work #384 (Closed): meeting on site
meeting on site for tacking in progress Tanawan Wongsa-ard
16:33 Ebisu Foods Co Ltd. Project progress work #383 (Close request): Develop modify the master management module
Kittisak Isarapongporn
16:18 Ebisu Foods Co Ltd. Project progress work #383 (Confirmation request): Develop modify the master management module
Tanawan Wongsa-ard
15:23 Ebisu Foods Co Ltd. Project progress work #383 (In Progress): Develop modify the master management module
Tanawan Wongsa-ard
15:22 Ebisu Foods Co Ltd. Project progress work #383 (Confirmation request): Develop modify the master management module
Tanawan Wongsa-ard
15:22 Ebisu Foods Co Ltd. Project progress work #383 (In Progress): Develop modify the master management module
Tanawan Wongsa-ard
15:21 Ebisu Foods Co Ltd. Project progress work #383: Develop modify the master management module
Add Location and Business Partner to the menu Tanawan Wongsa-ard
16:33 Tomas Tech Co.,Ltd. Project progress work #377 (Close request): Demo Dashboard CKD Pressure monitor
Kittisak Isarapongporn
16:33 Tomas Tech Co.,Ltd. Sales support #315 (Close request): Shimizu correct 2 machines data from Takamatsu Mazak and sumaraize concept 27th
Kittisak Isarapongporn
15:36 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
create action plan and diagram Tanawan Wongsa-ard
15:31 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
transfer issue Tanawan Wongsa-ard

23 Jan 2024

16:53 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
Develop Inner packing screen function C#.
% Done 65 %
Kamol Anekchatnuntakool
16:20 Minebea AccessSolutions Thai Ltd Project progress work #381 (In Progress): [Coding]Android handyterminal BTA500 Outbound
Anonymous
10:20 Minebea AccessSolutions Thai Ltd Project progress work #381 (Closed): [Coding]Android handyterminal BTA500 Outbound
Outbound ,Qc Anonymous
15:45 Ebisu Foods Co Ltd. Project progress work #383 (Closed): Develop modify the master management module
Leand and customize the menu to include functions related to business partners and hide the menu items related to cus... Tanawan Wongsa-ard
10:23 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #382 (Closed): Label format vietnam
fix Anonymous

22 Jan 2024

16:54 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
15:55 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #380 (Closed): Support And Fix
Support And Fix Anonymous
15:37 ACME INDUSTRY CO.,LTD. Project progress work #379 (Closed): support ACME INDUSTRY CO.,LTD.
support Anonymous
15:27 Ebisu Foods Co Ltd. Project progress work #378 (Closed): support Ebisu
meeting Anonymous
09:39 Tomas Tech Co.,Ltd. Project progress work #377 (Confirmation request): Demo Dashboard CKD Pressure monitor
Demo Dashboard CKD Pressure monitor. Woraphong Wernsantiah
08:30 Tomas Tech Co.,Ltd. Project progress work #377: Demo Dashboard CKD Pressure monitor
Demo Dashboard CKD Pressure monitor Woraphong Wernsantiah
08:13 Tomas Tech Co.,Ltd. Project progress work #377 (Closed): Demo Dashboard CKD Pressure monitor
Demo Dashboard CKD Pressure monitor. Woraphong Wernsantiah
08:33 Tomas Tech Co.,Ltd. Sales support #315 (Confirmation request): Shimizu correct 2 machines data from Takamatsu Mazak and sumaraize concept 27th
Shimizu correct 2 machines data from Takamatsu Mazak and sumaraize concept 27th Woraphong Wernsantiah
08:31 Tomas Tech Co.,Ltd. Sales support #315: Shimizu correct 2 machines data from Takamatsu Mazak and sumaraize concept 27th
Shimizu correct 2 machines data from Takamatsu Mazak and sumaraize concept 27th Woraphong Wernsantiah
08:14 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #356 (Close request): Checking Process.
Kittisak Isarapongporn
08:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #349 (Close request): Test WiFi data transmission between PLC to PLC
Kittisak Isarapongporn
08:14 Tomas Tech Co.,Ltd. Project progress work #308 (Close request): Review and learn the source code of the project.
Kittisak Isarapongporn
 