From 19 Dec 2023 to 28 Dec 2023

28 Dec 2023

17:05 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #344 (Closed): Learning Keyence PLC JTEKT IOT.)
Suchin Viyasing
16:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #344 (Closed): Learning Keyence PLC JTEKT IOT.)
Leaning Keyence Plc Project IOT JTEKT. Suchin Viyasing
13:06 BIG Star Co.,Ltd 8.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
Review 3D Design and summarize concept Nattapol Poeam
12:34 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Kittisak Isarapongporn
12:33 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn
12:33 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn
12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn
12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn
12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn
12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn
12:31 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Create report for stock Kittisak Isarapongporn

27 Dec 2023

17:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
16:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
[Fllow] #141 ==> http://node25444-tom-demo-01.proen.app.ruk-com.cloud:11447/issues/141 Santi Srichankaew
15:20 Minebea AccessSolutions Thai Ltd 2.00 hours (Project progress work #106 (Closed): [System Testing]ST with AS400)
Test Import 6 Files OK krub. Kamol Anekchatnuntakool

26 Dec 2023

22:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
19:46 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Problem-Bug #343 (Closed): Add new model of Packing process)
Add model complete Nattapol Poeam
16:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #341 (Closed): Price compare from supplier & Design drawing)
Suchin Viyasing
10:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
KV8000 Touch display and XD02 monitor screen Santi Srichankaew
10:39 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
10:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
10:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Bekido monitoring HMI register data Santi Srichankaew

25 Dec 2023

22:19 Asian Stanley. International Limited 2.00 hours (Project progress work #342 (Closed): Found a problem, unable to issue a report.)
Soraya Norasing
22:11 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
22:11 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
edit code inbound detail page and coding label schedule Soraya Norasing
21:31 Thai Nippon foods Co.,Ltd. 2.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
21:29 Pandora Production Co., Ltd. 1.00 hour (Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project)
Order equipment Nattapol Poeam
21:26 Thai Nippon foods Co.,Ltd. 7.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
Prepare equipment Nattapol Poeam
21:25 Thai Nippon foods Co.,Ltd. 1.00 hour (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
Prepare equipment Nattapol Poeam
21:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
Summarize concept and equipment Nattapol Poeam
16:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #341 (Closed): Price compare from supplier & Design drawing)
Suchin Viyasing
16:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool

24 Dec 2023

15:46 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
Installation TB-Box 1 and TB-Box 2 in Plant B Nattapol Poeam
15:44 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
Prepare equipment and make drawing I/O for explain FN TECH Team connect to machine Nattapol Poeam
15:24 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
Installation TB-Box1 plant A Nattapol Poeam
14:56 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
Installation TB-Box 2 in plant A Nattapol Poeam
15:43 Pandora Production Co., Ltd. 8.00 hours (Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project)
Assembly stand set and installation at pandora complete ( K.Pakorn ) Next action wait schedule customer for tranning ... Nattapol Poeam
15:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #225 (Closed): CCTV Installation)
Confrim position CCTV camera and Display mounting position with K.Khwanchai and Fac.Team Nattapol Poeam
15:37 Thai Honda Manufacturing Co., Ltd 3.00 hours (Project progress work #340 (Closed): Thai honda meeting)
Meeting and present IoT system Nattapol Poeam
15:35 TAKEBE(THAILAND)CO.,LTD. 4.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
Meeting and test device flow pressure and regulator for create demo-test at office next action make demo dash board a... Nattapol Poeam
15:31 ATA Casting Technology Co., Ltd. 5.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Service and site to clear concept send and receive data from machine to PLC Tracability final line Nattapol Poeam
15:22 ATA Casting Technology Co., Ltd. 9.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Service and site to clear concept send and receive data from machine to PLC Tracability final line Nattapol Poeam
15:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
Meeting and site survey and JATH Factory about box collect data and Change display Nattapol Poeam
15:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
Meeting and site survey and JATH Factory about box collect data and Change display Nattapol Poeam
15:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Meeting about presentation specification_R1 Nattapol Poeam
15:16 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #339 (Closed): Shimizu meeting about present proposal IoT systems)
meeting about presentation IoT System and site survey at site Nattapol Poeam
15:08 IIDA SEIMITSU (THAILAND) CO., LTD. 5.00 hours (Sales support #313 (Closed): IIDA wring quote for customer from SND)
Site survey about check information machine and site area Nattapol Poeam
15:02 Tomas Tech Co.,Ltd. 6.00 hours (Sales support #269 (Closed): Automation for receiving and shipping of Fabrinet )
Site survey with keyence team and Kanyakorn team about concept receiving and shipping process Nattapol Poeam
14:55 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Design and prepare equipment for installation TB-Box Nattapol Poeam

23 Dec 2023

16:46 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Develop the output settings in cells in an Excel sheet. Kamol Anekchatnuntakool
16:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #332 (Closed): Price compare from supplier & Design drawing)
Suchin Viyasing
14:25 DENSO Philippines Corporation 6.00 hours (Project progress work #22 (Closed): Make specification document for project)
Make meetinng document Ryo Nozaki
14:24 DENSO Philippines Corporation 2.00 hours (Project progress work #22 (Closed): Make specification document for project)
Meeting with Denso and Meiji Ryo Nozaki
14:23 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #338 (Closed): ASAHIKASEI PLASTICS (THAILAND) CO.,LTD. meeting with Mr.Ikenaga)
Ryo Nozaki
14:18 Thai Nippon foods Co.,Ltd. 3.00 hours (Sales support #337 (Closed): Greeting meeting with Mr.Maruyama and Mr.Kobayashi)
Meeting with Mr.Kobayashi and Mr.Maruyama Ryo Nozaki
14:16 Nidec Techno Motor (Thailand) Co.,Ltd. 3.00 hours (Sales support #336 (Closed): NSET greeting meeting and give new year gift)
Meeting Ryo Nozaki
14:13 A.N.I. LOGISTICS, LTD. 3.00 hours (Sales support #335 (Closed): ANI meeting with Mr.Matsushima)
Meeting with Matsushima Ryo Nozaki
14:11 ATA Casting Technology Co., Ltd. 3.00 hours (Project progress work #334 (Closed): ATA meeting new year and greeting)
Meeitng and feedback Delta traceability system Ryo Nozaki
14:10 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #333 (Closed): Patlite meeting and greeting new year)
Meeting with K.Fujii Ryo Nozaki

22 Dec 2023

22:17 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
22:16 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
coding inbound detail page Soraya Norasing
19:07 Asian Stanley. International Limited 0.00 hour (Project progress work #325 (Closed): Test the report)
Soraya Norasing
16:06 Asian Stanley. International Limited 2.00 hours (Project progress work #325 (Closed): Test the report)
test report with customer and instaill plcc line Soraya Norasing
17:19 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #308 (Closed): Review and learn the source code of the project.)
Tanawan Wongsa-ard
16:46 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Develop the output settings in cells in an Excel sheet. Kamol Anekchatnuntakool
16:11 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #331 (Closed): Wiring cable in the cabinet)
Suchin Viyasing
16:05 A.N.I. LOGISTICS, LTD. 0.00 hour (Problem-Bug #253 (Closed): Found a problem of not being able to use the tablet when the internet was down.)
Soraya Norasing
12:30 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Create the new spec release 7 and update the TO-DO list Kittisak Isarapongporn
12:27 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Test and check the stocktaking on handy and web functions Kittisak Isarapongporn

21 Dec 2023

16:56 ATA Casting Technology Co., Ltd. 8.00 hours (Project progress work #322 (Closed): Insert data part NG packageing at QC )
Finish Santi Srichankaew
16:49 Pandora Production Co., Ltd. 8.00 hours (Project progress work #329 (Closed): Install equipment in the small box.)
Suchin Viyasing
16:47 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Develop the output settings in cells in an Excel sheet. Kamol Anekchatnuntakool
16:43 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Programming the backend API Kittisak Isarapongporn
16:42 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Update manual document for Handy revision 4 and migrate the system to production server Kittisak Isarapongporn
16:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Modify handy application added 4 functions and issue new release version 1.1.8 Kittisak Isarapongporn
08:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #323 (Closed): Design equipment in the cabinet)
Design drawing Suchin Viyasing

20 Dec 2023

19:32 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Develop the output settings in cells in an Excel sheet. Kamol Anekchatnuntakool
19:11 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
15:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #323 (Closed): Design equipment in the cabinet)
Design drawing Suchin Viyasing
00:09 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
Kittisak Isarapongporn

19 Dec 2023

23:05 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
21:44 Ueda Plastic (Thailand) Co.,Ltd. 1.00 hour (Project progress work #327 (Closed): Sales label for ueda)
Create document and derivery Ryo Nozaki
21:41 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
Summrize document Ryo Nozaki
21:40 Thai Honda Manufacturing Co., Ltd 4.00 hours (Sales support #237 (Closed): Make proposal for IoT system)
Meeting with CPO and GM staff Ryo Nozaki
21:37 DENSO Philippines Corporation 4.00 hours (Project progress work #22 (Closed): Make specification document for project)
Meeting with KDDI Ryo Nozaki
21:36 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Sales support #326 (Closed): Proposal IoT system for production line)
Site survery and meeting Ryo Nozaki
16:56 Asian Stanley. International Limited 4.00 hours (Project progress work #325 (Closed): Test the report)
Soraya Norasing
16:48 Shodensha (Thailand) Co., Ltd. 3.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
Check and Design the output settings in cells in an Excel sheet. Kamol Anekchatnuntakool
16:42 ATA Casting Technology Co., Ltd. 5.00 hours (Project progress work #310 (Closed): Support config Data Master Reader and insert Data Laser.)
Support insert Data Assembly 3 Pallet. Kamol Anekchatnuntakool
08:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
08:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
08:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
08:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #321 (Closed): Design equipment in the cabinet)
Design drawing Suchin Viyasing
 