Activity
From 19 Dec 2023 to 28 Dec 2023
28 Dec 2023
- 17:05 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #344 (Closed): Learning Keyence PLC JTEKT IOT.)
- 16:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #344 (Closed): Learning Keyence PLC JTEKT IOT.)
- Leaning Keyence Plc Project IOT JTEKT.
- 13:06 BIG Star Co.,Ltd 8.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
- Review 3D Design and summarize concept
- 12:34 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- 12:33 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- 12:33 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- 12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- 12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- 12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- 12:32 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- 12:31 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Create report for stock
27 Dec 2023
- 17:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 16:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
- [Fllow] #141 ==> http://node25444-tom-demo-01.proen.app.ruk-com.cloud:11447/issues/141
- 15:20 Minebea AccessSolutions Thai Ltd 2.00 hours (Project progress work #106 (Closed): [System Testing]ST with AS400)
- Test Import 6 Files OK krub.
26 Dec 2023
- 22:42 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 19:46 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Problem-Bug #343 (Closed): Add new model of Packing process)
- Add model complete
- 16:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #341 (Closed): Price compare from supplier & Design drawing)
- 10:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
- KV8000 Touch display and XD02 monitor screen
- 10:39 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 10:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 10:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 10:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Bekido monitoring HMI register data
25 Dec 2023
- 22:19 Asian Stanley. International Limited 2.00 hours (Project progress work #342 (Closed): Found a problem, unable to issue a report.)
- 22:11 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 22:11 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- edit code inbound detail page and coding label schedule
- 21:31 Thai Nippon foods Co.,Ltd. 2.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Program design
- 21:29 Pandora Production Co., Ltd. 1.00 hour (Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project)
- Order equipment
- 21:26 Thai Nippon foods Co.,Ltd. 7.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Prepare equipment
- 21:25 Thai Nippon foods Co.,Ltd. 1.00 hour (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Prepare equipment
- 21:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
- Summarize concept and equipment
- 16:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #341 (Closed): Price compare from supplier & Design drawing)
- 16:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
24 Dec 2023
- 15:46 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Installation TB-Box 1 and TB-Box 2 in Plant B
- 15:44 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Prepare equipment and make drawing I/O for explain FN TECH Team connect to machine
- 15:24 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Installation TB-Box1 plant A
- 14:56 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Installation TB-Box 2 in plant A
- 15:43 Pandora Production Co., Ltd. 8.00 hours (Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project)
- Assembly stand set and installation at pandora complete ( K.Pakorn ) Next action wait schedule customer for tranning ...
- 15:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #225 (Closed): CCTV Installation)
- Confrim position CCTV camera and Display mounting position with K.Khwanchai and Fac.Team
- 15:37 Thai Honda Manufacturing Co., Ltd 3.00 hours (Project progress work #340 (Closed): Thai honda meeting)
- Meeting and present IoT system
- 15:35 TAKEBE(THAILAND)CO.,LTD. 4.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
- Meeting and test device flow pressure and regulator for create demo-test at office next action make demo dash board a...
- 15:31 ATA Casting Technology Co., Ltd. 5.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
- Service and site to clear concept send and receive data from machine to PLC Tracability final line
- 15:22 ATA Casting Technology Co., Ltd. 9.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
- Service and site to clear concept send and receive data from machine to PLC Tracability final line
- 15:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
- Meeting and site survey and JATH Factory about box collect data and Change display
- 15:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
- Meeting and site survey and JATH Factory about box collect data and Change display
- 15:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Meeting about presentation specification_R1
- 15:16 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #339 (Closed): Shimizu meeting about present proposal IoT systems)
- meeting about presentation IoT System and site survey at site
- 15:08 IIDA SEIMITSU (THAILAND) CO., LTD. 5.00 hours (Sales support #313 (Closed): IIDA wring quote for customer from SND)
- Site survey about check information machine and site area
- 15:02 Tomas Tech Co.,Ltd. 6.00 hours (Sales support #269 (Closed): Automation for receiving and shipping of Fabrinet )
- Site survey with keyence team and Kanyakorn team about concept receiving and shipping process
- 14:55 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Design and prepare equipment for installation TB-Box
23 Dec 2023
- 16:46 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
- Develop the output settings in cells in an Excel sheet.
- 16:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #332 (Closed): Price compare from supplier & Design drawing)
- 14:25 DENSO Philippines Corporation 6.00 hours (Project progress work #22 (Closed): Make specification document for project)
- Make meetinng document
- 14:24 DENSO Philippines Corporation 2.00 hours (Project progress work #22 (Closed): Make specification document for project)
- Meeting with Denso and Meiji
- 14:23 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #338 (Closed): ASAHIKASEI PLASTICS (THAILAND) CO.,LTD. meeting with Mr.Ikenaga)
- 14:18 Thai Nippon foods Co.,Ltd. 3.00 hours (Sales support #337 (Closed): Greeting meeting with Mr.Maruyama and Mr.Kobayashi)
- Meeting with Mr.Kobayashi and Mr.Maruyama
- 14:16 Nidec Techno Motor (Thailand) Co.,Ltd. 3.00 hours (Sales support #336 (Closed): NSET greeting meeting and give new year gift)
- Meeting
- 14:13 A.N.I. LOGISTICS, LTD. 3.00 hours (Sales support #335 (Closed): ANI meeting with Mr.Matsushima)
- Meeting with Matsushima
- 14:11 ATA Casting Technology Co., Ltd. 3.00 hours (Project progress work #334 (Closed): ATA meeting new year and greeting)
- Meeitng and feedback Delta traceability system
- 14:10 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #333 (Closed): Patlite meeting and greeting new year)
- Meeting with K.Fujii
22 Dec 2023
- 22:17 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 22:16 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- coding inbound detail page
- 19:07 Asian Stanley. International Limited 0.00 hour (Project progress work #325 (Closed): Test the report)
- 16:06 Asian Stanley. International Limited 2.00 hours (Project progress work #325 (Closed): Test the report)
- test report with customer and instaill plcc line
- 17:19 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #308 (Closed): Review and learn the source code of the project.)
- 16:46 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
- Develop the output settings in cells in an Excel sheet.
- 16:11 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #331 (Closed): Wiring cable in the cabinet)
- 16:05 A.N.I. LOGISTICS, LTD. 0.00 hour (Problem-Bug #253 (Closed): Found a problem of not being able to use the tablet when the internet was down.)
- 12:30 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
- Create the new spec release 7 and update the TO-DO list
- 12:27 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Test and check the stocktaking on handy and web functions
21 Dec 2023
- 16:56 ATA Casting Technology Co., Ltd. 8.00 hours (Project progress work #322 (Closed): Insert data part NG packageing at QC )
- Finish
- 16:49 Pandora Production Co., Ltd. 8.00 hours (Project progress work #329 (Closed): Install equipment in the small box.)
- 16:47 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
- Develop the output settings in cells in an Excel sheet.
- 16:43 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
- Programming the backend API
- 16:42 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
- Update manual document for Handy revision 4 and migrate the system to production server
- 16:40 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Modify handy application added 4 functions and issue new release version 1.1.8
- 08:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #323 (Closed): Design equipment in the cabinet)
- Design drawing
20 Dec 2023
- 19:32 Shodensha (Thailand) Co., Ltd. 8.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
- Develop the output settings in cells in an Excel sheet.
- 19:11 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 15:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #323 (Closed): Design equipment in the cabinet)
- Design drawing
- 00:09 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #98 (Closed): [Coding]PHP Pegasus web function)
19 Dec 2023
- 23:05 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 21:44 Ueda Plastic (Thailand) Co.,Ltd. 1.00 hour (Project progress work #327 (Closed): Sales label for ueda)
- Create document and derivery
- 21:41 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
- Summrize document
- 21:40 Thai Honda Manufacturing Co., Ltd 4.00 hours (Sales support #237 (Closed): Make proposal for IoT system)
- Meeting with CPO and GM staff
- 21:37 DENSO Philippines Corporation 4.00 hours (Project progress work #22 (Closed): Make specification document for project)
- Meeting with KDDI
- 21:36 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Sales support #326 (Closed): Proposal IoT system for production line)
- Site survery and meeting
- 16:56 Asian Stanley. International Limited 4.00 hours (Project progress work #325 (Closed): Test the report)
- 16:48 Shodensha (Thailand) Co., Ltd. 3.00 hours (Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.)
- Check and Design the output settings in cells in an Excel sheet.
- 16:42 ATA Casting Technology Co., Ltd. 5.00 hours (Project progress work #310 (Closed): Support config Data Master Reader and insert Data Laser.)
- Support insert Data Assembly 3 Pallet.
- 08:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20%
- 08:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20%
- 08:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20%
- 08:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20%
- 08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #321 (Closed): Design equipment in the cabinet)
- Design drawing