Activity
From 19 Dec 2023 to 28 Dec 2023
28 Dec 2023
- 17:05 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
- Develop Inner packing screen function C#.
% Done 35 % - 13:21 YAMADA SOMBOON CO., LTD Sales support #235 (Confirmation request): Demo-kit for YAMADA SOMBOON
- [ Next Action ]
- Wait PO - 13:19 ADVICS Manufacturing(Thailand)Co.,Ltd. Sales support #217 (Confirmation request): Meeting about Loss analysis system IoT project ( New Project )
- [ Now ]
- In Charge K.Anek
[ Next Action ]
- Follow up K.Anek
- Wait PO - 13:16 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd Project progress work #211 (Confirmation request): MACO monitor robot in production line IoT project
- [ Next Action ]
- Wait PO - 13:14 FTS AUTOMOTIVE (THAILAND) CO.,LTD Sales support #232 (Confirmation request): Replace project from D100 to KV8000 and XD02
- [ Next Action ]
- Wait PO - 13:09 BIG Star Co.,Ltd Sales support #209: Shoe size sorting machine project Concept proposal
- [ Next action ]
- Follow price Maker ATT on 29/12/23
- Summarize equipment and estimate cost on 29/12/23
- Meeting wi... - 10:12 ADVICS Manufacturing(Thailand)Co.,Ltd. Problem-Bug #343 (Close request): Add new model of Packing process
- 10:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #341 (Close request): Price compare from supplier & Design drawing
- 10:12 Thai Honda Manufacturing Co., Ltd Project progress work #340 (Close request): Thai honda meeting
- 10:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #332 (Close request): Price compare from supplier & Design drawing
- 10:12 Thai Nippon foods Co.,Ltd. Project progress work #331 (Close request): Wiring cable in the cabinet
- 10:12 Asian Stanley. International Limited Project progress work #325 (Close request): Test the report
- 10:12 Shodensha (Thailand) Co., Ltd. Project progress work #324 (Close request): Checkru the output settings in cells in an Excel sheet.
- 10:12 Thai Nippon foods Co.,Ltd. Project progress work #297 (Close request): Wiring cable in the cabinet
- 10:12 Thai Nippon foods Co.,Ltd. Project progress work #289 (Close request): Wiring cable in the cabinet 4 set
- 10:12 Thai Nippon foods Co.,Ltd. Project progress work #268 (Close request): Making control cabinet wiring 4set
- 10:12 A.N.I. LOGISTICS, LTD. Problem-Bug #253 (Close request): Found a problem of not being able to use the tablet when the internet was down.
- 10:12 Pandora Production Co., Ltd. Sales support #210 (Close request): Auto trigger read QR-Code for Pandora project
- 10:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120 (Close request): [Coding&UT] KV8000 Touch display and XD02 monitor screen
- 10:12 Minebea AccessSolutions Thai Ltd Project progress work #106 (Close request): [System Testing]ST with AS400
27 Dec 2023
- 17:42 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- coding label schedule and label detail page
- 16:47 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
- Develop Inner packing screen function C#.
- 16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #344 (Closed): Learning Keyence PLC JTEKT IOT.
- Learning Keyence PLC JTEKT IOT.
- 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120 (Confirmation request): [Coding&UT] KV8000 Touch display and XD02 monitor screen
- [Fllow] #141 ==> http://node25444-tom-demo-01.proen.app.ruk-com.cloud:11447/issues/141
- 16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #332 (Confirmation request): Price compare from supplier & Design drawing
- 15:20 Minebea AccessSolutions Thai Ltd Project progress work #106 (Confirmation request): [System Testing]ST with AS400
- Test Import 6 Files OK krub.
26 Dec 2023
- 22:42 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- coding schedule label page
- 19:46 ADVICS Manufacturing(Thailand)Co.,Ltd. Problem-Bug #343 (Confirmation request): Add new model of Packing process
- 19:44 ADVICS Manufacturing(Thailand)Co.,Ltd. Problem-Bug #343 (Closed): Add new model of Packing process
- Addition new model of Packing process complete
- 17:48 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Sales support #326 (Closed): Proposal IoT system for production line
- 16:49 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
- Develop Inner packing screen function C#.
% Done 25 % - 16:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #341 (Confirmation request): Price compare from supplier & Design drawing
- 16:31 Tomas Tech Co.,Ltd. Project progress work #308 (In Progress): Review and learn the source code of the project.
- 16:30 Tomas Tech Co.,Ltd. Project progress work #308 (Confirmation request): Review and learn the source code of the project.
- 10:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120: [Coding&UT] KV8000 Touch display and XD02 monitor screen
- XD02 configuration and display
- 10:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #141: [Task]Deverlop HMI Bekido and OA monitoring
- Deverlop Bekido monitoring HMI register data
25 Dec 2023
- 22:19 Asian Stanley. International Limited Project progress work #342 (In Progress): Found a problem, unable to issue a report.
- The customer reported a problem and was unable to issue a report.
Try testing the report yourself on the customer's ... - 22:14 Asian Stanley. International Limited Project progress work #342 (Closed): Found a problem, unable to issue a report.
- Found a problem, unable to issue a report.
Notification according to attached file - 22:11 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- coding label schedule page
- 21:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #328 (In Progress): Crate IoT data collection box for JATH
- Estimate cost and concept design
- 16:46 A.N.I. LOGISTICS, LTD. Project progress work #130: [Coding]Inner packing screen function C#
- Develop Inner packing screen function C#.
- 15:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #341 (Closed): Price compare from supplier & Design drawing
- Price compare from supplier & Design drawing
24 Dec 2023
- 15:37 Thai Honda Manufacturing Co., Ltd Project progress work #340 (Confirmation request): Thai honda meeting
- 15:37 Thai Honda Manufacturing Co., Ltd Project progress work #340 (Closed): Thai honda meeting
- Thai honda meeting about presentation IoT system
- 15:27 Pandora Production Co., Ltd. Sales support #210 (Confirmation request): Auto trigger read QR-Code for Pandora project
- 15:23 ATA Casting Technology Co., Ltd. Problem-Bug #215: Request verification of the data collection of machine
- [ Next Action ]
Assign K.santi follow K.Norut every day - 15:15 Tomas Tech Co.,Ltd. Sales support #339 (Closed): Shimizu meeting about present proposal IoT systems
- [ Next Action ]
- Make demo collection data from mc1,mc2 ( Fanuc controller )
- Send quotation to customer
- 15:05 IIDA SEIMITSU (THAILAND) CO., LTD. Sales support #313 (In Progress): IIDA wring quote for customer from SND
- Quote from SND for IIDA
- 14:57 Thai Nippon foods Co.,Ltd. Project progress work #126 (In Progress): [Installation&On-site support] Production IoT system for TNF
23 Dec 2023
- 16:46 Shodensha (Thailand) Co., Ltd. Project progress work #324 (Confirmation request): Checkru the output settings in cells in an Excel sheet.
- Develop the output settings in cells in an Excel sheet.
- 14:23 Tomas Tech Co.,Ltd. Project progress work #338 (Closed): ASAHIKASEI PLASTICS (THAILAND) CO.,LTD. meeting with Mr.Ikenaga
- 14:22 Tomas Tech Co.,Ltd. Project progress work #338 (Closed): ASAHIKASEI PLASTICS (THAILAND) CO.,LTD. meeting with Mr.Ikenaga
- Proposal system for lock pokayoke system.
It is link with machine and HT, and control lock key with keyence product - 14:18 Thai Nippon foods Co.,Ltd. Sales support #337 (Closed): Greeting meeting with Mr.Maruyama and Mr.Kobayashi
- 14:18 Thai Nippon foods Co.,Ltd. Sales support #337 (Closed): Greeting meeting with Mr.Maruyama and Mr.Kobayashi
- 14:16 Nidec Techno Motor (Thailand) Co.,Ltd. Sales support #336 (Closed): NSET greeting meeting and give new year gift
- 14:16 Nidec Techno Motor (Thailand) Co.,Ltd. Sales support #336 (Closed): NSET greeting meeting and give new year gift
- 14:13 A.N.I. LOGISTICS, LTD. Sales support #335 (Closed): ANI meeting with Mr.Matsushima
- 14:13 A.N.I. LOGISTICS, LTD. Sales support #335 (Closed): ANI meeting with Mr.Matsushima
- 14:11 ATA Casting Technology Co., Ltd. Project progress work #334 (Closed): ATA meeting new year and greeting
- 14:11 ATA Casting Technology Co., Ltd. Project progress work #334 (Closed): ATA meeting new year and greeting
- 14:10 Tomas Tech Co.,Ltd. Project progress work #333 (Closed): Patlite meeting and greeting new year
- 14:10 Tomas Tech Co.,Ltd. Project progress work #333 (Closed): Patlite meeting and greeting new year
- 13:54 Pandora Production Co., Ltd. Project progress work #329 (Closed): Install equipment in the small box.
- 13:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #323 (Closed): Design equipment in the cabinet
- 13:54 ATA Casting Technology Co., Ltd. Project progress work #322 (Closed): Insert data part NG packageing at QC
- 13:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #321 (Closed): Design equipment in the cabinet
- 11:00 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #332 (Closed): Price compare from supplier & Design drawing
- Supplier
- Automationcad
- JW Tech
- Netta
- SirichaiElectric
22 Dec 2023
- 22:17 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- coding inbound detail page finished
- 19:07 Asian Stanley. International Limited Project progress work #325 (Confirmation request): Test the report
- 16:46 Shodensha (Thailand) Co., Ltd. Project progress work #324: Checkru the output settings in cells in an Excel sheet.
- Develop the output settings in cells in an Excel sheet.
- 16:24 Thai Nippon foods Co.,Ltd. Project progress work #289 (Confirmation request): Wiring cable in the cabinet 4 set
- 16:13 Thai Nippon foods Co.,Ltd. Project progress work #297 (Confirmation request): Wiring cable in the cabinet
- 16:13 Thai Nippon foods Co.,Ltd. Project progress work #268 (Confirmation request): Making control cabinet wiring 4set
- 16:11 Thai Nippon foods Co.,Ltd. Project progress work #331 (Confirmation request): Wiring cable in the cabinet
- 16:09 Thai Nippon foods Co.,Ltd. Project progress work #331 (Closed): Wiring cable in the cabinet
- Wiring cable in the cabinet
- 16:05 A.N.I. LOGISTICS, LTD. Problem-Bug #253 (Confirmation request): Found a problem of not being able to use the tablet when the internet was down.
- K'Nack has already examined this problem.
- 12:39 Pandora Production Co., Ltd. Project progress work #329 (Close request): Install equipment in the small box.
- 12:39 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #323 (Close request): Design equipment in the cabinet
- 12:39 ATA Casting Technology Co., Ltd. Project progress work #322 (Close request): Insert data part NG packageing at QC
- 12:39 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #321 (Close request): Design equipment in the cabinet
- 12:26 ACME INDUSTRY CO.,LTD. Project progress work #94 (In Progress): [On-site support]Support after cutover
- 12:26 ACME INDUSTRY CO.,LTD. Project progress work #92 (In Progress): [On-site support]Support after cutover
- 09:12 ATA Casting Technology Co., Ltd. Project progress work #310 (Closed): Support config Data Master Reader and insert Data Laser.
- 09:12 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #307 (Closed): Installation FTP On server data from PLC Bekido
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #306 (Closed): Meeting Kick off IOT bekido and OA monitoring #2
- 08:36 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. Project progress work #330 (Closed): MC30OP80 program modification and installtation at IEMT
- MC30OP80 program modification and create document for k.Boonyarit
21 Dec 2023
- 16:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #321 (Confirmation request): Design equipment in the cabinet
- 16:56 ATA Casting Technology Co., Ltd. Project progress work #322 (Confirmation request): Insert data part NG packageing at QC
- Insert data part NG packageing at QC
Assy 252 pcs
Lasers 108 pcs
- 16:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #323 (Confirmation request): Design equipment in the cabinet
- 16:49 Pandora Production Co., Ltd. Project progress work #329 (Confirmation request): Install equipment in the small box.
- 16:47 Pandora Production Co., Ltd. Project progress work #329 (Closed): Install equipment in the small box.
- - Setting Power supply
- Wiring connector 3set .camera cable .sensor cable. - 16:47 Shodensha (Thailand) Co., Ltd. Project progress work #324: Checkru the output settings in cells in an Excel sheet.
- Develop the output settings in cells in an Excel sheet.
20 Dec 2023
- 19:32 Shodensha (Thailand) Co., Ltd. Project progress work #324: Checkru the output settings in cells in an Excel sheet.
- Develop the output settings in cells in an Excel sheet.
- 19:11 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- -inbound schedule finished wait api
tomorrow
coding inbound detail - 00:07 ATA Casting Technology Co., Ltd. Project progress work #310 (Close request): Support config Data Master Reader and insert Data Laser.
19 Dec 2023
- 23:05 Minebea AccessSolutions Thai Ltd Project progress work #97: [Coding]Android handyterminal BTA500
- -Find a way to pull up the screen to refresh for refresh schedule page.
-coding schedule adapter view.
- 21:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #328 (Closed): Crate IoT data collection box for JATH
- 21:44 Ueda Plastic (Thailand) Co.,Ltd. Project progress work #327 (Closed): Sales label for ueda
- 21:44 Ueda Plastic (Thailand) Co.,Ltd. Project progress work #327 (Closed): Sales label for ueda
- 21:35 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Sales support #326 (Closed): Proposal IoT system for production line
- 16:56 Asian Stanley. International Limited Project progress work #325 (In Progress): Test the report
- -online meeting with customer for verify the accuracy of the report data.
-After checking, report1 is correct. ฺBut ... - 16:48 Asian Stanley. International Limited Project progress work #325 (Closed): Test the report
- Verify the accuracy of the report data.
(The data cutoff time is based on the work shift at 8 a.m.) - 16:48 Shodensha (Thailand) Co., Ltd. Project progress work #324 (In Progress): Checkru the output settings in cells in an Excel sheet.
- Check and Design the output settings in cells in an Excel sheet.
- 16:46 Shodensha (Thailand) Co., Ltd. Project progress work #324 (Closed): Checkru the output settings in cells in an Excel sheet.
- Checkru the output settings in cells in an Excel sheet.
- 16:42 ATA Casting Technology Co., Ltd. Project progress work #310 (Confirmation request): Support config Data Master Reader and insert Data Laser.
- Support insert Data Assembly 3 Pallet.
- 15:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #323 (Closed): Design equipment in the cabinet
- Design equipment in the cabinet
- 08:23 ATA Casting Technology Co., Ltd. Project progress work #322 (Closed): Insert data part NG packageing at QC
- Problem
Data part NG packageing at QC
Cuase
Data from laser machine don't send
Action
Insert manua...