From 19 Nov 2023 to 28 Nov 2023

28 Nov 2023

23:25 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Describe the develop environment and specification to k.Pop Kittisak Isarapongporn
22:42 Nidec Techno Motor (Thailand) Co.,Ltd. 3.00 hours (Project progress work #257 (Closed): Change design layout and modify function cancel)
Soraya Norasing
21:38 Asian Stanley. International Limited 2.00 hours (Sales support #264 (Closed): Meeting about display on TV)
Soraya Norasing
21:36 Asian Stanley. International Limited 1.50 hour (Sales support #265 (Closed): Meeting about label printing system)
Soraya Norasing
21:29 Tomas Tech Co.,Ltd. 1.50 hour (Sales support #20 (Closed): [FY2023]Common management for Soraya)
Soraya Norasing
16:55 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript). Kamol Anekchatnuntakool
15:57 NIKKO NILKHOSOL CO., LTD. 5.00 hours (Sales support #238 (Closed): Proposal for Production management sysytem)
Ryo Nozaki
13:01 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
meeting ebisu Anonymous
13:00 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
meeting ebisu Anonymous
12:59 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
fix scan qr-code fix Inbound Anonymous
12:58 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Today: fix Inbound Simple Anonymous
12:57 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Edit Outbound wait Ebisu request Anonymous
12:56 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Today: fix Outbound Anonymous
12:53 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
meeting ebisu Anonymous
12:51 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Today: fix scan qr-code fix Outbound and Test case Anonymous
12:50 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Today: Fix Outbound And fix scan qr-code Anonymous
12:48 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Today: Development Inbound and Test Outbound Tomorrow: Development fix scan qr-code funtion Inbound and Test Inbound Anonymous
12:47 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Today: Development edit unit & qty to insert table Inbound & Outbound for API And Test Inbound Tomorrow: Development ... Anonymous
12:45 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
UAT about the WMS system and onsite support Arunwit Isarapongporn
01:40 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Test and teach to users Kittisak Isarapongporn
12:45 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #266 (Closed): Make manual document for Pegasus)
Arunwit Isarapongporn
01:32 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
Create the NG report that it is able to create the schedules to compensate for the NG. Kittisak Isarapongporn

27 Nov 2023

23:19 Nidec Techno Motor (Thailand) Co.,Ltd. 3.00 hours (Project progress work #257 (Closed): Change design layout and modify function cancel)
Soraya Norasing
23:05 Asian Stanley. International Limited 2.00 hours (Sales support #265 (Closed): Meeting about label printing system)
Soraya Norasing
22:21 Asian Stanley. International Limited 3.00 hours (Sales support #264 (Closed): Meeting about display on TV)
Soraya Norasing
22:04 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
development layout Schedule Label fuction Soraya Norasing
17:02 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
16:59 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Pick up the device Nattapol Poeam
16:55 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 4.00 hours (Project progress work #230 (Closed): MC30OP80 program modification and create document for k.Boonyarit)
Meeting about proposal and site survey Nattapol Poeam
16:53 ATA Casting Technology Co., Ltd. 4.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Support onsilte ATA Nattapol Poeam
16:50 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript). Kamol Anekchatnuntakool
15:28 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
15:27 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
Anonymous
15:27 Ebisu Foods Co Ltd. 6.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
09:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
Ryo Nozaki
09:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
Ryo Nozaki
09:49 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #262 (Closed): Metalex event support)
Attend customer Ryo Nozaki
09:49 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #262 (Closed): Metalex event support)
Attend customer Ryo Nozaki
09:49 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #262 (Closed): Metalex event support)
Attend customer Ryo Nozaki
09:48 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #262 (Closed): Metalex event support)
Attend customer Ryo Nozaki

25 Nov 2023

09:26 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #260 (Closed): Metalex 2023)
Metalex 2023 Santi Srichankaew

24 Nov 2023

17:23 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
Install ConMas i-Reporter tablet quote 43sets Arunwit Isarapongporn
17:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #52 (Closed): Issue topics)
Kittisak Isarapongporn
16:52 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system. Kamol Anekchatnuntakool
16:47 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
Install equipment in control box 2set total 4 set finish. Next week wiring continues. Suchin Viyasing
10:55 Nissan Motor (Thailand) Co., Ltd. 4.00 hours (Sales support #89 (Closed): New OCR project for Fac1 and Fac2)
Meeting new project GUARD system installation project the area at Plant 2 Arunwit Isarapongporn
10:51 Nissan Motor (Thailand) Co., Ltd. 8.00 hours (Sales support #89 (Closed): New OCR project for Fac1 and Fac2)
Request a quote for equipment for the project. Arunwit Isarapongporn
10:50 Nissan Motor (Thailand) Co., Ltd. 8.00 hours (Sales support #89 (Closed): New OCR project for Fac1 and Fac2)
Request a quote for equipment for the project. Arunwit Isarapongporn
10:54 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 4.00 hours (Sales support #249 (Closed): Traning safety at IEMT)
Traning safety at IEMT Arunwit Isarapongporn
10:52 Siam Denso Manufacturing Co.,Ltd. 8.00 hours (Sales support #79 (Closed): New line 23)
Support installation LAN cable for line 23 Arunwit Isarapongporn
10:48 NTPT Company Limited. 8.00 hours (Project progress work #159 (Closed): ConMas i-Reporter teaching for NTPT staff)
ConMas i-Reporter teaching for NTPT staff Arunwit Isarapongporn
10:48 NTPT Company Limited. 8.00 hours (Project progress work #159 (Closed): ConMas i-Reporter teaching for NTPT staff)
ConMas i-Reporter teaching for NTPT staff Arunwit Isarapongporn
08:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
08:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
08:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
08:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
08:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
08:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
08:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew

23 Nov 2023

23:36 Minebea AccessSolutions Thai Ltd 3.00 hours (Project progress work #10 (Closed): Creating a specification document)
Ryo Nozaki
21:51 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #256 (Closed): Metalex 2023)
Exhibition for Metalex2023 2/2 Nattapol Poeam
21:51 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #256 (Closed): Metalex 2023)
Exhibition for Metalex2023 1/2 Nattapol Poeam
16:56 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system. Kamol Anekchatnuntakool
16:55 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
DB Design and confirm the label spec detail Kittisak Isarapongporn
16:53 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
Install equipment in control box 2set. Suchin Viyasing
16:46 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Meeting and prepare document Kittisak Isarapongporn
13:49 ATA Casting Technology Co., Ltd. 4.00 hours (Project progress work #258 (Closed): Packaging no data traceability at delta line.)
Data transfer over 19 digit Santi Srichankaew
13:34 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #12 (Closed): Addition function display)
Display play show is nomal. Santi Srichankaew
13:31 ATA Casting Technology Co., Ltd. 8.00 hours (Project progress work #23 (Closed): Addition to function skip process)
Add function detect alarm Santi Srichankaew
13:28 Asteer (Thailand) Co., Ltd. 8.00 hours (Project progress work #38 (Closed): Devolop and debug PLC Mitsubishi Q Series)
deverlop program complete Santi Srichankaew
13:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop monitor display Santi Srichankaew
13:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Waiting iastallation on site Santi Srichankaew
13:23 Asteer (Thailand) Co., Ltd. 8.00 hours (Project progress work #110 (Closed): [On-site support]Support after cutover)
Installation complate Santi Srichankaew
13:20 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #43 (Closed): Install SR-X300S at Pandora)
Follow keyence team Santi Srichankaew
13:10 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #43 (Closed): Install SR-X300S at Pandora)
Deverlop Santi Srichankaew
13:13 Nissan Motor (Thailand) Co., Ltd. 4.00 hours (Sales support #157 (Closed): Plant surgery install Trim and Chassis)
Servey plant Santi Srichankaew
13:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
Deverlop program PLC keyence KV-8000 Santi Srichankaew

22 Nov 2023

22:04 Asian Stanley. International Limited 8.00 hours (Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.)
Soraya Norasing
21:42 Nidec Techno Motor (Thailand) Co.,Ltd. 1.00 hour (Project progress work #257 (Closed): Change design layout and modify function cancel)
[Fixed] - change message alert from "Can't insert data" to "Already recorded" - set gravity to left. Soraya Norasing
19:27 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
19:26 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
Anonymous
19:26 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
17:01 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
Suchin Viyasing
16:46 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Modify the spec revision 3 and update the TODO list Kittisak Isarapongporn
16:45 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
DB Design and confirm the outbound spec detail Kittisak Isarapongporn
16:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system. Kamol Anekchatnuntakool
16:38 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Modify structure, Store procedure, Item Master API SAP to WMS Yutthapong Sricha
13:07 Ebisu Foods Co Ltd. 7.00 hours (Project progress work #16 (Closed): WMS Web Development )
API SAP to WMS Yutthapong Sricha
13:17 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #166 (In Progress): IoT monitoring at web screen development PHP)
Yutthapong Sricha
08:40 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 2.00 hours (Sales support #249 (Closed): Traning safety at IEMT)
Training safety at IEMT Nattapol Poeam
08:38 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
08:36 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #256 (Closed): Metalex 2023)
Set up booths for exhibitions Nattapol Poeam

21 Nov 2023

17:53 Tomas Tech Co.,Ltd. 7.00 hours (Sales support #255 (Closed): Safety training at IEMT)
safety trainning at IEMT Soraya Norasing
17:49 Asian Stanley. International Limited 2.00 hours (Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.)
Soraya Norasing
17:34 A.N.I. LOGISTICS, LTD. 3.00 hours (Problem-Bug #253 (Closed): Found a problem of not being able to use the tablet when the internet was down.)
Soraya Norasing
17:21 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Study the specifications and understand. and meeting with K.nack Soraya Norasing
17:19 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:20 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
Integrate and test the BT print function Kittisak Isarapongporn
17:15 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
UAT and teaching Kittisak Isarapongporn
17:14 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Modify the spec from the last meeting and prepare the data for tomorrow meeting. Kittisak Isarapongporn
17:10 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Hold the meeting about the spec confirm and assign the job to dev team Kittisak Isarapongporn
17:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system. Kamol Anekchatnuntakool
17:02 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
Go to Bitec Bang-na at 1:00 Pm. With Mr.Santi &Mr.Nattapol for the setting demo PLC. Suchin Viyasing
16:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Deverlop PLC calculate bekido function Santi Srichankaew
08:36 4.00 hours (Project progress work #252 (Closed): Traning Safety IEMT)
Traning Safety IEMT Yutthapong Sricha
08:33 Ebisu Foods Co Ltd. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
modify store procedure for API SAP to WMS Yutthapong Sricha
08:06 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #241 (Closed): Learning Keyence PLC)
Learning Plc Keyence Suchin Viyasing

20 Nov 2023

22:58 A.N.I. LOGISTICS, LTD. 2.00 hours (Sales support #251 (Closed): ConMas i-Reporter proposal for A.N.I. LOGISTICS, LTD.)
Ryo Nozaki
22:56 FILCON FABRICS & TECHNOLOGY CO.,LTD. 4.00 hours (Sales support #250 (Closed): ConMas i-Reporter proposal for FILCON FABRICS & TECHNOLOGY CO.,LTD. )
Ryo Nozaki
22:54 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #10 (Closed): Creating a specification document)
Ryo Nozaki
17:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Internal meeting about function caculation Nattapol Poeam
17:01 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system. Kamol Anekchatnuntakool
16:47 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
Suchin Viyasing
16:37 Asian Stanley. International Limited 8.00 hours (Problem-Bug #37 (Closed): UPS have problem)
30/11/2023 K.Arunwit to changed UPS Santi Srichankaew
08:42 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #241 (Closed): Learning Keyence PLC)
Suchin Viyasing

19 Nov 2023

10:30 PT.OKAYA INDONESIA 3.00 hours (Project progress work #245 (Closed): Make quote and delivery for HANDY TERMINAL 1 set PT PANASONIC GOBEL ENERGY INDONESIA)
Ryo Nozaki
10:27 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #244 (Closed): Make quote and delivery for ANI)
Ryo Nozaki
 