- 22:51 A.N.I. LOGISTICS, LTD. 4.00 hours (Problem-Bug #214 (Closed): Found the problem with the handy being able to scan the other label [STAGING AREA])
- Investigate and analyze the instructions to resolve the problem
- 21:45 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 4.00 hours (Project progress work #213 (Closed): Proposal IoT system for Maco production line)
- 21:43 A.N.I. LOGISTICS, LTD. 4.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
- 21:40 A.N.I. LOGISTICS, LTD. 4.00 hours (Sales support #179 (Closed): Join the meeting at on-site)
- 18:37 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
- day off. (Switch day off 5/11/23)
- 18:34 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
- 18:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 7.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- 17:15 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 16:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #203 (Closed): Test Program & Make document)
- Make document
- 16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #203 (Closed): Test Program & Make document)
- Leaning function PLC Mitsubishi & Make document
- 16:45 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Develop Import Bucket quantity information File.
- 09:36 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #196 (Closed): Test Program )
- Leaning function PLC Mistubishi
- 09:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #212 (Closed): Check Relay contactor from supplier)
- Request price for relay from supplier.
- 09:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #212 (Closed): Check Relay contactor from supplier)
- Request price for relay from supplier.
- 08:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #191 (Closed): Test Program )
- Leaning function PLC Mistubishi
- 08:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #195 (Closed): Test Program )
- Leaning function PLC Mistubishi
- 08:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #195 (Closed): Test Program )
07 Nov 2023
- 22:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Meeting about requiment from production section input data in production line and UI for monitoring Main UI
- 22:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Design function calculation time Bekido and other function
- 22:26 PANDORA PRODUCTION CO., LTD. 8.00 hours (Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project)
- Make wiring box and install at site
- 22:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- 15:40 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- Update setting config of printer label 17 point and test print label all complete
- 15:38 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- Update setting config of printer label 27 point and test print label complete. The remaining 17 will be set up and t...
- 22:19 BIG STAR CO., LTD. 4.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
- Meeting and Site survey
- 22:09 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Update specification R2
- 21:51 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Update specification R2
- 22:05 TAKEBE (THAILAND) CO., LTD. 4.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
- Meeting about IoT monitoring systems
- 21:48 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #207 (Closed): Meeting about review 3D Design)
- 20:49 DENSO PHILIPPINES CORPORATION 4.00 hours (Project progress work #22 (Closed): Make specification document for project)
- 20:48 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 17:35 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #193 (Closed): Test Program )
- 17:34 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #192 (Closed): Test Program & Outside)
- 17:33 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #192 (Closed): Test Program & Outside)
- Leaning function PLC Mistubishi
- 17:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #194 (Closed): Test Program & Outside)
- Leaning function PLC Mistubishi & Outside
- 17:23 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 17:00 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:59 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:45 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:38 EBISU FOODS CO., LTD. 5.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:32 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:24 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:18 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- Web Pegasus Tag Label generator (continus yesterday) and change Design Label / Test Inbound Inquiry Report / update ...
- 16:15 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
- Web pegasus Production Schedule / Tag Label generator
- 17:03 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Problem-Bug #73 (Closed): Found 500 return error)
- Monitor web error by anydesk
- 17:03 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Problem-Bug #73 (Closed): Found 500 return error)
- Monitor web error by anydesk
- 17:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Problem-Bug #73 (Closed): Found 500 return error)
- Monitor web error by anydesk
- 16:55 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
- 16:55 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- 16:54 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 16:46 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Develop Import Item master information File.
- 16:42 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 4.00 hours (Project progress work #50 (Closed): Add delete function)
- 16:41 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 8.00 hours (Project progress work #50 (Closed): Add delete function)
- 16:41 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. 8.00 hours (Project progress work #50 (Closed): Add delete function)
- 16:39 ASTEER (THAILAND) CO., LTD. 8.00 hours (Project progress work #110 (Closed): [On-site support]Support after cutover)
- Waiting iastallation on site
- 16:33 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #200 (Closed): Counter RH fucntion not operation)
- Edit Program plc bekido and Haru Program machine
- 16:32 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Sales support #140 (Closed): IOT Monitoring)
- Edit Program plc bekido
- 16:25 ATA CASTING TECHNOLOGY CO., LTD. 4.00 hours (Project progress work #91 (Closed): Modify Pegasus.)
- Test and fix bug about date from and to filtering
- 10:44 ATA CASTING TECHNOLOGY CO., LTD. 3.00 hours (Project progress work #91 (Closed): Modify Pegasus.)
- Resolve the punch list topics 3-5
- 16:20 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #206 (Closed): Installation)
- Installation completed
- 16:18 TOMAS TECH CO., LTD. 3.00 hours (Sales support #202 (Closed): Meeting with the Keyence team about the new project Demo-kit.)
- Online meeting about Demo-kit YAMADA SOMBOON CO.,LTD
- 16:13 THAI NIPPON FOODS CO., LTD. 3.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
- Online meeting about Demo-kit YAMADA SOMBOON CO.,LTD
- 16:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #205 (Closed): Change Web Screen 2 On TV )
- Change condition in function on web site show on TV screen 2
- 15:42 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- 10:40 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
- 09:56 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 8.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
- Update document
- 08:01 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #174 (Closed): Data outstanding on table bekido [support on site ])
- Edit Program plc bekido
06 Nov 2023
- 22:14 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 19:30 THAI NIPPON FOODS CO., LTD. 5.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
- Revise and summarize all equipment of the Machine operation monitoring system project.
- 18:14 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- 17:28 THAI NIPPON FOODS CO., LTD. 4.00 hours (Sales support #175 (Closed): EV charger installation project)
- Site survey 06/11/23
- 17:23 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 8.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
- Summarize equipment and 3D Design
- 16:56 TOMAS TECH CO., LTD. 4.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
- 16:52 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #142 (Closed): UAT about the WMS system and onsite support)
- 16:50 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- 16:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
05 Nov 2023
- 22:25 ATA CASTING TECHNOLOGY CO., LTD. 3.00 hours (Project progress work #91 (Closed): Modify Pegasus.)
- Checking the script and test result from packing app (found the wrong reader number)
- 22:16 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
- 21:56 EBISU FOODS CO., LTD. 5.00 hours (Project progress work #199 (Closed): Internal test)
- Initial the testing
- 17:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #42 (Closed): HT-Label printing system)
- Attach source code file
- 17:03 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 0.00 hour (Problem-Bug #138 (Closed): HTA_NSET completion fix bug.)
- Attach source code file
04 Nov 2023
- 18:57 A.N.I. LOGISTICS, LTD. 2.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
- 17:16 A.N.I. LOGISTICS, LTD. 9.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
- 17:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #196 (Closed): Test Program )
- 16:40 MINEBEA ACCESSSOLUTIONS THAI LTD. 6.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- 15:31 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #186 (Closed): Create demo unit for keyence)
- Program and HMI
- 15:29 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #186 (Closed): Create demo unit for keyence)
- All documents related to this work
- 15:19 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #187 (Closed): Create demo unit for WD 10sets)
- Estimate cost Demo-Kit New
- 14:25 TOMAS TECH CO., LTD. 8.00 hours (Sales support #48 (Closed): Redmine email notifications)
- Redmine email notifications setting
- 14:24 TOMAS TECH CO., LTD. 8.00 hours (Sales support #48 (Closed): Redmine email notifications)
- Redmine email notifications setting
- 09:19 TOMAS TECH CO., LTD. 1.00 hour (Sales support #48 (Closed): Redmine email notifications)
- 14:18 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- Support to start using the system for Label printing system
- 14:17 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- Support to start using the system for Label printing system
- 14:17 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- Support installation for power supply and LAN cable for 20 points
- 14:16 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- Support installation for power supply and LAN cable for 20 points
- 14:15 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- Support installation for power supply and LAN cable for 20 points
- 14:14 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- Support installation for power supply and LAN cable for 20 points
- 09:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- 09:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- 08:57 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
- 14:14 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Update document layout plant
- 14:08 THAI NIPPON FOODS CO., LTD. 8.00 hours (Sales support #175 (Closed): EV charger installation project)
- Update document about installation EV-Charger
- 14:06 THAI NIPPON FOODS CO., LTD. 8.00 hours (Sales support #175 (Closed): EV charger installation project)
- Update document about installation EV-Charger
- 13:57 ATA CASTING TECHNOLOGY CO., LTD. 2.00 hours (Problem-Bug #184 (Closed): Found an incorrect configure about the packing app reader number)
- 13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #193 (Closed): Test Program )
- 13:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Update document about reequipment from customer after meeting 03/11/23
- 09:23 NTPT COMPANY LIMITED. 1.00 hour (Project progress work #159 (Closed): ConMas i-Reporter teaching for NTPT staff)
- 08:45 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
03 Nov 2023
- 17:52 ATA CASTING TECHNOLOGY CO., LTD. 2.00 hours (Project progress work #181 (Closed): Adjust the search box size and hide/unhide the column according to filtering data (Casting/Packing))
- Add the hide/unhide according to filtering search condition
- 16:52 ATA CASTING TECHNOLOGY CO., LTD. 6.00 hours (Project progress work #181 (Closed): Adjust the search box size and hide/unhide the column according to filtering data (Casting/Packing))
- 17:49 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #183 (Closed): Modify the item master to add the picture preview)
- Modify and test the item master about adding the picture preview
- 17:45 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #182 (Closed): UAT about the WMS system)
- 17:43 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #53 (Closed): UAT about the WMS system)
- 16:52 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 16:51 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- 15:45 DENSO PHILIPPINES CORPORATION 1.00 hour (Project progress work #22 (Closed): Make specification document for project)
- 15:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #143 (Closed): Production IoT project requirements and support project)
- 15:42 ATA CASTING TECHNOLOGY CO., LTD. 3.00 hours (Sales support #71 (Closed): Machine operation monitoring)
- 15:40 ACME INDUSTRY CO.,LTD. 1.00 hour (Project progress work #142 (Closed): UAT about the WMS system and onsite support)
- 10:02 A.N.I. LOGISTICS, LTD. 1.00 hour (Problem-Bug #180 (Closed): Found the duplicated scan error and an import error)
- Investigate and resolve the problem
02 Nov 2023
- 21:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- 20:03 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #168 (Closed): Modify REDMINE Line Notify system.)
- 08:00 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #168 (Closed): Modify REDMINE Line Notify system.)
- 17:32 MINEBEA ACCESSSOLUTIONS THAI LTD. 1.50 hour (Sales support #177 (Closed): Joined the meeting)
- 17:30 ACME INDUSTRY CO.,LTD. 3.50 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
- 17:22 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #163 (Closed): Import BOM/Modify script to manage uncontrol items and outsource details)
- Import BOM and modify the store procedure for schedule according to uncontrol and outsource details
- 17:20 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #163 (Closed): Import BOM/Modify script to manage uncontrol items and outsource details)
- Import BOM and update the supplier from received BOM files
- 17:18 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 17:18 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 17:17 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- 08:44 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Document specification update R2 of the project Machine operation monitoring system specifications.
- 09:08 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #173 (Closed): Deltaline laser machine not operation)
- 08:45 ASTEER (THAILAND) CO., LTD. 8.00 hours (Project progress work #38 (Closed): Devolop and debug PLC Mitsubishi Q Series)
- BT connect to PLC Mitsubishi Q03uvdcpu
- 08:06 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #169 (Closed): Pandora Setup Demo SR Scanner.)
01 Nov 2023
- 18:02 A.N.I. LOGISTICS, LTD. 5.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
- 17:38 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
- 17:27 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Add the "DEAD STOCK" to item status
- 17:21 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 15:49 TOMAS TECH CO., LTD. 3.00 hours (Sales support #171 (Closed): Ishida meeting and weight system IoT concept)
- 15:38 MINEBEA ACCESSSOLUTIONS THAI LTD. 1.00 hour (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Meeting with K.Kamol and calculate the man-day for AS400 interface software development
- 15:37 MINEBEA ACCESSSOLUTIONS THAI LTD. 1.00 hour (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Create DB wms-mast
- 15:12 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #170 (Closed): Add the item picture preview)
- Modify the Item master web page
31 Oct 2023
- 20:27 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
- 19:14 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 18:10 ACME INDUSTRY CO.,LTD. 2.00 hours (Project progress work #162 (Closed): Found BT connection failed to Sato WS4 label printer)
- Contact to K.Yotdanai(SATO sales person)
- 17:49 A.N.I. LOGISTICS, LTD. 1.00 hour (Problem-Bug #161 (Closed): Found duplicated scan & part name cannot be displayed in reports)
- 17:06 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #22 (Closed): Make specification document for project)
- 17:05 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #142 (Closed): UAT about the WMS system and onsite support)
- 16:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #155 (Closed): Redmine Line Notify Software.)
- 13:50 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points)
30 Oct 2023
- 23:41 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #158 (Closed): HT-Label printing system [modify to support the multiple machine])
- 16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #155 (Closed): Redmine Line Notify Software.)
- 11:03 NISSAN MOTOR (THAILAND) CO., LTD. 8.00 hours (Sales support #157 (Closed): Plant surgery install Trim and Chassis)
- File support
- 00:36 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Develop and test the SATO android SDK
- 00:35 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Develop and test the stocktaking, stock check and change location functions on handy and backend web