From 13 Feb 2024 to 22 Feb 2024

22 Feb 2024

16:35 8.00 hours (Project progress work #451 (Closed): Water treatment.)
Suchin Viyasing
16:34 8.00 hours (Project progress work #451 (Closed): Water treatment.)
Design drawing Suchin Viyasing
16:34 8.00 hours (Project progress work #451 (Closed): Water treatment.)
Design drawing Suchin Viyasing
16:33 8.00 hours (Project progress work #451 (Closed): Water treatment.)
Design drawing Suchin Viyasing

13 Feb 2024

19:47 8.00 hours (Project progress work #438 (Closed): Survery Essilor manufacturing)
Survery Essilor manufacturing Suthiwat Banrueangthong
19:41 8.00 hours (Project progress work #437 (Closed): support ANI)
On-site support at ANI Suthiwat Banrueangthong
19:35 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
Set up data extraction from machines to dashboard Suthiwat Banrueangthong
19:33 8.00 hours (Project progress work #400 (Closed): Program developer and Dashboard design)
Make a new alarm, reduce the use of data settings to be sufficient for usage. Suthiwat Banrueangthong
19:28 8.00 hours (Project progress work #399 (Closed): [Installation&On-site support] Production IoT system for TNF)
Check the signal from the machine to the dashboard. Suthiwat Banrueangthong
19:27 8.00 hours (Project progress work #399 (Closed): [Installation&On-site support] Production IoT system for TNF)
Check the LAN cable for plantA signal transmission Install plant B equipment Suthiwat Banrueangthong
 