Parent project #2759: [PJ250074] Operation monitoring system for ShinDengen for 5units 1. Software & Hardware (PT. DJK INDONESIA)
Project progress work #2760: [Requirement definition]
Project progress work #2761: [Internal Design]
Project progress work #2763: [Installation&On-site support]
Project progress work #774: [Colding] Front-end Web dashboard application PHP
Project progress work #821: [Colding] Back-end Web dashboard application PHP
Parent project #3015: [PJ250090] Operation monitoring system for ShinDengen Customization fee
Project progress work #3303: [Internal Design]
Project progress work #3305: [Installation&On-site support]
Project progress work #3327: [Installation&On-site support] Line 3: Installation / Wiring / Config / IO Check
Project progress work #3328: [Installation&On-site support] Line 4: Installation / Wiring / Config / IO Check
Project progress work #3329: [Installation&On-site support] Line 5: Installation / Wiring / Config / IO Check
Project progress work #3330: [Installation&On-site support] Software installation
Project progress work #3331: [Installation&On-site support] Teaching for UT
Project progress work #3332: [Installation&Onsite support] User Testing & Trial
Project progress work #3333: [Installation&On-site support] Supports user feedback
Project progress work #3334: [Installation&On-site support] Teaching for Go live
Project progress work #3335: [Installation&On-site support] Go live
Project progress work #3316: [Coding] WDT Configuration Line 3
Project progress work #3317: [Coding] Validation check Signal & Information Line 3
Project progress work #3318: [Coding] WDT Configuration Line 4
Project progress work #3319: [Coding] Validation check Signal & Information Line 4
Project progress work #3320: [Coding] WDT Configuration Line 5
Project progress work #3321: [Coding] Validation check Signal & Information
Project progress work #3322: [Coding] DB Seteup and modification Line 2
Project progress work #3323: [Coding] Web application installation Line 2
Project progress work #3324: [Coding] DB Setup and modification Line 3,4,5
Project progress work #3325: [Coding] Web application installation Line 3,4,5
Parent project #2783: [PJ250078] Operation monitoring system for ShinDengen 100% (DAIICHI JITSUGYO (THAILAND) CO., LTD)
Project progress work #2784: [Requirement definition]
Project progress work #2785: [Internal Design]
Project progress work #3029: [Internal Design] Hardware system design
Project progress work #3028: [Internal Design] Software System Design
Project progress work #2787: [Installation&On-site support]
Project progress work #3031: [Installation&On-site support] Software Machine data collection & Configuration Line 2
Project progress work #3032: [Installation&On-site support] Hardware installation and wiring Line 3,4,5
Project progress work #3033: [Installation&On-site support] Software Machine data collection & Configuration Line 3,4,5
Project progress work #3034: [Installation&On-site support] Software Installation
Project progress work #3035: [Installatin&On-site support] Teaching for UT
Project progress work #3036: [Installation&On-site support] User Testing & Trial
Project progress work #3037: [Installation&On-site support] Supports user feedback
Project progress work #3038: [Installation&On-site support] Teaching for Go live
Project progress work #3039: [Installation&On-site support] Go live
Project progress work #3016: [Coding] Add Scale
Project progress work #3017: [Coding] Addition estimate time follow plan
Project progress work #3018: [Coding] Addition detail "Plan delay, Planned shutdown overtime, OEE" Product by product
Project progress work #3019: [Coding] Add Color OEE (Red, Green)
Project progress work #3020: [Coding] Add target setting
Project progress work #3021: [Coding] Change color Gray for Breakdown Actual
Project progress work #3022: [Coding] Manual to Edit Actual (Quantity and Color)
Project progress work #3023: [Coding] Notification OEE by E-Mail or Smartwatch
Project progress work #3024: [Coding] Change "OEE, Plan delay time; Plan shutdown" lot by lot day per time
Project progress work #3025: [Coding] Add Import/Export to File CSV
Project progress work #3026: [Coding] Addition plan NO OT, Plan Machine Stop, Other
Project progress work #3027: [Coding] Addition time to used and auto end

Status

In Progress
New
In Progress
New
New
New
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New

Priority

Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal

Total estimated time

0.00
544.00
248.00
136.00
8.00
40.00
64.00
16.00
40.00
8.00
8.00
8.00
392.00
80.00
40.00
40.00
272.00
16.00
16.00
16.00
64.00
64.00
64.00
16.00
0.00

Total spent time

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Updated

19 Nov 2025 15:21
29 Oct 2025 16:06
29 Oct 2025 16:06
29 Oct 2025 16:06
29 Oct 2025 16:06
28 Nov 2024 00:24
28 Nov 2024 00:25
19 Dec 2025 10:39
19 Dec 2025 09:12
19 Dec 2025 10:39
19 Dec 2025 10:31
19 Dec 2025 10:32
19 Dec 2025 10:33
19 Dec 2025 10:38
19 Dec 2025 10:36
19 Dec 2025 10:36
19 Dec 2025 10:37
19 Dec 2025 10:38
19 Dec 2025 10:39
19 Dec 2025 09:29
19 Dec 2025 09:19
19 Dec 2025 09:23
19 Dec 2025 09:21
19 Dec 2025 09:24
19 Dec 2025 09:22
19 Dec 2025 09:24
19 Dec 2025 09:26
19 Dec 2025 09:27
19 Dec 2025 09:28
19 Dec 2025 09:29
28 Nov 2025 13:15
28 Nov 2025 08:38
28 Nov 2025 11:54
28 Nov 2025 11:54
28 Nov 2025 11:54
28 Nov 2025 13:15
28 Nov 2025 11:57
28 Nov 2025 11:58
28 Nov 2025 11:59
28 Nov 2025 13:02
28 Nov 2025 13:04
28 Nov 2025 13:08
28 Nov 2025 13:12
28 Nov 2025 13:14
28 Nov 2025 13:15
27 Nov 2025 16:42
27 Nov 2025 16:42
27 Nov 2025 16:43
27 Nov 2025 16:45
27 Nov 2025 16:47
27 Nov 2025 16:47
27 Nov 2025 16:53
27 Nov 2025 16:57
27 Nov 2025 17:08
27 Nov 2025 17:09
27 Nov 2025 17:16
27 Nov 2025 17:14
27 Nov 2025 17:16
 
 
45
46
47
48
49
50
51
52
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Tomas Tech All Project Management
 
 
ShinDengen(Thailand)Co.,Ltd
New 0%
New 0%
 
 
 
In Progress
Parent project #3015: [PJ250090] Operation monitoring system for ShinDengen Customization fee

Project: ShinDengen(Thailand)Co.,Ltd
Status: In Progress
Start date: 27 Oct 2025
Due date: 30 Jan 2026
Assignee: Nattapol Poeam
Priority: Normal
 
 
 
 
 
New 100%
Project progress work #3303: [Internal Design]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 03 Nov 2025
Due date: 30 Nov 2025
Assignee:
Priority: Normal
 
 
 
 
 
New 5%
Project progress work #3305: [Installation&On-site support]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 30 Jan 2026
Assignee:
Priority: Normal
 
 
New 0%
Project progress work #3327: [Installation&On-site support] Line 3: Installation / Wiring / Config / IO Check

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 13 Dec 2025
Due date: 13 Dec 2025
Assignee: Konlawat Saechee
Priority: Normal
 
 
New 0%
Project progress work #3328: [Installation&On-site support] Line 4: Installation / Wiring / Config / IO Check

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 13 Dec 2025
Due date: 13 Dec 2025
Assignee: Konlawat Saechee
Priority: Normal
 
 
New 0%
Project progress work #3329: [Installation&On-site support] Line 5: Installation / Wiring / Config / IO Check

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 13 Dec 2025
Due date: 13 Dec 2025
Assignee: Konlawat Saechee
Priority: Normal
 
 
New 20%
Project progress work #3330: [Installation&On-site support] Software installation

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 12 Jan 2026
Due date: 18 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3331: [Installation&On-site support] Teaching for UT

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3332: [Installation&Onsite support] User Testing & Trial

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3333: [Installation&On-site support] Supports user feedback

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3334: [Installation&On-site support] Teaching for Go live

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3335: [Installation&On-site support] Go live

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 29 Jan 2026
Due date: 30 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
 
 
 
 
New 16%
Project progress work #3304: [Coding]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 26 Nov 2025
Due date: 05 Jan 2026
Assignee:
Priority: Normal
 
New 0%
Project progress work #3316: [Coding] WDT Configuration Line 3

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3317: [Coding] Validation check Signal & Information Line 3

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3318: [Coding] WDT Configuration Line 4

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3319: [Coding] Validation check Signal & Information Line 4

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3320: [Coding] WDT Configuration Line 5

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3321: [Coding] Validation check Signal & Information

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Pattanasak Chaonchom
Priority: Normal
 
New 0%
Project progress work #3322: [Coding] DB Seteup and modification Line 2

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Worawit Khantamool
Priority: Normal
 
New 0%
Project progress work #3323: [Coding] Web application installation Line 2

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Worawit Khantamool
Priority: Normal
 
New 0%
Project progress work #3324: [Coding] DB Setup and modification Line 3,4,5

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Worawit Khantamool
Priority: Normal
 
New 0%
Project progress work #3325: [Coding] Web application installation Line 3,4,5

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 05 Jan 2026
Due date: 05 Jan 2026
Assignee: Worawit Khantamool
Priority: Normal
 
 
 
 
 
In Progress
Parent project #2783: [PJ250078] Operation monitoring system for ShinDengen 100% (DAIICHI JITSUGYO (THAILAND) CO., LTD)

Project: ShinDengen(Thailand)Co.,Ltd
Status: In Progress
Start date: 17 Nov 2025
Due date: 30 Jan 2026
Assignee: Nattapol Poeam
Priority: Normal
 
 
 
New 100%
Project progress work #2784: [Requirement definition]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 30 Nov 2025
Assignee: Konlawat Saechee
Priority: Normal
 
 
 
 
 
New 100%
Project progress work #2785: [Internal Design]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 14 Dec 2025
Assignee:
Priority: Normal
 
 
 
New 100%
Project progress work #3029: [Internal Design] Hardware system design

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 23 Nov 2025
Assignee: Konlawat Saechee
Priority: Normal
 
 
 
New 100%
Project progress work #3028: [Internal Design] Software System Design

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 01 Dec 2025
Due date: 14 Dec 2025
Assignee:
Priority: Normal
 
 
 
 
 
New 9%
Project progress work #2787: [Installation&On-site support]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 30 Jan 2026
Assignee:
Priority: Normal
 
 
 
New 100%
Project progress work #3031: [Installation&On-site support] Software Machine data collection & Configuration Line 2

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 24 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3032: [Installation&On-site support] Hardware installation and wiring Line 3,4,5

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 13 Dec 2025
Due date: 14 Dec 2025
Assignee: Konlawat Saechee
Priority: Normal
 
 
New 0%
Project progress work #3033: [Installation&On-site support] Software Machine data collection & Configuration Line 3,4,5

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 13 Dec 2025
Due date: 14 Dec 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
New 0%
Project progress work #3034: [Installation&On-site support] Software Installation

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 12 Jan 2026
Due date: 18 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
New 0%
Project progress work #3035: [Installatin&On-site support] Teaching for UT

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3036: [Installation&On-site support] User Testing & Trial

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3037: [Installation&On-site support] Supports user feedback

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3038: [Installation&On-site support] Teaching for Go live

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 19 Jan 2026
Due date: 28 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
New 0%
Project progress work #3039: [Installation&On-site support] Go live

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 29 Jan 2026
Due date: 30 Jan 2026
Assignee: Konlawat Saechee
Priority: Normal
 
 
 
 
New 0%
Project progress work #2786: [Coding]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee:
Priority: Normal
 
 
New 0%
Project progress work #3016: [Coding] Add Scale

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3017: [Coding] Addition estimate time follow plan

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3018: [Coding] Addition detail "Plan delay, Planned shutdown overtime, OEE" Product by product

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3019: [Coding] Add Color OEE (Red, Green)

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3020: [Coding] Add target setting

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3021: [Coding] Change color Gray for Breakdown Actual

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3022: [Coding] Manual to Edit Actual (Quantity and Color)

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3023: [Coding] Notification OEE by E-Mail or Smartwatch

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3024: [Coding] Change "OEE, Plan delay time; Plan shutdown" lot by lot day per time

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
 
 
New 0%
Project progress work #3025: [Coding] Add Import/Export to File CSV

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
 
 
New 0%
Project progress work #3026: [Coding] Addition plan NO OT, Plan Machine Stop, Other

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
 
 
New 0%
Project progress work #3027: [Coding] Addition time to used and auto end

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
 