09 Dec 2024

10:25 Project progress work #858 (Closed): [ Installation & On-site support] Program PLC Installation Pintong
- Program installation Nattapol Poeam
10:24 Project progress work #857 (Closed): [ Installation & On-site support] Program PLC Installation Soi6
- Program installation & connect to Power meter Nattapol Poeam
10:22 Project progress work #856 (Closed): [ Installation & On-site support] Program PLC Installation Soi3
- Program PLC Installation & Power connection Nattapol Poeam
10:12 Project progress work #855 (Closed): [ Installation & On-site support] Control box installation #Pintong
- Control box installation and connect system Nattapol Poeam
10:11 Project progress work #854 (Closed): [ Installation & On-site support] Control box installation #Soi6
- Control box installation and connect system Nattapol Poeam
10:07 Project progress work #853 (Closed): [ Installation & On-site support] Control box installation #Soi3
- Control box installation and connect system Nattapol Poeam
09:42 Project progress work #852 (Closed): [ Installation & On-site support] Software installation PLC
Program installation and testing
1. Soi 3
2. Soi 6
3. Pinthong
Nattapol Poeam
09:39 Project progress work #851 (Closed): [ Coding ] Program development PLC
- Make function power meter pulling
Nattapol Poeam
08:52 Project progress work #850 (Closed): Power Meter Parameter check
1.Check parameter power meter SOI 3,SOI 6,PINTONG
1.1 IP Address from MOXA ( Ethernet converter )
1.2 Meter Node I...
Nattapol Poeam
08:49 Project progress work #849 (Closed): EE Drawing deisgn
- Make drawing EE
- Summary equipment
Nattapol Poeam

06 Dec 2024

08:30 Project progress work #777 (In Progress): [Colding] Front-End Web dashboard application PHP
Worawit Khantamool
 