From 03 Sep 2024 to 12 Sep 2024

12 Sep 2024

17:01 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool

11 Sep 2024

16:47 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
15:44 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation Thanthima Phaengkham

10 Sep 2024

16:57 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool
10:24 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 5/10 Thanthima Phaengkham
10:24 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 4/10 Thanthima Phaengkham
10:23 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 3/10 Thanthima Phaengkham
10:22 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 2/10 Thanthima Phaengkham
10:22 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 1/10 Thanthima Phaengkham
10:16 232.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
Thanthima Phaengkham
10:16 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
10:16 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
10:16 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
10:15 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
10:15 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
10:15 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
10:14 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
10:13 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
10:13 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
10:13 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
10:13 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
10:12 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
10:12 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:12 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
10:11 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
10:11 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
10:11 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
10:10 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
10:08 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
10:08 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
10:08 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
10:07 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 8/29 Thanthima Phaengkham
10:07 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
10:07 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
10:07 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
10:06 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
10:06 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 3/29 Thanthima Phaengkham
10:06 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
10:05 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
10:04 232.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
Thanthima Phaengkham
10:03 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
10:03 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
10:03 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
10:03 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
10:02 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
10:02 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
10:02 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
10:02 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
10:01 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
10:01 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
10:01 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
10:00 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:00 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:00 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
10:00 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
09:59 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:59 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
09:59 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
09:59 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
09:58 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
09:58 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
09:54 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
09:53 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
09:50 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
09:49 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
STEP - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:49 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:53 8.00 hours (Parent project #542 (Closed): [PJ240019] CKD system for Logistics Alliance (Thailand) CO.,LTD CYLC)
[Task] LAT - STEP - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
09:42 232.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:41 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
09:41 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
09:40 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
09:40 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
09:40 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
09:39 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
09:39 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
09:39 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
09:38 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
09:32 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
09:31 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
09:31 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
09:31 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
09:31 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
09:30 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
09:30 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:29 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
09:29 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:29 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
09:26 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
09:26 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
09:26 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
09:25 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
09:25 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 8/29 Thanthima Phaengkham
09:25 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
09:25 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
09:24 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
09:24 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
09:24 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 3/29 Thanthima Phaengkham
09:23 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:23 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
09:21 192.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:18 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 24/24 Thanthima Phaengkham
09:17 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 23/24 Thanthima Phaengkham
09:17 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 22/24 Thanthima Phaengkham
09:16 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24 Thanthima Phaengkham
09:16 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24 Thanthima Phaengkham
09:16 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 20/24 Thanthima Phaengkham
09:15 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 19/24 Thanthima Phaengkham
09:15 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 18/24 Thanthima Phaengkham
09:14 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 17/24 Thanthima Phaengkham
09:14 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 16/24 Thanthima Phaengkham
09:13 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 15/24 Thanthima Phaengkham
09:13 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 14/24 Thanthima Phaengkham
09:11 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 13/24 Thanthima Phaengkham
09:11 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 12/24 Thanthima Phaengkham
09:09 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 11/24 Thanthima Phaengkham
09:09 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 10/24 Thanthima Phaengkham
09:08 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 9/24 Thanthima Phaengkham
09:08 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 8/24 Thanthima Phaengkham
09:07 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 7/24 Thanthima Phaengkham
09:07 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 6/24 Thanthima Phaengkham
09:07 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 5/24 Thanthima Phaengkham
09:06 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 4/24 Thanthima Phaengkham
09:06 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 3/24 Thanthima Phaengkham
09:05 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 2/24 Thanthima Phaengkham
09:05 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 1/24 Thanthima Phaengkham

09 Sep 2024

16:46 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Modify HT Software. Kamol Anekchatnuntakool

07 Sep 2024

16:55 8.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Add Table Database HT Software. Kamol Anekchatnuntakool

06 Sep 2024

16:44 6.00 hours (Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal)
Add Table Database HT Software. Kamol Anekchatnuntakool
 