03 Dec 2024
- 11:11 Project progress work #842 (Closed): HW Onsite installation
- 1. Installation PLC Master
2. Installation HMI
3. Installation PC
4. Installation Table
5. Setup equipment - 11:10 Project progress work #841 (Closed): Table installation
- - Table installation and setup
- 11:08 Project progress work #840 (Closed): Connect to machine
- Connect CC-Link system to Machine
OP1
OP4
OP6
OP7.1
OP7.2
OP8
OP9
OP10.1
OP10.2 - 11:05 Project progress work #839 (Closed): Software external installation
- - Installation Program PLC
- Installation Program C# Application - 11:02 Project progress work #838 (Closed): Specification design
- - Make specification for traceability AS004
- 10:59 Project progress work #837 (Closed): ME Assembly [ Table ]
- - Assembly table
- 10:58 Project progress work #836 (Closed): Wiring and assembly equipment panel box
- - Wiring HMI Box
- Wiring Master control box - 10:55 Project progress work #835 (Closed): EE Drawing deisgn
- - Make drawing diagram
- Part list
- Make PO