FUJI NAME (THAILAND) CO.,LTD - Project progress work #1056: [Installation&On-site support] Project progress work #1056: [Installation&On-site support]

Project: FUJI NAME (THAILAND) CO.,LTD
Status: New
Start date: 01 Mar 2025
Due date: 30 Jul 2025
Assignee: Anek Sanohkham
Priority: Normal
FUJI NAME (THAILAND) CO.,LTD - Project progress work #1055: [Coding] Project progress work #1055: [Coding]

Project: FUJI NAME (THAILAND) CO.,LTD
Status: New
Start date: 01 Mar 2025
Due date: 30 Jul 2025
Assignee: Anek Sanohkham
Priority: Normal
FUJI NAME (THAILAND) CO.,LTD - Project progress work #1054: [Internal Design] Project progress work #1054: [Internal Design]

Project: FUJI NAME (THAILAND) CO.,LTD
Status: New
Start date: 01 Mar 2025
Due date: 30 Jul 2025
Assignee: Anek Sanohkham
Priority: Normal
FUJI NAME (THAILAND) CO.,LTD - Project progress work #1053: [Requirement definition] Project progress work #1053: [Requirement definition]

Project: FUJI NAME (THAILAND) CO.,LTD
Status: New
Start date: 01 Mar 2025
Due date: 30 Jul 2025
Assignee: Anek Sanohkham
Priority: Normal
FUJI NAME (THAILAND) CO.,LTD - Parent project #1052: [PJ250018] ConMas i-Reporte... Parent project #1052: [PJ250018] ConMas i-Reporter 100 users On-premises for Fuji Name

Project: FUJI NAME (THAILAND) CO.,LTD
Status: In Progress
Start date: 01 Mar 2025
Due date: 30 Jul 2025
Assignee: Anek Sanohkham
Priority: Normal
SIAM NITORI Co., Ltd. - Project progress work #1016: Asprova Phase 2 Implementat... Project progress work #1016: Asprova Phase 2 Implementation

Project: SIAM NITORI Co., Ltd.
Status: New
Start date: 08 Jul 2025
Due date: 30 Jul 2025
Assignee: Yuki Osawa
Priority: High

31

1

FILCON FABRICS & TECHNOLOGY CO.,LTD. - Project progress work #1095: [Installation&On-site support] Project progress work #1095: [Installation&On-site support]

Project: FILCON FABRICS & TECHNOLOGY CO.,LTD.
Status: New
Start date: 01 Aug 2025
Due date: 01 Aug 2025
Assignee: Anek Sanohkham
Priority: Normal
FILCON FABRICS & TECHNOLOGY CO.,LTD. - Project progress work #1094: [Coding] Project progress work #1094: [Coding]

Project: FILCON FABRICS & TECHNOLOGY CO.,LTD.
Status: New
Start date: 01 Aug 2025
Due date: 01 Aug 2025
Assignee: Anek Sanohkham
Priority: Normal
FILCON FABRICS & TECHNOLOGY CO.,LTD. - Project progress work #1093: [Internal Design] Project progress work #1093: [Internal Design]

Project: FILCON FABRICS & TECHNOLOGY CO.,LTD.
Status: New
Start date: 01 Aug 2025
Due date: 01 Aug 2025
Assignee: Anek Sanohkham
Priority: Normal
FILCON FABRICS & TECHNOLOGY CO.,LTD. - Project progress work #1092: [Requirement definition] Project progress work #1092: [Requirement definition]

Project: FILCON FABRICS & TECHNOLOGY CO.,LTD.
Status: New
Start date: 01 Aug 2025
Due date: 01 Aug 2025
Assignee: Anek Sanohkham
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1008: Warehouse management system... Project progress work #1008: Warehouse management system (Thai Inaba food)

Project: TOMAS TECH CO., LTD.
Status: In Progress
Start date: 04 Jun 2025
Due date: 01 Aug 2025
Assignee: Priroj Neamjarn
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Project progress work #1005: Warehouse management system Project progress work #1005: Warehouse management system

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 04 Jun 2025
Due date: 01 Aug 2025
Assignee: Priroj Neamjarn
Priority: Normal
FILCON FABRICS & TECHNOLOGY CO.,LTD. - Parent project #931: [PJ250019] ConMas i-Reporte... Parent project #931: [PJ250019] ConMas i-Reporter 10 users On-premises

Project: FILCON FABRICS & TECHNOLOGY CO.,LTD.
Status: New
Start date: 01 Aug 2025
Due date: 01 Aug 2025
Assignee: Anek Sanohkham
Priority: Normal
THAI MATTO NS CO., LTD. - Project progress work #1596: [Coding] Software test Project progress work #1596: [Coding] Software test

Project: THAI MATTO NS CO., LTD.
Status: In Progress
Start date: 01 Aug 2025
Due date: 28 Nov 2025
Assignee: Kittisak Isarapongporn
Priority: Normal
A.N.I. LOGISTICS, LTD. - Parent project #1058: [PJ250037] CKD system Phase 06 Parent project #1058: [PJ250037] CKD system Phase 06

Project: A.N.I. LOGISTICS, LTD.
Status: In Progress
Start date: 01 Aug 2025
Due date: 27 Dec 2025
Assignee: Kittisak Isarapongporn
Priority: Normal

2

32

3

4

5

6

7

8

9

33

10

11

12

13

FTS AUTOMOTIVE (THAILAND) CO.,LTD - Parent project #1279: [PJ250040] FTS TH Blow Mold... Parent project #1279: [PJ250040] FTS TH Blow Mold#2 IoT system 100%

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: In Progress
Start date: 13 Aug 2025
Due date: 01 Dec 2025
Assignee: Nattapol Poeam
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1214: Find WH and making list Project progress work #1214: Find WH and making list

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 13 Aug 2025
Due date: 14 Aug 2025
Assignee: Nattawat Hannok
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1211: Rental Warehouse Project progress work #1211: Rental Warehouse

Project: TOMAS TECH CO., LTD.
Status: In Progress
Start date: 13 Aug 2025
Due date: 25 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal

14

TOMAS TECH CO., LTD. - Project progress work #1214: Find WH and making list Project progress work #1214: Find WH and making list

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 13 Aug 2025
Due date: 14 Aug 2025
Assignee: Nattawat Hannok
Priority: Normal
THAI ASAHI DENSO CO., LTD. - Parent project #1284: [PJ250039] Infrastructure I... Parent project #1284: [PJ250039] Infrastructure IoT system for Thai Asahi Denso

Project: THAI ASAHI DENSO CO., LTD.
Status: In Progress
Start date: 14 Aug 2025
Due date: 18 Jan 2026
Assignee: Nattapol Poeam
Priority: Normal

15

THAI INABA FOODS COMPANY LIMITED - Project progress work #1015: [Cording] Warehouse managem... Project progress work #1015: [Cording] Warehouse management system PHP

Project: THAI INABA FOODS COMPANY LIMITED
Status: New
Start date: 01 Jul 2025
Due date: 15 Aug 2025
Assignee: Nattaporn Chaiya
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Project progress work #871: [Documentation] Get require... Project progress work #871: [Documentation] Get requirements of project

Project: THAI INABA FOODS COMPANY LIMITED
Status: Close request
Start date: 01 Jul 2025
Due date: 15 Aug 2025
Assignee: Kittisak Isarapongporn
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1213: Spec meeting Robot Palletiz... Project progress work #1213: Spec meeting Robot Palletizer (Kao)

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 15 Aug 2025
Due date: 01 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal

16

34

17

18

THAI INABA FOODS COMPANY LIMITED - Project progress work #1449: [Coding] Software test and ... Project progress work #1449: [Coding] Software test and fixed

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 18 Aug 2025
Due date: 22 Aug 2025
Assignee: Nattaporn Chaiya
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1227: Estimate cost for Thai Yoko... Project progress work #1227: Estimate cost for Thai Yokorei (DAIFUKU)

Project: TOMAS TECH CO., LTD.
Status: Confirmation request
Start date: 18 Aug 2025
Due date:
Assignee: Warit Chunlaka
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1223: [Requirement definition] Project progress work #1223: [Requirement definition]

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 18 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1209: Estimate cost for Thai Yoko... Project progress work #1209: Estimate cost for Thai Yokorei (DAIFUKU)

Project: TOMAS TECH CO., LTD.
Status: Confirmation request
Start date: 18 Aug 2025
Due date: 19 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal

19

TOMAS TECH CO., LTD. - Project progress work #1209: Estimate cost for Thai Yoko... Project progress work #1209: Estimate cost for Thai Yokorei (DAIFUKU)

Project: TOMAS TECH CO., LTD.
Status: Confirmation request
Start date: 18 Aug 2025
Due date: 19 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal
THAI MATTO NS CO., LTD. - Project progress work #1555: [Coding] Master management Project progress work #1555: [Coding] Master management

Project: THAI MATTO NS CO., LTD.
Status: In Progress
Start date: 19 Aug 2025
Due date: 27 Dec 2025
Assignee:
Priority: Normal

20

TOMAS TECH CO., LTD. - Project progress work #1212: Second hand Robot ( JCU - P... Project progress work #1212: Second hand Robot ( JCU - Palletizer )

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 20 Aug 2025
Due date: 26 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1210: Standard for ME-Drawing Tem... Project progress work #1210: Standard for ME-Drawing Template / Parts list format

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 20 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal

21

22

THAI INABA FOODS COMPANY LIMITED - Project progress work #1449: [Coding] Software test and ... Project progress work #1449: [Coding] Software test and fixed

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 18 Aug 2025
Due date: 22 Aug 2025
Assignee: Nattaporn Chaiya
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1226: Estimate cost for DAIFUKU -... Project progress work #1226: Estimate cost for DAIFUKU - PCG WET4

Project: TOMAS TECH CO., LTD.
Status: Confirmation request
Start date: 22 Aug 2025
Due date: 26 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal

23

TOMAS TECH CO., LTD. - Project progress work #1216: Appointment to Survey and S... Project progress work #1216: Appointment to Survey and Summary final data

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 23 Aug 2025
Due date: 25 Aug 2025
Assignee: Nattawat Hannok
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1215: Sent the list to Ryo san ch... Project progress work #1215: Sent the list to Ryo san choose

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 23 Aug 2025
Due date: 25 Aug 2025
Assignee: Nattawat Hannok
Priority: Normal
35

24

25

TOMAS TECH CO., LTD. - Project progress work #1216: Appointment to Survey and S... Project progress work #1216: Appointment to Survey and Summary final data

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 23 Aug 2025
Due date: 25 Aug 2025
Assignee: Nattawat Hannok
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1215: Sent the list to Ryo san ch... Project progress work #1215: Sent the list to Ryo san choose

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 23 Aug 2025
Due date: 25 Aug 2025
Assignee: Nattawat Hannok
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1211: Rental Warehouse Project progress work #1211: Rental Warehouse

Project: TOMAS TECH CO., LTD.
Status: In Progress
Start date: 13 Aug 2025
Due date: 25 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal
NTPT COMPANY LIMITED. - Project progress work #1298: [Requirement definition] Project progress work #1298: [Requirement definition]

Project: NTPT COMPANY LIMITED.
Status: New
Start date: 25 Aug 2025
Due date: 14 Sep 2025
Assignee: Nattapol Poeam
Priority: Normal
NTPT COMPANY LIMITED. - Parent project #1289: [PJ250052] Infrastructure I... Parent project #1289: [PJ250052] Infrastructure IoT system for NTN Manufacturing(Thailand) NTPT

Project: NTPT COMPANY LIMITED.
Status: In Progress
Start date: 25 Aug 2025
Due date: 19 Jan 2026
Assignee: Nattapol Poeam
Priority: Normal
ASIAN STANLEY. INTERNATIONAL LIMITED. - Parent project #1244: [PJ250047] Process control ... Parent project #1244: [PJ250047] Process control system project modification report 10%

Project: ASIAN STANLEY. INTERNATIONAL LIMITED.
Status: In Progress
Start date: 25 Aug 2025
Due date: 08 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
TOMAS TECH CO., LTD. - Sales support #1229: Palletizer - Kao (Concept) Sales support #1229: Palletizer - Kao (Concept)

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 25 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal

26

TOMAS TECH CO., LTD. - Project progress work #1226: Estimate cost for DAIFUKU -... Project progress work #1226: Estimate cost for DAIFUKU - PCG WET4

Project: TOMAS TECH CO., LTD.
Status: Confirmation request
Start date: 22 Aug 2025
Due date: 26 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1212: Second hand Robot ( JCU - P... Project progress work #1212: Second hand Robot ( JCU - Palletizer )

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 20 Aug 2025
Due date: 26 Aug 2025
Assignee: Warit Chunlaka
Priority: Normal

27

28

29

30

36

31

1

TOMAS TECH CO., LTD. - Project progress work #1213: Spec meeting Robot Palletiz... Project progress work #1213: Spec meeting Robot Palletizer (Kao)

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 15 Aug 2025
Due date: 01 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
ATA CASTING TECHNOLOGY CO., LTD. - Project progress work #1218: [Requirements definition] Project progress work #1218: [Requirements definition]

Project: ATA CASTING TECHNOLOGY CO., LTD.
Status: New
Start date: 01 Sep 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal
ATA CASTING TECHNOLOGY CO., LTD. - Parent project #1217: [PJ250051] Change location ... Parent project #1217: [PJ250051] Change location SR1000 traceability NMT line for ATA 50%

Project: ATA CASTING TECHNOLOGY CO., LTD.
Status: In Progress
Start date: 01 Sep 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal

2

NIPPN (THAILAND) CO., LTD. - Parent project #1290: [PJ250053] WIFI Wiring for ... Parent project #1290: [PJ250053] WIFI Wiring for NIPPN (Thailand) Co.,Ltd.

Project: NIPPN (THAILAND) CO., LTD.
Status: In Progress
Start date: 02 Sep 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal

3

LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2707: [Installation&On-site support] Project progress work #2707: [Installation&On-site support]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2706: [Coding] Project progress work #2706: [Coding]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2705: [Internal Design] Project progress work #2705: [Internal Design]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2704: [Requirement definition] Project progress work #2704: [Requirement definition]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Parent project #2703: [PJ250065] CKD system for L... Parent project #2703: [PJ250065] CKD system for Logistics Alliance (Thailand) CO.,LTD - CYLC 100%

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: In Progress
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2702: [Installation&On-site support] Project progress work #2702: [Installation&On-site support]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2701: [Coding] Project progress work #2701: [Coding]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2700: [Internal Design] Project progress work #2700: [Internal Design]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2699: [Requirement definition] Project progress work #2699: [Requirement definition]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Parent project #2698: [PJ250064] CKD modification... Parent project #2698: [PJ250064] CKD modification function Scope: Development of SoW stock CKD end month

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: In Progress
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal

4

5

TOMAS TECH CO., LTD. - Sales support #1229: Palletizer - Kao (Concept) Sales support #1229: Palletizer - Kao (Concept)

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 25 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1223: [Requirement definition] Project progress work #1223: [Requirement definition]

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 18 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
TOMAS TECH CO., LTD. - Project progress work #1210: Standard for ME-Drawing Tem... Project progress work #1210: Standard for ME-Drawing Template / Parts list format

Project: TOMAS TECH CO., LTD.
Status: New
Start date: 20 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal

6

FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #1283: [Installation&On-site support] Project progress work #1283: [Installation&On-site support]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 06 Sep 2025
Due date: 01 Dec 2025
Assignee:
Priority: Normal
THAI MATTO NS CO., LTD. - Project progress work #1166: [Coding] Schedule Project progress work #1166: [Coding] Schedule

Project: THAI MATTO NS CO., LTD.
Status: In Progress
Start date: 06 Sep 2025
Due date: 27 Dec 2025
Assignee:
Priority: Normal

issue beginning this day issue ending this day issue beginning and ending this day