27 Dec 2025

13:23 NIPPN (THAILAND) CO., LTD. Parent project #3399 (In Progress): [PJ250110] WIFI Wiring modification work for NIPPN (Thailand) Co.,Ltd.
Installation
Infrastructure cost & Configuration Access point and Switch
Siriwilai Chaiwattanaphon
13:16 NIHON SHINKAN (THAILAND) CO.,LTD. Parent project #3398 (In Progress): [PJ250109] CosMas i-Reporter 05 users to 10 users Cloud
Software
1.1 Basic Package Software
*ConMas i-Reporter Cloud License Version
*05 users to 10 users (=number of ac...
Siriwilai Chaiwattanaphon
13:05 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Parent project #2903 (Closed): [PJ250096] Label
Siriwilai Chaiwattanaphon
09:32 A.N.I. LOGISTICS, LTD. Project progress work #2967 (Closed): [Installation&On-site support] Panel
Siriwilai Chaiwattanaphon
09:32 A.N.I. LOGISTICS, LTD. Project progress work #2966 (Closed): [Installation&On-site support] Trim
Siriwilai Chaiwattanaphon

26 Dec 2025

17:14 THAI MATTO NS CO., LTD. Project progress work #3391 (Closed): [Coding] PO Material (Manual)
Siriwilai Chaiwattanaphon
15:22 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3394 (New): [Requirement definition]
Siriwilai Chaiwattanaphon
15:20 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3394 (New): [Requirement definition]
Siriwilai Chaiwattanaphon
15:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3397 (New): [Installation&On-site support]
Siriwilai Chaiwattanaphon
15:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3396 (New): [Coding]
Siriwilai Chaiwattanaphon
15:21 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3395 (New): [Internal Design]
Siriwilai Chaiwattanaphon
15:18 NICHIDEN TRADING (THAILAND) CO., LTD. Parent project #3393 (In Progress): [PJ250108] ConMas i-Reporter 150 users On-premises
1. Software
1.1 Basic Package Software 1 set
*ConMas i-Reporter On-premise License Version
*150 users(=number of a...
Siriwilai Chaiwattanaphon
15:14 YAMATO ELECTRIC (THAILAND) CO., LTD. Parent project #2778: [PJ250077] Stock and process "Pegasus" Phase1 for YAMATO ELECTRIC (THAILAND) CO.,LTD.
LABEL FOR WS PRINTER SIZE 85*55 MM 560PCS/ROLL Q'TY 30 SET
LABEL FOR PW PRINTER SIZE 85*55 MM 130PCS/ROLL Q'TY 25 SET
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1366 (Closed): [Coding] Software development (Handy)
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1374 (Closed): [Coding] Create label template for QC Type & Modify label template
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1373 (Closed): [Coding] Return parts to WH
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1372 (Closed): [Coding] Outbound Purge material L3 - Assy & Inj & Press
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1371 (Closed): [Coding] Inbound WIP - Inj & Press
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1370 (Closed): [Coding] Mix material
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1369 (Closed): [Coding] Inbound FG - Assy
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1368 (Closed): [Coding] Confirm material before production
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1185 (Closed): [Installation&On-site support]
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1367 (Closed): [Coding] Inbound Material - WH
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1667 (Closed): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1666 (Closed): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1665 (Closed): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1664 (Closed): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1663 (Closed): [Installation&On-site support] trainning User Inj/Press
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1662 (Closed): [Installation&On-site support] trainning User WH/Assy
Siriwilai Chaiwattanaphon
15:09 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1661 (Closed): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1660 (Closed): [Installation&On-site support] Software installation
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1184 (Closed): [Coding] Software development (Web)
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1204 (Closed): [Coding] Add Setting hide show column (Stock Inquiry/Report, Stock Inventory Report)
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1205 (Closed): [Coding] Add Language menu english to japanese
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1203 (Closed): [Coding] Add new page Report QC Page
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1202 (Closed): [Coding] Purchase instructions 3 months change to 4 months
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1201 (Closed): [Coding] Add new Report stockcard (open,rec,issue,stock) Page
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1200 (Closed): [Coding] Add new page Report delivery (monthly delivery report) Page
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1199 (Closed): [Coding] Gen pdf Assembly Order Sheet Report (Assy,Press,Inj)
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1198 (Closed): [Coding] Add new page & Implement QC process for production (Assy, Inj, Press)
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1197 (Closed): [Coding] Modify generate production schedule
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1196 (Closed): [Coding] Add new page master data ng detail
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1195 (Closed): [Coding] Add new page Schedule QC material
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1194 (Closed): [Coding] Implement QC process for purchase orders (Po, Pr) *wait AQL data
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1193 (Closed): [Coding] Add new page Report warehouse (monthly inventory report) Page
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1192 (Closed): [Coding] Add new page Report delivery (weekly delivery report) Page
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1191 (Closed): [Coding] Add new master data page (machine)
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1190 (Closed): [Coding] Add new master data page (line)
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1189 (Closed): [Coding] Search by part_name on page (stock inventory report) Search By part_name page stock_inquiry_report
Siriwilai Chaiwattanaphon
15:06 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1188 (Closed): [Coding] Import schedule production (assy, press, inj) and delivery for 1 months to 4 months
Siriwilai Chaiwattanaphon
15:06 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web
Siriwilai Chaiwattanaphon
15:06 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java
Siriwilai Chaiwattanaphon
15:06 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1000 (Closed): [Change requirement] Meeting Change requirement of HT
Siriwilai Chaiwattanaphon
15:06 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #797 (Closed): [Installation] HT_YDT WMS
Siriwilai Chaiwattanaphon
14:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3340 (In Progress): [Installation&On-site support]
Siriwilai Chaiwattanaphon
14:42 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3337 (Closed): [Requirement definition]
Siriwilai Chaiwattanaphon
14:40 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3338 (Closed): [Internal Design]
Siriwilai Chaiwattanaphon
14:39 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3339 (Closed): [Coding] EDI New Label
Siriwilai Chaiwattanaphon

25 Dec 2025

11:17 THAI ASAHI DENSO CO., LTD. Project progress work #2932 (Closed): [Installation&On-site support] SIT Production system
Siriwilai Chaiwattanaphon
09:37 THAI ASAHI DENSO CO., LTD. Project progress work #2948 (Closed): [Installation&On-site support] Calling system
Siriwilai Chaiwattanaphon
09:37 THAI ASAHI DENSO CO., LTD. Project progress work #2947 (Closed): [Installation&On-site support] Alarm monitoring
Siriwilai Chaiwattanaphon
09:36 THAI ASAHI DENSO CO., LTD. Project progress work #2950 (Closed): [Installation&On-site support] Utility data monitoring
Siriwilai Chaiwattanaphon
09:36 THAI ASAHI DENSO CO., LTD. Project progress work #2949 (Closed): [Installation&On-site support] Utility monitoring
Siriwilai Chaiwattanaphon
09:35 THAI ASAHI DENSO CO., LTD. Project progress work #1287 (Closed): [Coding] Web application
Siriwilai Chaiwattanaphon
09:35 THAI ASAHI DENSO CO., LTD. Project progress work #3184 (Closed): [Coding] Update line name and map lamp in 3D Production Monitoring
Siriwilai Chaiwattanaphon

24 Dec 2025

17:11 THAI MATTO NS CO., LTD. Project progress work #3392 (New): [Coding] Image master for stamping
Siriwilai Chaiwattanaphon
17:08 THAI MATTO NS CO., LTD. Project progress work #3391 (Closed): [Coding] PO Material (Manual)
Siriwilai Chaiwattanaphon
15:20 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Parent project #3390: [PJ2500107] Traceability system for NTMT RFID concept
Traceability system for NTMT RFID concept
1. Hardware
1.1 RFID Reader units SID-RDT-U816-SRIP Q'ty 4 sets
1.2 R...
Siriwilai Chaiwattanaphon
15:10 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Parent project #3390 (In Progress): [PJ2500107] Traceability system for NTMT RFID concept
Siriwilai Chaiwattanaphon
14:54 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1006 (Closed): [Change requirement] Meeting get new requirement
Siriwilai Chaiwattanaphon
14:54 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1006 (Interruption): [Change requirement] Meeting get new requirement
Siriwilai Chaiwattanaphon
14:53 YAMATO ELECTRIC (THAILAND) CO., LTD. Parent project #3389 (Closed): [PJ2500106] Label for WS Printer
LABEL FOR WS PRINTER SIZE 85*55 MM 560PCS/ROLL Q'TY 30 SET Siriwilai Chaiwattanaphon
13:52 THAI MATTO NS CO., LTD. Project progress work #3388 (New): [Installation&On-site support] WS controller installation
Siriwilai Chaiwattanaphon
13:49 THAI MATTO NS CO., LTD. Project progress work #3387 (New): [Coding] Process control
Siriwilai Chaiwattanaphon
13:47 THAI MATTO NS CO., LTD. Project progress work #3386 (New): [Coding] WH/Picking Plan(Others) FIX
Siriwilai Chaiwattanaphon
13:46 THAI MATTO NS CO., LTD. Project progress work #3385 (New): [Coding] WH/Picking Plan(Packaging) FIX
Siriwilai Chaiwattanaphon
13:46 THAI MATTO NS CO., LTD. Project progress work #3384 (New): [Coding] WH/Picking Plan(Pigment/Additive) FIX
Siriwilai Chaiwattanaphon
13:45 THAI MATTO NS CO., LTD. Project progress work #3383 (New): [Coding] WH/Picking Plan(Resin) FIX
Siriwilai Chaiwattanaphon
13:44 THAI MATTO NS CO., LTD. Project progress work #3382 (New): [Coding] WH/RM Receive (OCR)
Siriwilai Chaiwattanaphon
13:31 THAI MATTO NS CO., LTD. Project progress work #3381 (New): [Coding] Color matching Backend
Siriwilai Chaiwattanaphon
13:30 THAI MATTO NS CO., LTD. Project progress work #3380 (New): [Coding] Color matching Frontend
Siriwilai Chaiwattanaphon
13:17 THAI MATTO NS CO., LTD. Project progress work #3284 (Closed): [Coding] Quotation Master
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3283 (Closed): [Coding] PO Merchandize Order FIX
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3282 (Closed): [Coding] PO Stock Order FIX
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3281 (Closed): [Coding] PO Order FIX
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3379 (New): [Coding] Production Planning (Work Instruction Sheet) FIX Image
Siriwilai Chaiwattanaphon
13:12 THAI MATTO NS CO., LTD. Project progress work #3378 (New): [Coding] Outbound Schedule Detail FIX
Siriwilai Chaiwattanaphon
13:12 THAI MATTO NS CO., LTD. Project progress work #3377 (New): [Codin] Inbound Schedule Detail Fix
Siriwilai Chaiwattanaphon
13:10 THAI MATTO NS CO., LTD. Project progress work #1537 (In Progress): [Coding] Outbound
Siriwilai Chaiwattanaphon
13:10 THAI MATTO NS CO., LTD. Project progress work #1530 (In Progress): [Coding] Inbound
Siriwilai Chaiwattanaphon

23 Dec 2025

16:29 A.N.I. LOGISTICS, LTD. Project progress work #3371 (Closed): [Installation&On-site support] Modification: Inner packing & Q-Gate take photo(PANEL)
Siriwilai Chaiwattanaphon
16:04 A.N.I. LOGISTICS, LTD. Project progress work #3371 (Closed): [Installation&On-site support] Modification: Inner packing & Q-Gate take photo(PANEL)
Siriwilai Chaiwattanaphon
16:29 A.N.I. LOGISTICS, LTD. Project progress work #3369 (Closed): [Installation&On-site support] Modification: Inner packing multiple device scan add issue (PANEL)
Siriwilai Chaiwattanaphon
16:01 A.N.I. LOGISTICS, LTD. Project progress work #3369 (Closed): [Installation&On-site support] Modification: Inner packing multiple device scan add issue (PANEL)
Siriwilai Chaiwattanaphon
16:29 A.N.I. LOGISTICS, LTD. Project progress work #3370 (Closed): [Installation&On-site support]
Siriwilai Chaiwattanaphon
16:02 A.N.I. LOGISTICS, LTD. Project progress work #3370 (Closed): [Installation&On-site support]
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3368 (Closed): [Installation&On-site sdupport] Modification: Inner packing multiple device scan(PANEL)
Siriwilai Chaiwattanaphon
16:00 A.N.I. LOGISTICS, LTD. Project progress work #3368 (Closed): [Installation&On-site sdupport] Modification: Inner packing multiple device scan(PANEL)
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3356 (Closed): [Installation&On-site support] Weight scale installation & wiring
Siriwilai Chaiwattanaphon
14:14 A.N.I. LOGISTICS, LTD. Project progress work #3356 (Closed): [Installation&On-site support] Weight scale installation & wiring
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3357 (Closed): [Installation&On-site support] Weight scale installation 2 units
Siriwilai Chaiwattanaphon
14:15 A.N.I. LOGISTICS, LTD. Project progress work #3357 (Closed): [Installation&On-site support] Weight scale installation 2 units
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3367 (Closed): [Installation&Onsite support] Modification: Switch table
Siriwilai Chaiwattanaphon
16:00 A.N.I. LOGISTICS, LTD. Project progress work #3367 (Closed): [Installation&Onsite support] Modification: Switch table
Siriwilai Chaiwattanaphon
16:17 A.N.I. LOGISTICS, LTD. Project progress work #3376 (New): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
16:07 A.N.I. LOGISTICS, LTD. Project progress work #3375 (New): [Installation&Onsite support] Monitoring program install
Siriwilai Chaiwattanaphon
16:06 A.N.I. LOGISTICS, LTD. Project progress work #3374 (New): [Installation&Onsite support] On-line program modification
Siriwilai Chaiwattanaphon
16:05 A.N.I. LOGISTICS, LTD. Project progress work #3373 (New): [Installation&On-site support] Pre-Go live for 1line
Siriwilai Chaiwattanaphon
16:04 A.N.I. LOGISTICS, LTD. Project progress work #3372 (New): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:59 A.N.I. LOGISTICS, LTD. Project progress work #3366 (New): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
14:27 A.N.I. LOGISTICS, LTD. Project progress work #3365 (New): [Installation&On-site support] User Testing & Trial (WC)
Siriwilai Chaiwattanaphon
14:21 A.N.I. LOGISTICS, LTD. Project progress work #3363 (Closed): [Installation&On-site support] SD card installation 7units testing
Siriwilai Chaiwattanaphon
14:18 A.N.I. LOGISTICS, LTD. Project progress work #3363 (Closed): [Installation&On-site support] SD card installation 7units testing
Siriwilai Chaiwattanaphon
14:21 A.N.I. LOGISTICS, LTD. Project progress work #2991 (Closed): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
14:07 A.N.I. LOGISTICS, LTD. Project progress work #2991 (In Progress): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2991 (Closed): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2975 (Closed): [Installation&On-site support] Import master weight data
Siriwilai Chaiwattanaphon
14:04 A.N.I. LOGISTICS, LTD. Project progress work #2975 (In Progress): [Installation&On-site support] Import master weight data
Siriwilai Chaiwattanaphon
13:35 A.N.I. LOGISTICS, LTD. Project progress work #2975 (Closed): [Installation&On-site support] Import master weight data
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2967 (In Progress): [Installation&On-site support] Panel
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2967 (Close request): [Installation&On-site support] Panel
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2983 (Closed): [Installation&On-site support] UAT of weight scale (9 Set)
Siriwilai Chaiwattanaphon
14:06 A.N.I. LOGISTICS, LTD. Project progress work #2983 (In Progress): [Installation&On-site support] UAT of weight scale (9 Set)
Siriwilai Chaiwattanaphon
13:38 A.N.I. LOGISTICS, LTD. Project progress work #2983 (Closed): [Installation&On-site support] UAT of weight scale (9 Set)
Siriwilai Chaiwattanaphon
14:19 A.N.I. LOGISTICS, LTD. Project progress work #3362 (Closed): [Installation&On-site support] SD card installation 7units
Siriwilai Chaiwattanaphon
14:18 A.N.I. LOGISTICS, LTD. Project progress work #3362 (Closed): [Installation&On-site support] SD card installation 7units
Siriwilai Chaiwattanaphon
14:19 A.N.I. LOGISTICS, LTD. Project progress work #3360 (Closed): [Installation&On-site support] Weight scale installation 7 units
Siriwilai Chaiwattanaphon
14:17 A.N.I. LOGISTICS, LTD. Project progress work #3360 (Closed): [Installation&On-site support] Weight scale installation 7 units
Siriwilai Chaiwattanaphon
14:19 A.N.I. LOGISTICS, LTD. Project progress work #3364 (New): [Installation&On-site support] SD card installation 8units
Siriwilai Chaiwattanaphon
14:17 A.N.I. LOGISTICS, LTD. Project progress work #3361 (New): [Installation&On-site support] Weight scale config&testing 7 units
Siriwilai Chaiwattanaphon
14:16 A.N.I. LOGISTICS, LTD. Project progress work #3359 (New): [Installation&On-site support] Weight scale config&testing 2 units
Siriwilai Chaiwattanaphon
14:15 A.N.I. LOGISTICS, LTD. Project progress work #3358 (New): [Installation&On-site support] Weight scale config&testing 2 units
Siriwilai Chaiwattanaphon
14:13 A.N.I. LOGISTICS, LTD. Project progress work #3355 (New): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
14:13 A.N.I. LOGISTICS, LTD. Project progress work #3354 (New): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2990 (Closed): Installation&On-site support] Install Hardware weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2989 (Closed): [Installation&On-site support] Modify Label Tag Receive (Test)
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2988 (Closed): [Installation&On-site support] Training User
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2987 (Closed): [Installation&On-site support] Import master Ocr-Qpoint check
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2986 (Closed): [Installation&On-site support] Handy Set IP and Install APK 22 devices
Siriwilai Chaiwattanaphon
13:39 A.N.I. LOGISTICS, LTD. Project progress work #2985 (Closed): [Installation&On-site support] Create Table Master
Siriwilai Chaiwattanaphon
13:38 A.N.I. LOGISTICS, LTD. Project progress work #2984 (Closed): [Installation&On-site support] Install WebSocket controller Panel
Siriwilai Chaiwattanaphon
13:38 A.N.I. LOGISTICS, LTD. Project progress work #2982 (Closed): [Installation&On-site support] Install Hardware weight scale (9 Set)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2981 (Closed): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2980 (Closed): [Installation&On-site support] Install Hardware weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2978 (Closed): [Installation&On-site support] Internal Test IV/IM
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2979 (Closed): [Installation&On-site support] Modify Label Tag Receive (Test)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #1066 (Closed): [Coding] Handy development
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2977 (Closed): [Installation&On-site support] Modify web socket
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2976 (Closed): [Installation&On-site support] Training User
Siriwilai Chaiwattanaphon
13:35 A.N.I. LOGISTICS, LTD. Project progress work #2974 (Closed): [Installation&On-site support] Import master program IM data / UAT IM Process
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2973 (Closed): [Installation&On-site support] Import master program IV data / UAT IV Process
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2972 (Closed): [Installation&On-site support] UAT Inner packing Process PC with Handy
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2971 (Closed): [Installation&On-site support] Import master Ocr-Qpoint check
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2970 (Closed): [Installation&On-site support] Handy Set IP and Install APK 41 devices
Siriwilai Chaiwattanaphon
10:04 THAI MATTO NS CO., LTD. Project progress work #3353 (New): [Installation&On-site support] Onsite support
Siriwilai Chaiwattanaphon
10:04 THAI MATTO NS CO., LTD. Project progress work #3352 (New): [Installation&On-site support] Onsite support
Siriwilai Chaiwattanaphon
10:03 THAI MATTO NS CO., LTD. Project progress work #3351 (New): [Installation&On-site support] Onsite support
Siriwilai Chaiwattanaphon
09:57 PROSPIRA THAILAND CO., LTD. Project progress work #3350 (In Progress): [Installation&On-site support] Onsite support issue and request
Siriwilai Chaiwattanaphon
09:57 PROSPIRA THAILAND CO., LTD. Project progress work #3350 (In Progress): [Installation&On-site support] Onsite support issue and request
Siriwilai Chaiwattanaphon

22 Dec 2025

16:10 A.N.I. LOGISTICS, LTD. Project progress work #2969 (Closed): [Installation&On-site support] Create Table Master
Siriwilai Chaiwattanaphon
16:10 A.N.I. LOGISTICS, LTD. Project progress work #2968 (Closed): [Installation&On-site support] Install WebSocket controller Trim
Siriwilai Chaiwattanaphon
16:10 A.N.I. LOGISTICS, LTD. Project progress work #3349 (In Progress): [Installation&On-site support] UAT/Fix Issue/Go live
Siriwilai Chaiwattanaphon
16:10 A.N.I. LOGISTICS, LTD. Project progress work #3349 (Confirmation request): [Installation&On-site support] UAT/Fix Issue/Go live
Siriwilai Chaiwattanaphon
 