- 19:14 THAI MATTO NS CO., LTD. Project progress work #873 (In Progress): [Documentation] Get requirements of project
- 19:13 KEIAISHA(THAILAND)CO.,LTD. Project progress work #868 (Close request): [Documentation] Get requirements of project
- 19:11 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. Project progress work #865 (In Progress): [Documentation] Get requirements of project
- 19:08 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #638 (Close request): Support fix the data
- 19:07 NIPPON KONPO (THAILAND) CO., LTD. Project progress work #751 (In Progress): Design and get requirements
- 19:06 ACME INDUSTRY CO.,LTD. Project progress work #652 (Close request): System support and maintenance
- 19:05 KANEKA (THAILAND) CO., LTD. Project progress work #864 (Close request): Warehouse management system
- 19:03 TOMAS TECH CO., LTD. Project progress work #874 (Close request): Kittisak Isarapongporn Taking Day off January-December 2024
- 18:58 THAI INABA FOODS COMPANY LIMITED Project progress work #871 (Confirmation request): [Documentation] Get requirements of project
- 18:57 THAI INABA FOODS COMPANY LIMITED Project progress work #871 (In Progress): [Documentation] Get requirements of project
- 18:48 A.N.I. LOGISTICS, LTD. Project progress work #869 (Close request): [Documentation] Q-Gate - Get requirements of project
- 18:47 A.N.I. LOGISTICS, LTD. Project progress work #713 (Close request): [Documentation] CKD Phase4 - Get requirements of project
- 18:46 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #753 (Close request): Process Management System [Design & Get requirements]
- 18:43 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #754 (Close request): [Design] Design and consult
- 18:40 NTPT COMPANY LIMITED. Project progress work #504 (Close request): [Setting] Production planning system APS 500,000 work
- 18:32 TOMAS TECH CO., LTD. Project progress work #646 (Close request): WDT and smartwatch demo project
- 18:24 DENSO PHILIPPINES CORPORATION Project progress work #497 (Close request): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase02
- 18:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #653 (Close request): [Development] Software design and development
- 18:19 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD Project progress work #619 (Close request): Meeting
- 18:18 TOMAS TECH CO., LTD. Project progress work #498 (Interruption): [Coding] Web app Daily check project for tablet and pc
- 18:14 EBISU FOODS CO., LTD. Project progress work #649 (Close request): [Meeting] Document and assignment
- 18:11 TOMAS TECH CO., LTD. Project progress work #261 (Close request): Smart watch addtional function at Smartwatch and Web
- 18:04 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #479 (Close request): [Coding]Pegasus search speed improvement
- 17:55 ACME INDUSTRY CO.,LTD. Project progress work #204 (Close request): UAT about the WMS system and onsite support
- 17:53 A.N.I. LOGISTICS, LTD. Project progress work #130 (Close request): [Coding]Inner packing screen function C#
- 17:49 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #608 (Close request): [Documentation] Get requirements of project
- 17:47 DENSO PHILIPPINES CORPORATION Project progress work #113 (Close request): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01
- 17:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #803 (Close request): [Documentation] Get requirements of project
- 17:43 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #803 (Confirmation request): [Documentation] Get requirements of project
24 Dec 2024
- 22:51 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
- 22:47 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
- Meeting at on-site regarding PD, QA report
- 22:25 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
- 22:24 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
- 20:29 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 2.00 hours (Project progress work #692 (Closed): Design and get requirements)
- Meeting at on-site
- 20:28 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Project progress work #692 (In Progress): Design and get requirements
- 22:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project)
- Meeting at on-site regarding present spec rev1
- 22:46 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project)
- Prepare spec rev1
- 22:41 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project)
- Prepare spec rev1
- 22:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project)
- Prepare spec rev1
- 21:17 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project)
- 21:16 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project)
- 21:15 A.N.I. LOGISTICS, LTD. Project progress work #869 (Closed): [Documentation] Q-Gate - Get requirements of project
- 22:48 THAI MATTO NS CO., LTD. 4.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
- Meeting at on-site
- 22:22 THAI MATTO NS CO., LTD. 4.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
- Meeting at on-site
- 22:21 THAI MATTO NS CO., LTD. Project progress work #873 (Closed): [Documentation] Get requirements of project
- Get requirements, design, and prepare specification document
- 22:46 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 6.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
- Install raspi at on-site
- 20:41 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
- Meeting at on-site
- 20:39 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 7.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
- Installation of AWS and testing
- 22:45 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Meeting at on-site
- 20:23 YAMATO ELECTRIC (THAILAND) CO., LTD. 7.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Trial day 7
- 20:14 YAMATO ELECTRIC (THAILAND) CO., LTD. 5.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Trial day 5
- 20:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Trial day 4
- 20:12 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Trial day 3
- 20:12 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Trial day 2
- 22:42 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #866 (New): [Documentation] Get requirements of project)
- Meeting at on-site regarding transport system
- 22:26 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #866 (New): [Documentation] Get requirements of project)
- Meeting at on-site
- 22:26 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #866 (New): [Documentation] Get requirements of project)
- 22:25 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #866 (New): [Documentation] Get requirements of project)
- 21:02 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #866 (New): [Documentation] Get requirements of project)
- Meeting at on-site (Kick-off meeting)
- 20:49 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #866 (New): [Documentation] Get requirements of project)
- 20:49 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #866 (New): [Documentation] Get requirements of project
- 22:36 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #874 (Closed): Kittisak Isarapongporn Taking Day off January-December 2024)
- Sick leave
- 22:36 TOMAS TECH CO., LTD. Project progress work #874 (Closed): Kittisak Isarapongporn Taking Day off January-December 2024
- 22:29 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 2.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
- 20:47 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 4.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
- Meeting at on-site
- 20:47 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. Project progress work #865 (Closed): [Documentation] Get requirements of project
- 22:28 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
- 22:28 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 6.00 hours (Project progress work #658 (Closed): Documents and design)
- 21:47 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
- Meeting at on-site (Virtualization)
- 20:31 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 3.00 hours (Project progress work #658 (Closed): Documents and design)
- 20:30 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 2.00 hours (Project progress work #658 (Closed): Documents and design)
- Meeting at online
- 21:40 DENSO PHILIPPINES CORPORATION 8.00 hours (Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01)
- Move trigger signal to manufacturing DB
- 21:37 THAI INABA FOODS COMPANY LIMITED 4.00 hours (Project progress work #871 (Close request): [Documentation] Get requirements of project)
- Meeting at on-site
- 21:36 THAI INABA FOODS COMPANY LIMITED Project progress work #871 (Close request): [Documentation] Get requirements of project
- 21:10 A.N.I. LOGISTICS, LTD. Project progress work #867 (In Progress): [Documentation] IKD - Get requirements of project
- 21:01 A.N.I. LOGISTICS, LTD. 6.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
- Meeting at on-site
- 21:00 A.N.I. LOGISTICS, LTD. Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project
- 21:06 KEIAISHA(THAILAND)CO.,LTD. 4.00 hours (Project progress work #868 (Closed): [Documentation] Get requirements of project)
- Meeting at on-site
- 21:05 KEIAISHA(THAILAND)CO.,LTD. Project progress work #868 (Closed): [Documentation] Get requirements of project
- 20:37 MINEBEA ACCESSSOLUTIONS THAI LTD. 1.00 hour (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
- 20:36 MINEBEA ACCESSSOLUTIONS THAI LTD. Problem-Bug #609 (Close request): [Problem] Fix the print queue hold problem of Handy
- 20:36 MINEBEA ACCESSSOLUTIONS THAI LTD. Problem-Bug #609 (Confirmation request): [Problem] Fix the print queue hold problem of Handy
- 20:36 MINEBEA ACCESSSOLUTIONS THAI LTD. Problem-Bug #630 (Close request): Fix pegasus web page
- 20:35 MINEBEA ACCESSSOLUTIONS THAI LTD. Problem-Bug #630 (Confirmation request): Fix pegasus web page
- 20:26 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #671 (In Progress): [Meeting] Interview and other)
- Meeting regarding BOI interview
- 20:22 A.N.I. LOGISTICS, LTD. 1.00 hour (Parent project #712 (Closed): EKD System phase4 for ANI Ayuthaya)
- Regarding L3 switch summarize concept
- 20:15 A.N.I. LOGISTICS, LTD. 3.00 hours (Parent project #712 (Closed): EKD System phase4 for ANI Ayuthaya)
- Fix the scanner at on-site
- 20:20 KANEKA (THAILAND) CO., LTD. Project progress work #864 (In Progress): Warehouse management system
- 20:20 KANEKA (THAILAND) CO., LTD. 1.00 hour (Project progress work #864 (Closed): Warehouse management system)
- Meeting online and get rough requirements
- 20:19 KANEKA (THAILAND) CO., LTD. Project progress work #864 (Closed): Warehouse management system
- Improvement or enhancement of the WMS pegasus
- 20:10 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #667 (Close request): [Coding] Production line IoT monitoring system Keyence of PLC
- 20:10 THAI METALTECH CO., LTD. Project progress work #668 (Close request): Upgrade web interface
- 20:10 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD Project progress work #607 (Close request): [Coding] Web app Daily check project C#, HTML, CSS and JS
- 20:10 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. Project progress work #590 (Close request): [Coding] Warehouse management system handyterminal Java
- 20:10 THAI NIPPON FOODS CO., LTD. Problem-Bug #659 (Close request): water flow sensor error
- 20:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #648 (Close request): Check HT Software.
- 20:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #494 (Close request): STEP - Version upgrade development support
- 20:10 OTICS (THAILAND) CO., LTD. Project progress work #503 (Close request): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP
- 20:10 TOMAS TECH CO., LTD. Sales support #684 (Close request): HAMASHO AMR Concept
- 20:10 TOMAS TECH CO., LTD. Sales support #683 (Close request): Raspberry Pi
- 20:10 TOMAS TECH CO., LTD. Project progress work #677 (Close request): Weighing scale test (MATTO)
- 20:10 TOMAS TECH CO., LTD. Project progress work #651 (Close request): OTICS Dashboard in mast demo
- 20:10 A.N.I. LOGISTICS, LTD. Project progress work #131 (Close request): [Coding]Android handy and tablet modification Java
- 20:10 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #743 (Close request): Development EDI system
- 20:10 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #742 (Close request): Documents and Database EDI system
- 20:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #831 (Close request): Create a website
- 20:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #796 (Close request): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set
- 20:10 HAMADEN MEXICO S.A.DE C.V Project progress work #808 (Close request): Test connecting PLC with BTA500
- 20:10 HAMADEN MEXICO S.A.DE C.V Project progress work #694 (Close request): [Development] Software design and development
- 20:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #830 (Close request): Web theme migration
- 20:10 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #752 (Close request): Install HT Software and Server Onsite.
- 20:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #735 (Close request): PICS handy terminal Document.
- 20:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #734 (Close request): PICS - Handy Terminal - Test confirmation
- 20:10 AH BRAKE (THAILAND) CO., LTD. Project progress work #738 (Close request): [ Wring & Assembly ] Control cabinet
- 20:10 AH BRAKE (THAILAND) CO., LTD. Project progress work #685 (Close request): Rack Server drawing design and Audio test
- 20:10 TOMAS TECH CO., LTD. Sales support #834 (Close request): ADVICS Table Server
- 20:10 OTICS (THAILAND) CO., LTD. Project progress work #799 (Close request): Check Power meter
- 20:10 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #762 (Close request): Fix web problems
- 20:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #847 (Close request): PICS - Support handy terminal
- 20:10 TOMAS TECH CO., LTD. Project progress work #832 (Close request): Demo Pegasus
- 20:10 TOMAS TECH CO., LTD. Project progress work #811 (Close request): keyence Demo kit No.259
- 20:10 TOMAS TECH CO., LTD. Sales support #809 (Close request): METALEX 2024
- 20:10 TOMAS TECH CO., LTD. Project progress work #748 (Close request): ALPHA Design inspection station
- 20:10 TOMAS TECH CO., LTD. Sales support #745 (Close request): Pokayoke Inspection System-TOYOTA BOSHOKU SIAM METAL
- 20:10 TOMAS TECH CO., LTD. Sales support #744 (Close request): ATSUMITEC-Inspection station
- 20:10 TOMAS TECH CO., LTD. Sales support #711 (Close request): LAZADA Barcode reader systems
- 20:10 TOMAS TECH CO., LTD. Sales support #695 (Close request): Concept install label print and collection signal machine