Panupong Raksakit's activity
From 09 Nov 2024 to 18 Nov 2024
18 Nov 2024
- 16:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 16:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 16:31 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
15 Nov 2024
- 09:29 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:29 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:26 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:26 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:24 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:24 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Installation program PLC and HMI
- 09:24 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Installation program PLC and HMI
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Training Manul JTEKT infrastructure project
- 09:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Manul JTEKT infrastructure project
- 09:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Manul JTEKT infrastructure project
- 09:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
Also available in: Atom