- 17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 32/37
- 17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 33/37
- 17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 34/37
- 17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 35/37
- 17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 36/37
- 17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation 37/37
- 17:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 80.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- 17:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 10/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 9/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 8/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 7/10
- 17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 6/10
11 Sep 2024
- 15:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
- [Task] LAT - PICS- Conversion and Documents Creation
10 Sep 2024
- 10:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 5/10
- 10:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 4/10
- 10:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 3/10
- 10:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 2/10
- 10:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
- [Task] LAT - CAPS - Installation 1/10
- 10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- 10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 29/29
- 10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 28/29
- 10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 27/29
- 10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 26/29
- 10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 25/29
- 10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 24/29
- 10:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 23/29
- 10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 22/29
- 10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 21/29
- 10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 20/29
- 10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 19/29
- 10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 18/29
- 10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 17/29
- 10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 16/29
- 10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 15/29
- 10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 14/29
- 10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 13/29
- 10:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 12/29
- 10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 11/29
- 10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 10/29
- 10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 9/29
- 10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 8/29
- 10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 7/29
- 10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 6/29
- 10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 5/29
- 10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 4/29
- 10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 3/29
- 10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 2/29
- 10:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
- [Task] LAT - SALE - Operation test confirmation/Specification creation 1/29
- 10:04 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- 10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 29/29
- 10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 28/29
- 10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 27/29
- 10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 26/29
- 10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 25/29
- 10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 24/29
- 10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 23/29
- 10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 22/29
- 10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 21/29
- 10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 20/29
- 10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 18/29
- 10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 17/29
- 10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 17/29
- 10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 16/29
- 10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 15/29
- 09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 14/29
- 09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 13/29
- 09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 12/29
- 09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 11/29
- 09:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 10/29
- 09:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 9/29
- 09:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 7/29
- 09:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 6/29
- 09:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 4/29
- 09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- STEP - Operation test confirmation/Specification creation 2/29
- 09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 2/29
- 09:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Parent project #542 (Closed): [PJ240019] CKD system for Logistics Alliance (Thailand) CO.,LTD CYLC)
- [Task] LAT - STEP - Operation test confirmation/Specification creation 5/29
- 09:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- 09:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 29/29
- 09:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 28/29
- 09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 27/29
- 09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 26/29
- 09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 25/29
- 09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 24/29
- 09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 23/29
- 09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 22/29
- 09:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 21/29
- 09:32 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 19/29
- 09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 20/29
- 09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 19/29
- 09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 18/29
- 09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 17/29
- 09:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 16/29
- 09:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 14/29
- 09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 15/29
- 09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 14/29
- 09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 13/29
- 09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 12/29
- 09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 11/29
- 09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 10/29
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 9/29
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 8/29
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 7/29
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 6/29
- 09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 5/29
- 09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 4/29
- 09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 3/29
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 2/29
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
- [Task] LAT - REPO - Operation test confirmation/Specification creation 1/29
- 09:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 192.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- 09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 24/24
- 09:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 23/24
- 09:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 22/24
- 09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24
- 09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24
- 09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 20/24
- 09:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 19/24
- 09:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 18/24
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 17/24
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 16/24
- 09:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 15/24
- 09:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 14/24
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 13/24
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 12/24
- 09:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 11/24
- 09:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 10/24
- 09:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 9/24
- 09:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 8/24
- 09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 7/24
- 09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 6/24
- 09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 5/24
- 09:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 4/24
- 09:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 3/24
- 09:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
- [Task] LAT - CYLC - Operation test confirmation/Specification creation 2/24
- 09:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)