15 Sep 2024

17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 32/37 Thanthima Phaengkham
17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 33/37 Thanthima Phaengkham
17:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 34/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 35/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 36/37 Thanthima Phaengkham
17:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 37/37 Thanthima Phaengkham
17:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 80.00 hours (Project progress work #715 (Closed): CAPS - Installation)
Thanthima Phaengkham
17:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 10/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 9/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 8/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 7/10 Thanthima Phaengkham
17:28 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 6/10 Thanthima Phaengkham

11 Sep 2024

15:44 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation Thanthima Phaengkham

10 Sep 2024

10:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 5/10 Thanthima Phaengkham
10:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 4/10 Thanthima Phaengkham
10:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 3/10 Thanthima Phaengkham
10:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 2/10 Thanthima Phaengkham
10:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #715 (Closed): CAPS - Installation)
[Task] LAT - CAPS - Installation 1/10 Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
10:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
10:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
10:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
10:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
10:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
10:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
10:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 8/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
10:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 3/29 Thanthima Phaengkham
10:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
10:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation)
[Task] LAT - SALE - Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
10:04 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
10:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
10:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
10:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
10:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
09:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
09:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
09:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
09:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
09:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
09:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
STEP - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation)
[Task] LAT - STEP - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Parent project #542 (Closed): [PJ240019] CKD system for Logistics Alliance (Thailand) CO.,LTD CYLC)
[Task] LAT - STEP - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
09:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 232.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 29/29 Thanthima Phaengkham
09:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 28/29 Thanthima Phaengkham
09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 27/29 Thanthima Phaengkham
09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 26/29 Thanthima Phaengkham
09:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 25/29 Thanthima Phaengkham
09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 24/29 Thanthima Phaengkham
09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 23/29 Thanthima Phaengkham
09:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 22/29 Thanthima Phaengkham
09:38 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 21/29 Thanthima Phaengkham
09:32 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 20/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 19/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 18/29 Thanthima Phaengkham
09:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 17/29 Thanthima Phaengkham
09:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 16/29 Thanthima Phaengkham
09:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 15/29 Thanthima Phaengkham
09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 14/29 Thanthima Phaengkham
09:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 13/29 Thanthima Phaengkham
09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 12/29 Thanthima Phaengkham
09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 11/29 Thanthima Phaengkham
09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 10/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 9/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 8/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 7/29 Thanthima Phaengkham
09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 6/29 Thanthima Phaengkham
09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 5/29 Thanthima Phaengkham
09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 4/29 Thanthima Phaengkham
09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 3/29 Thanthima Phaengkham
09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 2/29 Thanthima Phaengkham
09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation)
[Task] LAT - REPO - Operation test confirmation/Specification creation 1/29 Thanthima Phaengkham
09:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 192.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
Thanthima Phaengkham
09:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 24/24 Thanthima Phaengkham
09:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 23/24 Thanthima Phaengkham
09:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 22/24 Thanthima Phaengkham
09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24 Thanthima Phaengkham
09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 21/24 Thanthima Phaengkham
09:16 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 20/24 Thanthima Phaengkham
09:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 19/24 Thanthima Phaengkham
09:15 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 18/24 Thanthima Phaengkham
09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 17/24 Thanthima Phaengkham
09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 16/24 Thanthima Phaengkham
09:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 15/24 Thanthima Phaengkham
09:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 14/24 Thanthima Phaengkham
09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 13/24 Thanthima Phaengkham
09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 12/24 Thanthima Phaengkham
09:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 11/24 Thanthima Phaengkham
09:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 10/24 Thanthima Phaengkham
09:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 9/24 Thanthima Phaengkham
09:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 8/24 Thanthima Phaengkham
09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 7/24 Thanthima Phaengkham
09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 6/24 Thanthima Phaengkham
09:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 5/24 Thanthima Phaengkham
09:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 4/24 Thanthima Phaengkham
09:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 3/24 Thanthima Phaengkham
09:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 2/24 Thanthima Phaengkham
09:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC - Operation test confirmation/Specification creation 1/24 Thanthima Phaengkham
 