Nattapol Poeam's activity
From 26 Jan 2024 to 04 Feb 2024
02 Feb 2024
- 16:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Function XD02 design for support operation monitor
- 16:56 KEYENCE (THAILAND) CO., LTD. 4.00 hours (Project progress work #427 (Closed): [ Support and install program ] for demo-kit WD)
- Install program and configuration equipment
- 09:33 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
- Simple installation PC Set and Mark postion label printer
- 09:32 THAI NIPPON FOODS CO., LTD. 4.00 hours (Sales support #86 (Closed): IoT Equipment for Water treatment project)
- Summarize equipment and check spec device
31 Jan 2024
- 20:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Drawing concept design
- 19:36 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Installation AMX PLC to Polystar machine
- 19:34 DAIFUKU (THAILAND) LTD. 8.00 hours (Sales support #415 (Closed): [Requirement and support] Installation camera Area 1-3)
- Pick up equipment of Area 3 at Daifuku and meeting at Trope
30 Jan 2024
- 21:35 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #328 (Closed): Crate IoT data collection box for JATH)
- Send demo box to Mantenance JATH team
- 21:29 DAIFUKU (THAILAND) LTD. 4.00 hours (Project progress work #406 (Closed): Prepare equipment for installation for Area1)
- Pick up equipment of Area 3 at Daifuku
- 21:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #405 (Closed): [Requirement definition] Infrastructure IoT system for Jtekt Automotive)
- Meeting and site survey
- 21:18 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #225 (Closed): CCTV Installation)
- Support on-site about confrim power cable and lan cable in table
- 21:16 TOMAS TECH CO., LTD. 8.00 hours (Sales support #404 (In Progress): OTICS (Thailand) Company Limited meeting about IoT system and site servey)
- Site survey MDB,Panel control point
- 21:08 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #403 (Closed): Summarize equipment of Water treatment project)
- Summarize equipment
- 21:03 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 8.00 hours (Project progress work #402 (Closed): Modification program for record S/N to CF-Card)
- On-site service tuning camera SRX-300
- 21:02 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 8.00 hours (Project progress work #402 (Closed): Modification program for record S/N to CF-Card)
- Support after install program to machine
- 21:01 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 8.00 hours (Project progress work #402 (Closed): Modification program for record S/N to CF-Card)
- Install program line MC30 OP80
- 21:01 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 8.00 hours (Project progress work #402 (Closed): Modification program for record S/N to CF-Card)
- Install program line MC30 OP80
- 20:55 THAI NIPPON FOODS CO., LTD. 4.00 hours (Sales support #86 (Closed): IoT Equipment for Water treatment project)
- Site survey
- 20:52 TOMAS TECH CO., LTD. 5.00 hours (Sales support #269 (Closed): Automation for receiving and shipping of Fabrinet )
- Meeting about overall concept at site
- 20:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Database and function design
- 20:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Database and function design
- 20:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Database and function design
- 20:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Database and function design
- 20:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Database and function design
- 20:45 TOMAS TECH CO., LTD. 4.00 hours (Sales support #312 (Closed): Fanuc traning and appointment Fanuc staff)
- Trining function of Fanuc MT-Link
- 20:44 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- On-site to support problem machine brakedown
- 20:36 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- On-site support after installation module PLC of Polystar
- 20:27 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF)
- Installation TB-Box in Plant A
- 20:39 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 8.00 hours (Project progress work #401 (Closed): Site survey for confrim location display)
- Site survey
- 20:26 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Program design
- 20:20 BIG STAR CO., LTD. 8.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
- Internal meeting with Keyence team
- 20:08 BIG STAR CO., LTD. 8.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
- Summarize machine concept and discus other function machine
- 20:07 BIG STAR CO., LTD. 8.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
- Meeting about presentation overall concept and function machine *Customer request to change concept of machine
- 20:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #398 (Closed): Make concept and summarize equipment for Interlock system prohect)
- Make and summarize concept of insterlock system