Kittisak Isarapongporn's activity
From 19 Oct 2023 to 28 Oct 2023
28 Oct 2023
- 13:38 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #153 (Close request): HTA_NSET completion fix bug.
- 13:38 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #42 (Close request): HT-Label printing system
27 Oct 2023
- 17:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Close request): Inbound Inquiry Report problem
- 17:39 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
26 Oct 2023
- 17:16 TOMAS TECH CO., LTD. Project progress work #144 (Close request): PLC alarm record and send to wdt-clients2.
- 17:16 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #149 (Close request): Request to test the modified with new packing app
- 17:16 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #59 (Close request): Support installation HT-Label printing system
- 17:16 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #42 (Close request): HT-Label printing system
- 17:15 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #152 (Close request): Found the incorrect barcode generated
- The Code39 barcode library has been replaced with FreeSpire.
- 15:13 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #152 (Closed): Found the incorrect barcode generated
- Problem/Issue:
Found an error of incorrect barcode generated in label print software.
Causes:
It would have oc... - 15:06 A.N.I. LOGISTICS, LTD. Problem-Bug #151 (Interruption): Changed request: HATC's date format will be changed on this November
- Problem/Issues:
K.Khwanchai informs the HATC's date format will be changed to '01-Nov-23' on November.
He will sen...
25 Oct 2023
- 20:00 SIAM DENSO MANUFACTURING CO., LTD. Problem-Bug #78 (Close request): Found problem about the alarm of sequnce
- 19:59 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #91 (Close request): Modify Pegasus.
- 19:59 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #148 (Close request): Modify the store procedure to support the extended length of pallet
- 19:54 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #148 (Closed): Modify the store procedure to support the extended length of pallet
- Modify the store procedure and change the table schema to support the extended 14-character length of the pallet.
Li... - 19:58 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #149 (Closed): Request to test the modified with new packing app
- Request to test the modification with the new packing app to support the new extended 14-character length of the pall...
- 19:40 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Close request): Found the problem schedule not found on receive area of pc 37356X931008
- 19:39 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Closed): Found the problem schedule not found on receive area of pc 37356X931008
- Problem:
Schedule not found on receive area of pc 37356X931008
Causes:
There are some incorrect data in the mast... - 14:03 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Close request): Enhance the Store procedure to generate Production outer schedule
- 14:02 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Closed): Enhance the Store procedure to generate Production outer schedule
- Problem: Found the problem that the import function will reject all data when the duplicate occurs.
Solutions: Add...
24 Oct 2023
- 18:59 ASTEER (THAILAND) CO., LTD. Project progress work #21 (Close request): Handy terminal application system Development.
- 18:59 SHODENSHA (THAILAND) CO., LTD. Problem-Bug #60 (Close request): Procedure manual application development modifictaion problem
- 18:59 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Close request): Install function Cancel inbound and outbound
- 18:59 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
20 Oct 2023
- 17:22 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Close request): Add delete function
19 Oct 2023
- 20:47 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Close request): The power went off
- 20:46 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Closed): The power went off
- Support to restart the system and checking
- 18:10 TOMAS TECH CO., LTD. Project progress work #35 (Close request): PLC alarm record and send to line notify
- 10:17 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #47 (Close request): create spectification document
- 10:17 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #56 (Close request): Packing system no need scan pallet no
- 10:11 A.N.I. LOGISTICS, LTD. Problem-Bug #58 (Close request): [CKD Pegasus system phase 1&2]Packing data not found error on Handy and Tablet in outer packing area
Also available in: Atom