Arunwit Isarapongporn's activity

From 04 Oct 2023 to 13 Oct 2023

11 Oct 2023

08:21 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cabin...
Arunwit Isarapongporn

10 Oct 2023

08:45 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cable...
Arunwit Isarapongporn

07 Oct 2023

00:03 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #9 (In Progress): Installation update scripts delta line of traceability system
Issue ATA -06-10-2023
1. Function search
- Part No. separated between BorgWarner and Delta.
2. Function search...
Arunwit Isarapongporn

06 Oct 2023

23:58 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8: Support installation for power supply and LAN cable for 50 points
Install power plugs and LAN connections in chip room for 50 point Arunwit Isarapongporn
08:54 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8 (In Progress): Support installation for power supply and LAN cable for 50 points
today install 10 position
and tomorrow install 10point
Arunwit Isarapongporn
08:52 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points
Support installation for power supply and LAN cable for 50 points
- Control and coordinate between wiring or LAN ins...
Arunwit Isarapongporn
09:05 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #9 (Closed): Installation update scripts delta line of traceability system
Update scripts web application of traceability system and update SQL trigers on DB3 Arunwit Isarapongporn
 